f)llj~( f P,
1 J Concernin the 60 d re uest:
(a)
Items3 concerning a RTgpT,iTimit'iiIILbe delayed until March 1, 1982, because this limit is dependent upon the completion of Westinghouse (hiners Group (WOG) Program and analyses which are due in January 1982.
(b)
You indicated that you have provided a basis for a RTNDT limit in the May 14, 1982 letter; however, you will provide additional information with the RTNDT limit by March 1, 1982.
Concernin the 150 d re uest:
(Q)
Your response will be based on the WOG report which is scheduled for January 1, 1982.
A schedule for information regarding remedied action and any additional analyses will be provided by March 1, 1982.
The safety question related tn pressurized thermal schock is being carefully analyzed by the NRC stafr.
The request is oriented to deveI)ping a resolution of this issue by next suer (1982).
The information which we requested in our August 21, 1981 letter is an important part of the total effort.
We will accept what you can provide as proposed in your letter and acknowledge your committl.nts as identified in (a) Qrtli(b) above.
Ile will continue our program of de'veloping appropriate requirements and note your failure to provide all DISTRIBUTION OCT R3 4981 Docket NRC PDR L PDR TERA NSIC Docket No. 50-251 ORB¹l Rdg DEisenhut OELD Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power and Light Company Post Office Box 529100 Miami, Florida 33152
- ~0 GVissing
Dear Dr. Uhrig:
Gra File We have reviewed your letter regarding Turkey Point P an Unit No. 4 dated September 23, 1981 regarding Pressurized Thermal Shock to Reactor Pressure
- Vessels, Your letter indicated that you will not fully respond to the 60 day and 150 day request of our letter of August 21, 1981.
We have identified the following differences between our request and your intended response.
8iii040604 8ii023 PDR ADOCK 0500025i P
PDR OFFICEI SURNAME$
DATE Is NRC.FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USOPO: 1981~960 jr
'I h
p V
J 4
e<
Dr. Robert E. Uhrig
<<2>>
the requested information may give us less opportunity to avoid the necessity of specifying:consenratisms where more defin'itive and timely informatioq is not available.
Sincerely, cc:
See next page Thomas tl. Novak, Assistant Director for Operating Reactors Division of Licensing It 1
/
OFFICEIR SURNAMEIR DATE It ORBttI4:DL GVissing:ds 10/
/81 1
DL ehi 1
RB t'PL AD/OR:D a
'TN 10~81 1
/81 NRC FORM 318 (10-80) NRCM 0240 OFFICIAL RECORD COPY USGPO: 1991 ~5.960 1
Robert E. Uhrig Florida Power and Light Company cc:
Mr. Robert Lowenstein, Esquire Lowenstein,
- Newman, Reis and Axelrad 1025 Connecticut Avenue, N.W.
Suite 1214 Washington, D. C.
20036 Environmental and Urban Affairs Library Florida International University Miami, Florida 33199 Mr. Norman A. Coll, Esquire
- Steel, Hector and Davis 1400 Southeast First National Bank Building Miami, Florida 33131 Mr. Henry Yaeger, Plant Manager Turkey Point Plant Florida Power and Light Company P. 0.
Box 013100 Miami, Florida 33101 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Resident Inspector Turkey Point Nuclear Generating Station U. S. Nuclear Regulatory Commission Post Office Box 1207 Homestead, Florida 33030
0 W