C Docket Nos.
50-250 and 50-251 Qrt.. Robert E. Uhrfg, Vice President Advanced Systems and Technology Florida Power and Light Company Post Office Box 529100 tifamf, Florida 33152 FEB f 8198K DISTRIBUTION Dockets NRC PDR L PDR NSIC ORB 81 Rdg DEisenhut OELD IE ACRS-10 CParr'ish hIGrotenhuis SBajwa N. B.
Le Gray Fil'e mam) etu" RO 4)
>0'Vl QO
. Olg FO0 O'lm OIQI OB alU1 t$ caWi XO
Dear Dr. Uhrfg:
SUBJECT:
ENVIRONh1ENTAL QUALIFICATION OF SAFETY-RELATED ELECTRICAL E(UIPHENT REQUEST FOR ADDITIONAL INFORMATION On January 8, 1982 we requested additional information concerning the Envfr onmental gualfffcatfon (Eg) of Safety-Related Electr;fcal Equi pment.
Our contractor (Franklin Research Center) identified information, 4n most cases referenced from your submfttals, which we need fn. order to complete our review.
This request fs a supplement to the January 8, 1982 letter.
He request that you supply this information within 30 days of the date of this letter.
Please-send a full submittal to Franklin Research Center (address fn Enclosure) and only the cover letter to us.
Address the letter to S. Varga, Chief, Operating.Reactors Branch No. 1.
Please contact your Project Manager for further adsfstance fn this regard.
This request i'r information was approved by the Office of Management d
Budget under clear. ance number 3150-0065 which expires Hay 31, 1983 C
I Sincerely, y S$ 5QQ6 7 g
S A Var'Sa Steven A. Varga, Chic Operating Reactors Bra 81
" ><Pe~,~M Division of Licensing
Enclosure:
Request. for Additional.
Infor'matfon
')
cc w/enclosure:
See next page OFFICEI SURNAME/
DATEi ORB 81,DL htGrotenhui 02/((/82,;d
,'L
~
~
~
~ ~
~
~ ~ ~ ~ 0 ~ ~
0 (82
~ NRC FORM 318 (10-80) NRCM 0240 OFF)CIAL RECORD COPY USGPO! 1991~~960
4l II
~\\
~-
~
~
Robert E. Uhrig Florida Power and Light Company cc:
Mr. Robert Lowenstein, Esquire Lowenstein, Newman, Reis and Axelrad 1025 Connecticut Avenue, N.W.
Suite 1214 Washington, D. C.
20036 Environmental and Urban Affairs Library Florida International University Miami, Florida 33199 Mr. Norman A. Coll, Esquire
- Steel, Hector and Davis 1400 Southeast First National Bank Building Miami, Florida 33131 Mr. Henry Yaeger, Plant Manager Turkey Point Plant Florida Power and Light Company P. 0. Box 013100 Miami, Florida 33101 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Resident Inspector Turkey.Point Nuclear Generating Station U. S. Nuclear Regulatory Commission Post Office Box 1207 Homestead, Florida 33030 James P. O'Reilly Regional Administrator - Region II U. S. Nuclear Regulatory Commission 101 Marietta Street - Suite 3100 Atlanta, Georgia 30303
O~
TURKEY POINT UNIT NO.
3 RFZM5257-479 FRC REVIEW OF INSTALLED TRI ACTION PLAN ITEMS Information Re uested Date Received b
FRC**
.1.
Reference 5 does not provide adequate detail with respect,to identification of MZ Action Plan equipment installed as of 1/1/81.
a.
Identification of all TMZ Action Plan equipment installed as of 1/1/81 is requested.
b.
Identification of 'QiZ Action Plan equipment installed with implementation dates after 1/1/81 is requested.
C>>
The correlation of these equipment items with the specific sections of NUREG-0737
[6] presented below (as applicable) is requested.
r For PWRs, Sections:
ZZEl 2g ZIE4 ~ 2t ZIE3 1'g IIGlg ZIF2g ZID3, ZIK3.12(Wx), ZIK3.9(Wx),
IIK2 10 {BGW) g ZIB3 g IIE4>> 1
[The correlation is needed to ensure that all items are included in the review, e.g., if a transmitter is identified as a WI'ction, Plan item, are the cable and terminal blocks associated with the device also identified?]
