Forwards IE Insp Repts 50-250/81-30 & 50-251/81-30 on 811207-11.No Noncompliance Noted
ML17341A830
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/31/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17341A831 List:
References
NUDOCS 8201270412
Download: ML17341A830 (3)


See also: IR 05000250/1981030

Text

l3PQ 5 i)SB)

IE HQg~PP+

Florida Power and Light Company

ATTN:

Dr.

R.

E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0.

Box 529100

Miami, FL

33152

Gentlemen:

Subject:

Report Nos. 50-250/81-30

nd 50-251/81-30

8

a~~

s

~~PC~)

7!i

~+us

~82~

J-'gg

f4

2

.. j>

Cg

fo

This refers to the routine safety inspection

conducted

by Mr. P.

E. Fredrickson

of this office on December

7-11,

1981, of activities authorized

by

NRC Operating

License

Nos.

DPR-31

and

DPR-41 for the Turkey Point facility and to the discus-

sion of our findings held with Mr. H.

E. Yaeger, Site Manager, at the conclusion

of the inspection.

h

Areas

examined

during

the

inspection

and

our findings

are

di scussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations

of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no violations or deviations were disclosed.

We

have

examined

actions

you

have

taken with regard

to previously identified

enforcement matters

and unresolved

items.

The status of these

it'ems is discussed

in the enclosed report.

- In accordance

with 10 CFR 2.790(a),

a copy of this letter and the enclosures will

- be placed in the NRC's Public

Document

Room unless

you notify this office,

by

telephone,

within ten

days

of the

date

of this letter

and

submit written

application to withhold information contained therein within thirty days of the

date

of this letter.

Such application

must be consistent with the requirements

of 2.790(b)(l).

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

Enclosures:

(See

Page 2)

Paul J. Kellogg, Chief

Reactor Projects

Branch

2

Division of Resident

and

Reactor Project Inspection

820127041

~()()(>gg()

@<i.a3i

p~~

ADOC

pDR

6

MEz)f s

t

0

l

DEg 511981

Florida Power 5 Light Co.

Enclosures:

Inspection Report Nos. 50-250/81-30

and 50-251/81-30

cc w/encl:

H. E. Yaeger, Site Manager

blind 2 5

bcc w/encl:

Document Management

Branch

State

Commonwealth of Florida

pright

12

/81

R

RII

redrickson:es

12

/81

R~II

CMu phy

12'/ )/81

12+0/81

RII

PKe

og

1

/81