ML17340A804
| ML17340A804 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 02/27/1981 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-2.D.1, TASK-2.K.3.02, TASK-TM L-81-84, NUDOCS 8103100334 | |
| Download: ML17340A804 (4) | |
Text
REGULATORY
'ORMATION DISTRIBUTION SY 9'RIDS)
PS ACCESSION'BR 81'031'00334 DOC ~ DATE'1/02/27NOTARIZED NO DOCKElT" 0 FACIL'.50-250 Tur key Point PlantE Unit 3< Flor ida Power and Light C
50 251 Turkey Point Planti Unit 4P Florida Power and Light C
5000251 AUTH' NAME AUTHOR'FFILIATION UHRIG~R.E.
Flor.i.da Power L Light Co, REC IP ~ NAME'ECIPIENT AFF IL'IAT'ION EISENHUTPD ~ G ~
Division of Licensing
SUBJECT:
~ Submits= safety 8
power~ operated relief valve actuations for 800401"1231 per NUREG 0737 L
NRC 800507 ltr" re five addi TMI-2 related requirements to operating reactors, DISTRIBUTION CODE:
A0060 COPIES RECEIVED:LTR Q'NCL 0 SIZE:
TITLEl: Response to NUREG "0737/NUREG 0'660 TMI Action Plan Rgmts (OL's)
NOTES:
REC IP IENT, ID CODE/NAME ACTION:
VARGA P S ~
05 INTERNAL: A/D CEC SYS 27 A/D FOR TECH 32.
A/D LICENS ie A/D OP REACT 15 A/D RAD PROT 26 DEP DIRz DHFS 29 DIRECTORS'E 21=
DIRECTOR ~DL 14 DIRECTORS'ST 30 OELD PDR COPIES LTTR ENCL 1
1 1
11' 1
1 1
1 RECIPIENT ID CODE/NAME'/D C8S ENG 22 A/D'EN PROJ 31 A/D M8,Q ENG 23 A/D PLANT'YS25 A/D SAFETY AS17 D IR E EM PREP 33 DIRECTORS'HFS28 DIRECTOR P DS I 24 ISE 12'R A
ESS BR 18 F
01 COPIES LTTR ENCL 1
1 1
1 1
1 1
1
?
1 EXTERNALS ACRS NSIC 34 04 16 1
1 LPDR 03 f(MR 12 1981 TOtTAL NUMBER OF COPIES REQUIRED LiTTR 50 ENCL'
kk k
kkk tk, ~,
kkk f kt tk
'k
FLORIDA POWER II LIGHTCOMPANY February 27, 1981 L-81-84 Director.- of Nuclear. Reactor Regulation Attention:
Mr. Darrel G. Eisenhut Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr.,
Eisenhut:
~
i"~!(p D:
8 ]98) 12 R
~/gg~M1Qgy
(
Re:
Turkey Point Units 3
& 4 Docket No. 50-250
& 50-251 Safet and Relief Valve Challen es The following are the safety valve and power operated relief valve actuations for Turkey Point Units 3
& 4 from April 1, 1980 to December 31, 1980 as required by NUREG-0737 and the NRC letter of May 7, 1980, Five Additional TMI-2 Related Requirements to Operating Reactors:
Unit 3 Per procedure 0205.2, Hot to Cold Shutdown,
'PORV valves 455C and 456 were tested for operability on October 6, 1980 and November 27, 1980.
Both valves tested satisfactorily on each occasion.
No other PORV or pressurizer code relief valve actuation occurred for the reporting period.
Unit 4 Per procedure 0205.2, Hot to Cold Shutdown, PORV 455C was tested for operability on November 9, 1980.
The test was satisfactory.
PORV 456 was out of service on that date and was not tested for operability.
No other PORV. or pressurizer code relief valve actuations occurred for the reporting period.
Very truly yours, Robert E. Uhrig Vice President Advanced Systems
& Technology REU/JEM/mbd Attachments 81031003 3<
cc:
Mr. James P. O'Reilly, Region II Harold F. Reis, Esquire PEOPLE... SERVING PEOPLE
~i I1
~
~