ML17341A679

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-250/81-23 & 50-251/81-23 on 811013-16.No Noncompliance Noted
ML17341A679
Person / Time
Site: Turkey Point  
Issue date: 11/03/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17341A680 List:
References
NUDOCS 8112070194
Download: ML17341A679 (4)


See also: IR 05000250/1981023

Text

I

~ v~

P ~

NOV -3 1981

Florida Power and Light Company

ATTN:

Dr.

R. E. Uhrig, Vice President

Advanced Systems

and Technology

P. 0. Box 529100

Miami, FL

33152

>9PI~ co

Gentlemen:

Subject:

Report Nos.

0-250/81-23

a d 50-251/81-23

This refers to the routine sa ety inspection

conducted

by Mr. J. J.

Blake of this

office on October 13-16,

1981, of activities authorized

by

NRC Operating

License

Nos.

DPR-31 and DPR-41 for the Turkey Point facility and to the discussion

of our

findings held with Mr. J.

K. Hays,

Nuclear Plant Manager,

at the conclusion of

the inspection.

Areas

examined

during

the

inspection

and

our findings

are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspector.

Within the scope of this inspection,

no violations or deviations were disclosed.

We

have

examined

actions

you

have

taken

with regard

to previously reported

unresolved

items.

The

status

of these

items is discussed

in the

enclosed

inspection report.

In accordance

with 10 CFR 2.790 of the Commission's

regulations,

a copy of this

letter and the enclosed

report will be placed in the

NRC's Public Document

Room.

If 'the report

contains

any

information that

you believe

to

be

exempt

from

disclosure

under

10 CFR 9.5(a)(4), it is necessary

that you:

(a),notify this

office by telephone

within ten

days

from the

date

of this letter of your

intention to file a request for withholding;

and (b)

submit, within twenty-five

days

from the

date

of this letter

a written application

to this office to

withhold such information. If your receipt of this letter has

been delayed

such

that

less

than

seven

days

are available for your review,

please

notify this

office promptly

so that

a

new due date

may

be established.

Consistent

with

section

2.790(b)( 1),

such

application

must

be

accompanied

by

an affidavit

executed

by the owner of the information which identifies the

document

or part

thereof sought to be withheld,

and

a full statement

of the reasons

on the basis

of which it is claimed that the

information

should

be withheld

from public

disclosure.

This

section

further

requires

the

statement

to

address

with

specificity the considerations

listed in

10 CFR 2 '90(b)(4).

The information

sought to be withheld shall

be incorporated

as far as possible into a separate

8i i2070i94 8iiiOM',

PDR

ADOCK 05000250

I

8

PDR)

Xfo(<(<

~

~

~ e

Florida Power

and Light Company

NOY "3 1SBl

part of the affidavit. If we

do not hear

from you in this regard within the

specified periods

noted

above,

the report will be placed in the Public Document

Room.

Should you have

any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

P~/

Enclosures:

Inspection Report Nos. 50-250/81-23

and 50-251/81-23

cc w/encl:

H. E. Yeager, Site Manager

bcc w/encl:

J. J. Blake

NRC Resident Inspector

Document Management

Branch

State of Florida

Paul J. Kellogg, Chief

Reactor Projects

Branch

2

Division of Resident

and

Reactor Project Inspection

RII~

J

lake:aw

ARHerdt

lfl/P-/81

1tl/~/81

RII~ ~y

RII

'kCEMurphy

>Iy

PJ

1 ogg

I(/%81

~

~