Notice of Violation from Insp on 860113-0210
ML17342A411
Person / Time
Site: Turkey Point  
Issue date: 03/06/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML17342A410 List:
References
50-250-86-05, 50-250-86-5, 50-251-86-05, 50-251-86-5, NUDOCS 8603110313
Download: ML17342A411 (2)


Text

ENCLOSURE 1

NOTICE OF VIOLATION Florida Power and Light Company Turkey Point Units 3 and 4

Docket Nos.

50-250 and 50-251 License Nos.

DPR-31 and DPR-41 The following violation was identified during an inspection conducted on January 13 February 10, 1986.

The Severity Level was assigned in accordance with the NRC Enforcement Policy (10 CFR Part 2, Appendix C).

Technical Specification (TS) 6.8. 1 requires that written procedures and administrative policies be established, implemented and maintained that meet or exceed the requirements and recommendations of sections

5. 1 and 5.3 of ANSI N18.7-1972 and Appendix A of USNRC Regulatory Guide 1.33.

ANSI N18.7-1972, section 5.3.5, requires that permission to release equip-ment for maintenance be granted by operating personnel.

The equipment shall be made safe to work on.

Measures shall provide for the protection of workers and equipment and strict control measures shall be enforced.

Administrative Procedure 0103.4, In-Plant Equipment Clearance

Orders, dated August 28,
1985, implements ANSI N18.7-1972, section 5.3.5.

Section 8.7 of the procedure requires completion of a request for temporary liftof clearance prior to manipulating a clearance tagged valve.

Contrary to the above, between November 19 and December 10,

1985, licensee personnel operated clearance tagged valves without obtaining the required temporary lift authorization.

This is a Severity Level IV violation (Supplement I).

Pursuant to 10 CFR 2.201, you are required to submit to this office within 30 days of the date of this Notice a written statement or explanation in reply including:

(1) admission or denial of the alleged violation, (2) the reasons for the violation if admitted, (3) the corrective steps which have been taken and the results

achieved, (4) corrective steps which will be taken to avoid further violations, and (5) the date when full compliance will be achieved.

Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.

Date:

QAQ 6 1986 BbPg~R AQOCK ~

pQg 6

~

~-