ML17340A855

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-250/80-36 & 50-251/80-34 on 801101-30 & Notice of Violation
ML17340A855
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/30/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17340A853 List:
References
NUDOCS 8103190300
Download: ML17340A855 (4)


See also: IR 05000250/1980036

Text

UNITEDSTATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

, I'y

0O

I

R

Vl

r

O

+~

~O

+>>*++

Florida Power and Light Company

J4 M $

, 0 )qg)

ATTN:

R. E. Uhrig, Vice President

P.

O. Box 529100

Miami, FL

33152

Gentlemen:

Subject:

Report Nos. 50-250/80-36

and 50-251/80-34

This refers

to the routine safety inspection

conducted

by A. J. Ignatonis

and

W.

C. Marsh of this office on November 1-30,

1980, of activities authorized

by

NRC Operating License Nos.

DPR-31 and DPR-41 for the Turkey Point facility.

Our

preliminary findings were discussed

with H. E. Yaeger at the conclusion of the

inspection.

Areas

examined

during

the inspection

and

our findings are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records, 'interviews with

personnel,

and observations

by the inspectors.

During the inspection, it was

found that certain activities under your license

appear

to violate

NRC requirements.

This item

and

references

to pertinent

requirements

are listed in the Notice of Violation enclosed herewith as Appendix A.

Elements to be included. in. your response

are delineated in Appendix A.

One

new unresolved

item is identified in the enclosed

inspection report. This

item willbe examined during subsequent

inspections.

In accordance

with Section 2.790 of the

NRC "Rules of Practice," Part 2, Title

10, Code of Federal Regulations,

a copy of this letter and the enclosed inspection

report will be placed in the

NRC Public Document

Room. If this report contains

any information that you believe to be proprietary, it is necessary

that you

make a written application within 20 days to this office to withhold such informa-

tion, from public disclosure.

Any such application must include the basis for

claiming that

the information is proprietary

and the proprietary information

should be contained in a separate

part of the document. If we do not hear from

you in this regard within the specified period,

the report will be placed in the

Public Document Room.

Should you have any questions

concerning this letter,

we will be glad to discuss

them with'.you.

Sincerely,

Zc.

R.

C.

ewis, Chief

Reactor Operations

and Nuclear

Support Branch

Enclosures:

(See Page 2)

1j

Florida Power and Light Company

Enclosures:

1.

Appendix, Notice of Violation

2.

Inspection Report Nos.

50-250/80-36

and 50-251/80-34

cc w/encl:

H. E. Yaeger, Plant Manager

P. 0.

Box 013100

Miami, Florida.

33101