ENCLOSURE 1

NOTICE OF VIOLATION Flor ida Power and Light Company Turkey Point Unit 4 Docket No. 50-251 License No.

DPR-41 The following violation was identified during an inspection conducted on February 3-7, 1986.

The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR 2, Appendix C).

Title Ten, Code of Federal Regulations, Part 50, Appendix B, Criterion V

requires activities affecting quality be accomplished in accordance with documented procedures containing appropriate acceptance criteria.

American Society of Mechanical Engineers Boiler and Pressure Vessel (ASME BSPV)

Code Section'XI, 1980 through winter 1981 addenda Paragraph IMP-3111, requires that new reference values be determined or previous values be verified by an inservice test run when a reference value or a set of values may have been affected by repair of a pump.

FPSL Procedure OP-4004.1 has been identified as the applicable procedure for Testing Containment Spray Pump 4B as required by ASME BIPPY Code Section XI.

Contrary to the above, Procedure OP-4004. 1 did not contain appropriate acceptance criteria in that, after a repair to the 4B Containment Spray Pump, which reduced the vibration values by a factor of three, the reference value for vibration and the associated acceptance criteria in Procedure OP-4004. 1 were not amended to reflect the lower vibration values obtained during the post repair test.

This is a Severity Level IV Violation (Supplement I).

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice, a written statement or explanation in reply, including:

(1) admission or denial of the alleged violation; (2) the reasons for the violation if admitted; (3) the corrective steps which have been taken and the results achieved; (4) corrective steps which will be taken to avoid further violations; and (5) the date when full compliance will be achieved.

Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.

APR 15 1886 8b042i 0183 86041 5 PDR ADOCK 05000250 PDR ~

4

'I t

'Ht W

h'w tw H

w lt '

II I

tl

'C H'I V

I l

II 1

wt V

t H

It r

V

'h lf I,H H'f H

It h I

h I c

h I

tt )

'll h

r h

j I

I w

h w E.

II:.

f'f, I

t w lt

~ 'fj o

~