(FRC previously requested this information in Reference 3'.)
d>>
For all installed
'IRZ Action Plan equipment identified, a System Component Evaluation Worksheet (SCEW) (in accordance with 79-01B format) is requested.
{FRC previously requested this information in Reference 3.)
e.
Identification of 24Z Action Plan equipment items in Refer"nce 2 is requested (only items whose SCEW sheets have been added,, revised, or had their page numbers changed from Reference 5
need, be identified).
00 FranMin Research Center AOI4eke d The Franldtn Insaute
(/
~,
I J
RFIM5257-479 Date Received b
FRC**
f.
The approximate installation date for the TMI Action Plan equipment items is requested so that the appropriate qualification criteria (NUREG-0588 or DOR Guidelines) can be used in the EEQ evaluation.
(FRC previously requested this information in Reference 3.)
2.
The qualification documents, e.g.,
the actual test reports and associated correspondence cited as evidence of qualification l'isted on the SCEN sheets, for all identified TMZ Action Plan equipment are requested.
(The identification of those reports considered to be proprietary is requested so that proper control of documents can be maintained.]
3.
Where the Licensee has a standard Owners'roup position with respect to a NUREG-0737 technical area or has requested extensions of implementation dates, this information is requested in order to incorporate it into the review.
4.
In Reference 3',
FRC had also previously requested.
the following information:
a.
The environmental service conditions (for all plant areas) listed in Attachments l, 2, and 3 of the original 79-'01B submittal Reference l.
(These are the temperature and pressure profiles.)
b.
The normal environmental service conditions inside the containment and also the HELB profiles in areas where equipment within the scope of this review is located.
c.
For the electrical'ables listed in Reference 5, what is the justification for the conclusion that the referenced test reports are applicable to the cable installed in the plant2 In other,
- words, what is the specific applicability between the test specimen and the installed cable.
(III Franklin Research Center AOhbdn ctIhe fran Insaate
i+i
~i
RFI-C5257-479 ZNSTRUCTZONS FOR TRANSMITTZNQ INFORMATION REQUESTED 1.
The schedule for completion of the FRC assignment requires that the Licensee provide the requested information withingod~ps of the date of the RPI.
2.
retransmit the requested information as follows:
o cover letter to NRC and complete package to PRC'.
PRC mailing address is as follows:
Mr. Cyril J. Crane Franklin Research Center The Parkway at Twentieth Street Philadelphia, PA 19103 Telephone No. 215/448-1353 Telecopy No. 215/448-1296 Telecopy Confirmation No. 215/448-1215
)I) Franklin'Research Center ADMolond Ihe fnnNn InsAae
)F 4
h I
~ TURKEY POINT UNIT NO.
4 RPI-CS257-480 PRC REVIEW OP INSTAILED KHZ ACTION PLAN ITEMS Information Re uested l.
- Reference 5 does not provide adequate detail with respect to identification of THI Action Plan equipment installed as of 1/1/81.
a.
Identification of all TNZ Action Plan equipment installed as of 1/1/81 is requested.
Date Received b
PRC**
b.
Identification of TMZ Action Plan equipment installed with implementation dates after 1/1/81 is requested.
c.
The correlation of these equipment items with the specific sections of NUREG-0737
[6] presented below (as applicable) is requested.
Por PWRs, Sections:
IIEl 2g IIE4 2g ZZE3 1 r ZIGlp ZIP2p ZID3 r IIK3 12 (WX) r IIK3~ 9 (WX) r IIK2.10 (BGW) i IIB3i ZIE4 ~ 1.
(The correlation is needed to ensure that all items are included in the review, e.g., if a transmitter is identified as a THI Action Plan item, are the cable and terminal blocks associated with the device also identified7]
(PRC previously requested this information in Reference 3.)
d.
