Forwards IE Insp Repts 50-250/80-33 & 50-251/80-32 on 801001-31.No Noncompliance Noted
ML17340A774
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/12/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17340A775 List:
References
NUDOCS 8103030293
Download: ML17340A774 (4)


See also: IR 05000250/1980033

Text

'

1P,fl AEOO

~4

~o

Cy

oo

++**+

In Reply Refer To:

RII:

-250/80-33

50-251/80-3

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTAST., N.W., SUITE 3100

ATLANTA,GEORGIA 30303

JAN 10 t98t

Florida Power and Light Company

ATTN:

R. E. Uhrig, Vice President

P. 0. Box 529100

Hiami, FL

33152

6

~

8g~ /kg

3

4'o~< g

4fgW~

tog~

Gentlemen:

This refers

to the

inspection

conducted

by A. Ignatonis

of this office on

October 1"31,

1980,

of activities

authorized

by

NRC Operating

I,icense

Nos.

DPR-31

and

DPR-41 for the Turkey Point facility, and to the discussion of our

findings held with J.

K. Hays at the conclusion of the inspection.

Areas

examined

during the inspection

and

our findings are

discussed

in the

enclosed

inspection

report.

Within these

areas,

the inspection

consisted

of

selective

examinations of procedures

and representative

records,

interviews with

personnel,

and observations

by the inspectors.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

We have

examined

actions

you have

taken with regard to previously identified

enforcement matters.

These are discussed in the enclosed inspection report.

Two new unresolved

items resulted

from this inspection

and are discussed

in the

enclosed report.

These items willbe examined during subsequent

inspections.

In accordance

with Section 2.790 of the

NRC's

"Rules of Practice",

Part 2,

Title 10,

Code of Federal

Regulations,

a

copy of this letter and the enclosed

inspection report will be placed in the

NRC's Public Document

Room. If this

report

contains

any information that you (or your contractor)

believe to be

proprietary, it is necessary

that you make

a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include

a full statement of the reasons

on the basis of which

it is claimed that the information is proprietary,

and should

be prepared

so

that proprietary information identified in the application is contained in a

separate

part of the document.

If we do not hear from you in this regard within

the specified period, the report willbe placed in the Public Document Room.

0

I

r

i

l

~r

1

P'J

W

Florida Power and Light Company

JAN i2 $81

0

Should you have any questions

concerning this letter,

we will be glad to discuss

them with you.

Sincerely,

E'c.

R.. C.

ewe.s, Acting Chief

Reactor Operations

and Nuclear

Support Branch

Enclosure:

Inspection Report Nos.

50-250/80-33

and 50-251/80-32

cc w/encl:

H. E. Yaeger, Plant Manager