ML17341A605
| ML17341A605 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 09/03/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17341A601 | List: |
| References | |
| NUDOCS 8111130493 | |
| Download: ML17341A605 (4) | |
See also: IR 05000250/1981017
Text
Florida Power and Light Company
ATTN:
Dr.
R.
E. Uhrig, Vice President
Advanced Systems
and Technology
P. 0. Box 529100
Miami, FL
33152
Gentlemen:
Subject:
Report Nos. 50-250/81-17
d 50-251/81-17
This refers to the routine safety inspection
conducted
by Mr. J.
R.
Wray of this
office on August 17-21,
1981, of activities authorized
by
NRC Operating
License
Nos.
and
DPR-41 for the Turkey Point facility.
Our preliminary findings
were discussed
with Mr. H.
E. Yeager,
Site
Manager,
at the conclusion
of the
inspection.
Areas
examined
during
the
inspection
and
our
findings
are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
During the inspection, it was
found that certain activities under your license
appear
to violate
NRC requirements.
This
item
and
references
to pertinent
requirements
are listed in the Notice of Violation enclosed
herewith
as Appen-
dix A.
Elements to be included in your response
are delineated
in Appendix A.
We
have
examined
actions
you
have
taken with regard
to previously identified
enforcement matters.
These are discussed
in the enclosed inspection report.
In accordance
with 10 CFR 2.790 of the Commission's regulations,
a copy of this
letter and the enclosed
report will be placed in the
NRC'
Public Document
Room.
If the
report
contains
any
information that
you believe
to
be
exempt
from
disclosure
under
10 CFR 9.5(a)(4), it is necessary
that you:
(a) notify this
office by telephone
within ten
days
from the
date
of this letter of your
intention to file a request for withholding;
and (b)
submit within twenty-five
days
from the
date
of this letter
a written application
to this office to
withhold such information'f your receipt of this letter has
been
delayed
such
that
less
than
seven
days
are available
for your review,
please
notify this
office promptly
so that
a
new due date
may
be established.
Consistent
with
section
2.790(b)( 1),
such
application
must
be
accompanied
by
an affidavit
executed
by the owner of the information which identifies the
document
or part
thereof sought to be withheld,
and
a full statement
of the reasons
on the basis
of which it is claimed that the
information
should
be withheld
from public
disclosure.
This
section
further
requires
the
statement
to
address
with
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
811<jgpyqg
gag~<>>
AOOCK OSpppiPgp
(
~
~
Florida Power and Light Company
SEP 3,fesf
sought to be withheld shall
be incorporated
as far
as possible
into
a separate
part of the affidavit. If we
do not hear
from you in this regard within the
specified periods
noted above,
the report will be placed in the Public Document
Room.
Should you have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-250/81-17
and 50-251/81-17
cc w/encl:
H. E. Yeager, Site Manager
bcc w/encl:
NRC Resident Inspector
Document Management
Branch
State of Florida
Paul J. Kellogg, Chief
Reactor Projects
Branch 2
Division of Resident
and
Reactor Project Inspection
RII ~
RII
JR ray:aw
y
/g /81
/p/81
RII~t
AFGibson
OP/~/I
RII~@
KDLandis
08/i /81
'll>
RII
PJ
logg
Pl+'81
u
lj