Por all installed TMI Action Plan equipment identifiedr a System Component Evaluation Worksheet (SCEW) (in accordance with 79-01B format) is requested.
(PRC previously requested this information in Reference 3.)
e.
Identification of 'LRI Action Plan equipment items in Reference 2 is requested (only items whose SCEW sheets have been added,
- revised, or had their page numbers changed from Reference 5
need be identified).
l)ll Franklin Research Center h ohtaon or The Franklin Insole
RFI~5257-480 Date Received b
FRC*>>
The approximate installation date for the TMI Action Plan equipment items is requested so that the appropriate qualification criteria (NUREQ-DSSS or DQR Guidelines) can. be used in the EEQ evaluation.
(FRC previously requested t:his information in Reference 3.)
2.
The qualification documents, e.g.,
the actual test reports and associated correspondence cited as evidence of qualification listed on the SCEW sheets, for all.i'dentified TMI Action Plan equipment are requested.
(The i'dentification of those reports considered to be proprietary is requested so that proper control of documents can be maintained.]
3.
Where the Licensee has a standard Owners'roup position with respect to a NUREG-0737 technical area or has requested extensions of implementation dates, this information is requested in order to incorporate it into the, review.
4.
In Reference 3,
FRC had also previously requested the following information:
a.
The environmental service conditions (for all plant areas) listed in Attachments 1>
2, and 3 of the original 79-OIB submitta1 Reference l.
(These are the temperature.
and pressure profiles.)
b.
The normal environmental service conditions inside the contairint and also the HELB profiles in areas where equipment within the scope of this review.
is located.
c.
For the electrical cables listed in Reference 5, what is the justification for the conclusion that the referenced test reports are applicable to the cable
'installed in the plant2 In other, words, what is, the specific applicability between the test specimen and the installed cable.
Ill Franklfn Research Center h Oh%on d The Frankln Induce
0 1
RPIM5257-480 INSTRUCTIONS POR TRANSMITTING INFORMATZON REQUESTED 1.
The schedule for.completion of the PRC assignment requires that the
. Licensee provide the requested information within 3~ dai~s of the date of the RPZ 20 o
'P cover letter to NRC and complete package to PRC.
PRC mailing address is as follows:
Mr. Cyril J.
Crane Franklin Research Center The Parkway at Twentieth Street Philadelphia, PA 19103 Telephone No. 215/448-1353 Telecopy No. 215/448-1296 Telecopy Confirmation No. 215/448-1215 l)ll FranMfn Research Center AOlvtske ot The FsanNn Iroaute
R E
Uhrig
'etter to J.
P. O'Reilly
{NRC)
Subject:
Response
to Items 1, 2> and 3 of IE Bulletin 79-01B Florida Power a Light Co., 02>>Jun-80, L-80-166 2.
Environmental.Qualification of Electrical Equipment - IE Bulletin 79;01B; Response to the Safety Evaluation Report by the Office of Nuclear Reactor Regulation Florida Power
& Light Co., August 1981 3.
Telephone Memorandum M. Williams, M. Grotenhaus, T.
Le (NRC); D. Channey, L. Craig, R.
Kaminsky (FPaL) r and C. J.
- Crane, R. Krapf, W. Steigelmann (FRC)
Subject:
TMI-Action Plan Review Request for Additional Information Dated August 14, 1981 4.
Office of Nuclear Reactor Regulation Safety Evaluation Report for Turkey Point Units 3 and 4
Environmental Qualification of Safety-Related Electrical Equipment NRC, 21-May-81 5.
R.
E. Uhrig Letter to J.
P. O'Reilly (NRC)
Subject:
Supplements to Response to IE Bulletin 79-01B, Supplement 3
dated July 3, 1980 Florida Power a Light Co., 12-Feb-81, L-81-49 6.
NUREG-0737, "Clarification of TMI Action Plan Requirements" NRC, November,1980 (Il Franklin Research Center ADhtskn at The Franklin~
Oi 1[
A-T f