Text
Pg (l~
FF.g
0 2 1982
Florida Power
and Light Company
ATTN:
Dr.
R.
E. Uhrig, Vice President
Advanced
Systems
and Technology
P. 0.
Box 529100
Miami, FL
33152
Gentlemen:
Subject:
Report Nos.
0-250/81-31
d 50-251/81-31
This refers to the special
safety inspection
conducted
by Mr. S.
A. Elrod of this
office on December 1-3, 1981, of activities authorized
by
NRC Operating
License
Nos.
DPR-31 and
DPR-41 for the Turkey Point facility.
Our preliminary findings
were discussed
with Mr. J.
Hays, Plant Manager, at the conclusion of the
inspection.
Areas
examined during the inspection
and our findings are discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
During the inspection, it was found that certain activities under your license
appear
to violate
NRC requirements.
These
items
and references
to pertinent
requirements
are listed in the Notice of Violation enclosed
herewith
as
Appendix A.
Elements to
be included in your response
are delineated
in
Appendix A.
As detailed
in the Notice, the overpressure
mitigating system
was inoperable
on
two occasions
when called
upon to perform its safety function.
We
have
a more
than usual
concern
about this matter
and shall evaluate
your response
to the
Notice to determine if further enforcement action is warranted.
Accordingly,
please
give this matter your particular attention.
One
new unresolved
item is identified in the enclosed
inspection report.
This
item will be examined during subsequent
inspections.
In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosures will
be placed
in the
NRC's Public Document
Room unless
you notify this office, by
telephone,
within ten days of the date of this letter
and submit written
application to withhold information contained
therein within thirty days of the
date of this letter.
Such application must
be consistent with the requirements
of 2.790(b)(1).
The responses
directed
by this letter and the enclosures
are not subject to the
clearance
procedures
of the Office of Management
and Budget as required
by the
Paperwork
Reduction Act of 1980,
PL 96-511.
8203250310
820316
ADGCK 05000250
~
~
,L)
J
.
y
!
Florida Power 5 Light Company
FEB 0-2 1982
Should you have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection
Report
Nos. 50-250/81-31
and 50-251/81-31
cc w/encls:
H.
E. Yaeger, Site Manager
J.
Hays, Plant Manager
bcc w/encl:
NRC Resident
Inspector
Document
Management
Branch
State of Florida
James
P. O'Reilly
Regional Administrator
RII
RIIg
t
SE rod
r
K andis
42j gl
i/~ e~
j/~Iv
RII
HCDance
12(y /8
ewTs
/81
f:),
"')
<I.>i)
f
I~.
~ Igfl
()'>" l