Forwards NRC Technical Ltr Rept, Site Survey of Turkey Point,Units 3 & 4,Maint Program & Practices, as Part of 851212 NRC Maint & Surveillance Program Survey & Evaluation of Maint Effectiveness Project
ML17342A390
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/13/1986
From: Mcdonald D
Office of Nuclear Reactor Regulation
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17342A391 List:
References
NUDOCS 8603030029
Download: ML17342A390 (4)


Text

February 13, 1986 Docket Nos.

50-250 50-251 Mr. C. 0. Woody, Group Vice President Nuclear Energy Department Florida Power and Light Company Post Office Box 14000

'Juno Beach, Florida 33408

Dear Mr. Woody:

SUBJECT:

Maintenance Site Survey - Turkey DISTRIBUTION:

'ocket Nos. 50-250/251)

NRC PDR B. Grenier Local PDR J. Jankovich PAD 2 R/F T. Novak OELD E. Jordan B. Grimes J. Partlow D. McDonald C.

Vogan L. Rubenstein ACRS (10)

Tech.

Branch Gray File Point Pl ant Units 3 and 4

Enclosed is a copy of the Nuclear Regulatory Commission (NRC) staff's trip report of the maintenance survey conducted at the Turkey Point site during the week of December 2,

1985.

The survey was conducted by a NRC team which included contractor personnel from Pacific Northwest Laboratory.

The site survey at Turkey Point is part of the NRC Maintenance and Surveillance Program's Survey

.and Evaluation of Maintenance Effectiveness Project.

The details contained in the trip report describe the status of the Turkey Point maintenance program at the time of NRC team s site visit.

The trip report is provided for your information and requires no response.

However, should you or your staff identify any factual errors or have any questions, please contact me.

Sincerely,

Enclosure:

As stated

/s/

Daniel G. McDonald, Project Manager PWR Project Directorate P2 Division of PWR Licensing-A Office of Nuclear Reactor Regulation cc w/

Enclosure:

See next page PM:PA D.A-DGMcDo ld;bg L

2/ j(/86 I( /8 in 8b03030029 85000250 b02f3 ppR ADQCH, 0 pDR p

r t

l I ',1 e

1 1

'e'qW II II[

III II A

~ l e

4

\\

~

L $

5 ~

r l

N I

m

Mr. C. 0.

Woody Florida Power and Light Company Turkey Point Plant CC:

Harold F. Reis, Esquire Newman and Holtzinger, P.C.

1615 L Street, N.W.

Washington, DC 20036 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Norman A. Coll, Esquire

Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Mr. C.

M. Wethy, Vice President Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Mr. M. R. Stierheim County Manager of Metropolitan Dade County Miami, Florida 33130 Resident Inspector U.S. Nuclear Regulatory Commission Turkey Point Nuclear Generating Station Post Office Box 57-1185 Miami, Fl orida 33257-1185 Mr. Allan Schubert, Manager Public Health Physicist Department of Health and Rehabilitative Services 1323 Winewood Blvd.

Tallahassee, Florida 32301 Intergovernmental Coordination and Review Office of Planning 5 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Administrator Department of Environmental Regulation Power Plant Sitinq Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street Atlanta, Georgia 30323 Martin H. Hodder, Esquire 1131 NE, 86th Street Miami, Florida 33138 Joette Lorion 7269 SW, 54 Avenue Miami, Florida 33143 Mr. Chris J. Baker, Plant Manager Turkey Point Nuclear Plant Florida Power and Light Company P.O.

Box 029100 Miami, Florida 33102 Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304

'(

ji