L-81-140, Forwards Nonradiological Environ Monitoring Rept,1980. Groundwater Monitoring Summary Rept for Jul 1980-June 1981 to Be Submitted by 810830
| ML17340A920 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/31/1981 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML17340A921 | List: |
| References | |
| L-81-140, NUDOCS 8104030481 | |
| Download: ML17340A920 (4) | |
Text
REGULATORY I LIMATION DISTRIBUTION SYST (RIDS)
ACCESSIONt NBR 81 0$ 030481'OC
~ DATE'i 81/03'/31 NOTARIZED!" NO
~jl FACIL:50250 T0t;key Point Pl anti Unf t 3P Flor ida Power and Ligh't CC 0002 50 251 TUr key Point" PlantP, Unit 0~ Flor fde Power and Light C'5000EI 1
AUTH',NAME" AU/HOR AFFILIATION UHRIGr R ~ E;'lorfdas Power L Light Co ~
RECIP ~ NAMEl REC'IPIENT AFFILIATION O'REILLYrJ P, Region 2'P Atlanta, Office'of,the Dfr ector SUBJECTII Forwards>> "Nonradfologfcal Ehviran Monf tor fng RePtr1980
~ "",
Gr oundwater mon f-torfng, summary r ept' or I Jul 1980 June'981 to be submitted by 810830
'rd'bS
~80 DISTRISUTION CODE:,'OOTS COPXES'ECEIYED:I,TR
+ENCL< 7'IZES: '$P~~.
TITLE'eriodic Envfr onmental Monf tor f ng Rpts (Annual r'Semf Annual PEf fluent)
NOTES!"
RECIPIENT~
ID'ODE/NAME)
ACTION::
VARGArS ~
'0'NTERNAL':
EFF TRTI BR IEE~
06>>
OMPA HARTFIELD RADI ASSESS BR10.
COPIES'TTR ENCL~
7 7
1 2
2 1
1 1 ~
1 RECIPIENT'D'ODE'/NAME<
ENV ENG. BR 08 NRC~
PDR'2'R ESS'R 09 01 COPIES'TTRl ENCL' 1
1 1
1-1 1
1 1.
1 LPDR 03 1
1 s
APR 6 'i981 TOTAL NUMBER>> OF COPIES'EQUIREDRC LTTR>>
19 ENCL<
.19.
V
~
I
~4 U
IVI)(
l W I N
P.O. BOX 629100 MIAMI,F L 33152 L>
FLORIDA POygER
,PV 5 LIGHTCOMPANY triarch 31, 1981 L-81-140 Mr. J.
P. O'Reilly, Director, Region XX Office of Xnspection 6 Enforcement U.
S. Nuclear Regulatory Commission 101 Marietta'treet, Suite 3100 Atlanta, Georgia 30303
Dear Mv. O'Reilly:
Be:
Turkey Point Units 3
6 4
Docket Nos.
50-250 6 50-251 Non-Radiological Environmental Monitoring Re ort 1980 Xn accordance with'Appendix 8, Section 5.4.1 of the Turkey Point Environmental Technical Specifications and Regula-tory Guide 10.1, Florida Power 6 Light Company submits herewith two (2) copies of the annual Non-Radiological Environmental Monitoring Report for the period from January 1,
1980 through December 31, 1980.
The Ground-water Monitoring Summary Report for the period July 1, 1980 through June 30, 1981 will be submitted by August 30, 1981.
Very truly yours,
/ u W-W~m~
Robe t E. Uhrig Vice President Advanced.Systems 6 Technology REU/BAK/ku, Enclosures cc:
Director, Office of Xnspection 6 Enforcement (1) director, Office of Nuclear Reactor Regulation (17)
Robert Lowenstein, Esquire (w/o encl.)
81 040S 0%I 'FOPLE...SERVING PEOPLE