Docket No. 50-250 Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology EQrida Power and Light Company.
Post Office Box 529100 Miami, Florida 33152
Dear Dr. Uhrig:
DIS UPON,:
ocket
'R L PDR TERA NSIC ORB81 Rdg DEisenhut OELD IE-3 ACRS-1 0 SVarga CParrish HGrotenhuis In accordance
>y$th paragraph 3.E.5 of Facility Operating License No.
DPR-31 for Turkey Point Plant Unit t<o. 3, you conducted an inspection of the steam generator tubes and submitted the results to us for our review and approval prior to restart by letter dated April 2, 1981.
1<et'kind that the inspection results and implemented preventive plugging program provide adequate justification to support six equivalent full power months of operation before the next steam generator inspection will be performed'.
Therefore, approval is hereby granted for resumption of power operation of Turkey Point Ho. 3.
Your request for a liqpnse amendment for the subsequent steam generator inspec-tions':."-w ",d;be.- submitted within the.next two weeks.
cc:
See next page Sincerely, Lggn81 sag>e A V g
Steven A. Varga, Chief Operating Reactors Branch 81 Division of Licensing 8165660 084 OFFICE)
SURNAME)
DATEP
.OB
~
bv o ~ ~ ~ ~
nhuis. S a.: s 81:ds 4
NRC FORM 318 (10/801 N RCM 0240 OFFICIAL RECORD COPY
- USGFOI 198~29 824
I
- I c>;,
+ "c 0<.
II
~4 G
V 4
f, I
~p,g RKCy PO
~y
+~*~+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 April 17, 1981 Docket No. 50-250 Dr. Robert E. Uhrig,Vice President Advanced Systems and Technology Florida Power and'Light Company Post Office Box 529100 Miami, Florida 33152
Dear Dr. Uhrig:
In accordance with paragraph 3.E.5 of Facility Cperating License No.
DPR-31 for Turkey Point Plant Unit No. 3, you conducted an inspection of the steam generator tubes and submitted the results to us for our review and approval prior to restart by letter dated April 2, 1981.
I
',!e find that the inspection results and impleIIIented preventive plugging program provide adequate justification to support six equivalent full power months of operation before the next steam generator inspection will be performed:
Therefore, approval is hereby.granted for resumption of power operation of Turkey Point No." 3.
Your request for a 1'icense amendment for the subsequent steam generator inspec-tions: should'e subhitted within the next two weeks.
- cerely, even A. Var
'perating Reactors ranch 81 Division of Licensing cc:
See next page
~I
Robert E
Uhrig Florida-Power and Light Company cc:
Mr-Robert Lowenstein, Esquire L'owenstein,
- Newman, Reis and Axelrad 1025. Connecticut, Avenue, N.W-Suite 1214 Mashington, D. C.
20036 Environmental and Urban Affairs Library Flor ida International University Miami, Florida 33199 Mr. Norman A. Coll, Esquire
- Steel, Hector and Davi.s 1400 Southeast First National Bank Building
'iami, Florida 33131 Mr. Henry Yaeger, Plant Manager Turkey Point 'Plant Florida Power and Light Company P
0.
Box 013100 Miami, Florida 33101 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee,,
Florida 32301 Resident Inspector Turkey Point Nuclear Generating Station U. S'. Nuclear Regulatory Commissior Post Office Box 1207 Homestead, Florida 33030