ML17341B608

From kanterella
Jump to navigation Jump to search
Amends 91 & 85 to Licenses DPR-31 & DPR-41,respectively, Changing Tech Specs to Identify Horizontal Tendon 64H50 as Surveyed During First,Third,Fifth & Tenth Yr Surveillance
ML17341B608
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/13/1983
From: Varga S
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17341B609 List:
References
NUDOCS 8301240181
Download: ML17341B608 (7)


Text

i UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 FLORIDA POWER AND LIGHT'COMPANY DOCKET NO. 50-250 TURKEY POINT PLANT UNIT NO; 3

AMENDMENT TO FACILITY OPERATING LICENSE Amendment No..91 License No.

DPR-31 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Florida Power and Light Company (the licensee) dated November 5, 1982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

D.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and ('ii) that such activities will be conducted, in compliance with the Commission's regulations; I

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

8301240181 830113 PDR ADOCK 05000250' P

, PDR 4

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No.

DPR-31 is hereby'amended to read as follows:

(B)

Technical S ecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 91, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3.

Within 30 days after the effective date of this amendment, or such other time as the Commission may specify, the licensee shall satisfy any applicable requirement of P.L.97-425 related to pursuing an agreement with the Secretary of Energy for the disposal of high-level radioactive waste and spent nuclear fuel.

4.

This license amendment is effectivd as of the date of its issuance.

F THE N

EAR REGULATORY COMMISSION even A.

ar

, Chief

Attachment:

Changes to the Technical Specifications Date of Issuance:

January 13, 1983 Operating Rea ors Branch 81 Division of L ensing

I

~pS RECy,

~ (4 P0 Cy

~s O

IVl f

O~

+a*++

1 UNITEDSTATES NUCLEAR REGULATORY, COMMISSION WASHINGTON, D. C. 20555 FLORIDA POWER AND'LIGHT COMPANY DOCKET NO. 50-251 TURKEY POINT"PLANT'UNIT NO; 4

'MENDMENT TO FACILITY OPERATING LICENSE Amendment No.. B5 License No.

DPR-41 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

B.

,C.

D.

The application for amendment by Florida Power and Light Company (the licensee) dated November 5, 1.982, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and ('ii) that such activities will be conducted; in compliance with th'e Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the gechnical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of Facility Operating License No.

DPR-41 is hereby'amended to read as follows:

(B)

Technical S ecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 85, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications.

3,.

Within 30 days after the effective date of this amendment, or such other time as the Commission may specify, the licensee shall satisfy any applicable requirement of P.L.97-425 related to pursuing an agreement with the Secretary of Energy for the disposal of high-level radioactive waste and spent nuclear fuel.

4.

This license amendment is effectivd as of the date of its issuance.

T8E NU I

A REGULATORY COMMISSION

arga, C ref

Attachment:

Changes to the Technical Specifications Date of Issuance:

January 13, 1983 Operating Reacto'ranch 81 Division of Lice sing A

ATTACHMENT TO LICENSE AMENDMENTS AMENDMENT NO.

91 TO FACILITY OPERATING LICENSE NO.

DPR-31 AMENDMENT NO. 85 TO FACILITY OPERATING LICENSE NO.

DPR-41 DOCKET NOS.

50-250 AND 50-251 Revise Appendix A as follows:

Remove Pa e

4.4 4

Insert Pa e

4.4-4

4.4. 5

'TENDON SUR VE ILLAHCE Lift-off Unit 4 Lift-offreadings will be taken for the following nine (9) tendons available for inspection:

Unit 3 Horizontal 62H18, 42H70, 64H50 Veritcal 23V1, 45V7, 61V1 Dome 1053,

2028, 3028 62H381 42H80$

64H70 12V29, 34V29, 56V29

1028, 2D 3, 3D28 Wire Inspection One horizontal, one vertical and one dome tendon will be relaxed and one wire will be removed from eacn as a sample.

(At subsequent inspections differ ent tendons will be used for the sample).

Wires will be visually inspected for corrosion and pitting.

Tensile tests will be performed on three (3) samples cut from each wire (on from each end and 'one from the middle) of a length equal to the maximum length acceptable for the test apparatus to be used.

After samples are taken, tendons will be retensioned and final lift-offreadings will be 'taken.

Test Fre uency Lift-offreadings and wire inspection will take place at the end of the first, third and every fifth year thereafter from the date of the structural integrity test (July 4, 1971, for Unit 3 and February 19, 1972 for Unit 4).

Tendon surveillance may be conducted during reactor operation.

Amendment Nos.

91 8 85 4,4 4