l3PQ 5 i)SB)
IE HQg~PP+
Florida Power and Light Company
ATTN:
Dr.
R.
E. Uhrig, Vice President
Advanced Systems
and Technology
P. 0.
Box 529100
Miami, FL
33152
Gentlemen:
Subject:
Report Nos. 50-250/81-30
nd 50-251/81-30
8
a~~
s
~~PC~)
7!i
~+us
~82~
J-'gg
f4
2
.. j>
Cg
fo
This refers to the routine safety inspection
conducted
by Mr. P.
E. Fredrickson
of this office on December
7-11,
1981, of activities authorized
by
NRC Operating
License
Nos.
and
DPR-41 for the Turkey Point facility and to the discus-
sion of our findings held with Mr. H.
E. Yaeger, Site Manager, at the conclusion
of the inspection.
h
Areas
examined
during
the
inspection
and
our findings
are
di scussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspector.
Within the scope of this inspection,
no violations or deviations were disclosed.
We
have
examined
actions
you
have
taken with regard
to previously identified
enforcement matters
and unresolved
items.
The status of these
it'ems is discussed
in the enclosed report.
- In accordance
with 10 CFR 2.790(a),
a copy of this letter and the enclosures will
- be placed in the NRC's Public
Document
Room unless
you notify this office,
by
telephone,
within ten
days
of the
date
of this letter
and
submit written
application to withhold information contained therein within thirty days of the
date
of this letter.
Such application
must be consistent with the requirements
of 2.790(b)(l).
Should you have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Enclosures:
(See
Page 2)
Paul J. Kellogg, Chief
Reactor Projects
Branch
2
Division of Resident
and
Reactor Project Inspection
820127041
~()()(>gg()
@<i.a3i
p~~
ADOC
pDR
6
MEz)f s
t
0
l
DEg 511981
Florida Power 5 Light Co.
Enclosures:
Inspection Report Nos. 50-250/81-30
and 50-251/81-30
cc w/encl:
H. E. Yaeger, Site Manager
blind 2 5
bcc w/encl:
Document Management
Branch
State
Commonwealth of Florida
pright
12
/81
R
RII
redrickson:es
12
/81
R~II
CMu phy
12'/ )/81
12+0/81
RII
PKe
og
1
/81