ML17340A774
| ML17340A774 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 01/12/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17340A775 | List: |
| References | |
| NUDOCS 8103030293 | |
| Download: ML17340A774 (4) | |
See also: IR 05000250/1980033
Text
'
1P,fl AEOO
~4
~o
Cy
oo
++**+
In Reply Refer To:
RII:
-250/80-33
50-251/80-3
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
JAN 10 t98t
Florida Power and Light Company
ATTN:
R. E. Uhrig, Vice President
P. 0. Box 529100
Hiami, FL
33152
6
~
8g~ /kg
3
4'o~< g
4fgW~
tog~
Gentlemen:
This refers
to the
inspection
conducted
by A. Ignatonis
of this office on
October 1"31,
1980,
of activities
authorized
by
NRC Operating
I,icense
Nos.
and
DPR-41 for the Turkey Point facility, and to the discussion of our
findings held with J.
K. Hays at the conclusion of the inspection.
Areas
examined
during the inspection
and
our findings are
discussed
in the
enclosed
inspection
report.
Within these
areas,
the inspection
consisted
of
selective
examinations of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
Within the scope of this inspection,
no items of noncompliance
were disclosed.
We have
examined
actions
you have
taken with regard to previously identified
enforcement matters.
These are discussed in the enclosed inspection report.
Two new unresolved
items resulted
from this inspection
and are discussed
in the
enclosed report.
These items willbe examined during subsequent
inspections.
In accordance
with Section 2.790 of the
NRC's
"Rules of Practice",
Part 2,
Title 10,
Code of Federal
Regulations,
a
copy of this letter and the enclosed
inspection report will be placed in the
NRC's Public Document
Room. If this
report
contains
any information that you (or your contractor)
believe to be
proprietary, it is necessary
that you make
a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include
a full statement of the reasons
on the basis of which
it is claimed that the information is proprietary,
and should
be prepared
so
that proprietary information identified in the application is contained in a
separate
part of the document.
If we do not hear from you in this regard within
the specified period, the report willbe placed in the Public Document Room.
0
I
r
i
l
~r
1
- P'J
W
Florida Power and Light Company
JAN i2 $81
0
Should you have any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
E'c.
R.. C.
ewe.s, Acting Chief
Reactor Operations
and Nuclear
Support Branch
Enclosure:
Inspection Report Nos.
50-250/80-33
and 50-251/80-32
cc w/encl:
H. E. Yaeger, Plant Manager