UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 ENCLOSURE 1
SAFETY EVALUATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION RELATED TO REQUESTS FOR RELIEF FROM FIRST TEN-YEAR INSERVICE INSPECTION REQUIREMENTS FLORIDA POWER AND LIGHT COMPANY TURKEY POINTS UNITS 3 AND 4 DOCKET NOS. 50-250/251 INTRODUCTION Technical Specification for the Turkey Points Units 3 5 4 Nuclear Power Generating Station states that inservice examination of ASME Code Class I, 2, and 3 components shall be performed in accordance with Section.XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50.55a(g) except where specific written relief has been granted by the Commission.
The Inservice Inspection Section of the Materials Engineering Branch, Division of Engineering, has reviewed the licensee's first ten-year interval inservice inspection program plan and the requests for relief from certain requirements of the applicable ASME Code and addenda.
We had provided a Safety Evaluation Report (SER) on April 8, 1983.
We had granted relief from the examination requirements which we had determined to be impractical to perform at the Turkey Point Plant Units 3 It 4.
We had also denied relief in those cases where the necessary findings could not be made.
In order to complete the first ten-year inspection interval at the Turkey Point Plant Units 3 5 4, relief from certain inservice inspection requirements in the 1974 Edition of the ASME Code Section XI with Addenda through Summer 1975 is required.
860i090548 85l226 PDR ADOCK 05000250 6
I'
EVALUATION Requests for relief from the requirements of Section XI which have been determined to be impractical to perform have been reviewed by the Staff's contractor, Science Applications International Corporation.
The contractor's evaluations of the licensee's requests for relief and his recommendations are presented in the Technical Evaluation Report (TER) attached (ATTACHMENT I).
The staff has reviewed the TER and adopts the evaluations and recommendations.
A summary of the determinations made by the staff is presented in the following table:
TABLE 1 CLASS 1 COMPONENTS LICENSEE PROPOSED IN"2500"1 IMB-2500-1 SYSTEM OR AREA TO BE REQUIRED ALTERNATIVE RELIEF RE(VEST ITEM NO.
EXAM. CAT.
COMPONENT EXAMINED METHOD EXAMINATION STATUS
'1.
2 B-B Reactor Vessel Longitudinal and Circum-ferential welds in shell and meridional and circum-ferential welds in vessel heads Volumetric Volumetric to Granted Extent Practical and hydrostatic test per category B-P Bl.3 B1.4 B"C B-D Reactor Vessel Reactor Vessel...
Vessel to flange and head to flage circumferential welds Nozzle to Vessel weld and nozzle inside radius Volumetric Volumetric Volumetric to Extent Practi-cal leakage tests and hydro-static tests per category B"P Volumetric to to Extent Practical and hydro-static test per category B-P Granted Granted
TABLE 1 CLASS 1 COMPONENTS (continued)
IMB-2500-1 ITEM NO.
IMB-2500-1 EXAM. CAT.
SYSTEM OR COMPONENT AREA TO BE EXAMINED REQUIRED METHOD LICENSEE PROPOSED ALTERNATIVE EXAMINATION RELIEF REQUEST STATUS B4. 5 B4. 6 B-J Piping Circumferential Volumetric and pipe and longitudinal branch pipe welds connections Volumetric to Extent Practical and hydrostatic test as per category B-P Granted B5. 4 8-K-1 Pump Integrally Supports welded external support attach-ments Surface Surface exam per ISI schedule.
Upon disassembly of of pump from pad-surface exam inaccess-able area.
- Granted, provided if flaw indications are found during exam of accessable
- areas, pump shall be removed from pad and 100X surface exam
CONCL'USION Based on the review summarized and pursuant to 10 CFR 50.55a(g)(6)(i),
the staff concludes that relief granted from the examination and testing requirements and alternate methods imposed through this document give reasonable assurance of the piping and component pressure boundary and support structural integrity, that granting relief where the Code requirements are impractical is authorized by law and will not endanger life or property, or the common defense and security, and is otherwise in the public interest considering the burden that could result if they were imposed on the facility.
Dated:
PRINCIPAL CONTRIBUTOR:
B. Turovlin