Forwards Request for Addl Info for Draft EIS & Safety Evaluation Re Util Proposed Steam Generator Repair Rept. Dimensions for Calculating Vol of Steam Generator Assembly Should Be Provided
ML17340A700
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/29/1981
From: Varga S
Office of Nuclear Reactor Regulation
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
References
NUDOCS 8102170462
Download: ML17340A700 (8)


Text

DIS 8lJ t File 50-250/25 JHel temes OELD I8Ig (3)

SVarga MGrotenhuis ~

CParrish Gray FIle ACRS (16)

Docket Nos. 50-250 and 50-251 Sincerely, g 8M118 Steven A. Vhrga, Chief Operating Reactors Branch 01 Division of I.icensing

Enclosure:

Request for Additional Information Dr. Robert E. Uhrig, Vice President,

Advanced Systems and Technology Florida Power and Light Company ORB81 Rdg Post Officd Box 529100 DEisenhut Miami, Florida 33152 RPurple TNovak

Dear Dr. Uhrig:

RTedesco GLaimas In reviewing your proposed ~am generator repair report for the preparation of the Draft Environmental Statement and Safety Evaluation Report we have found several areas in"whi'Hi the report needs updating or clarification.

These areas are l."elineated in the enclosure to this letter.

Please clarify these areas at the same time, or prior to, your comments on the Draft Environmental Statement.

CC:

See next page IXO 8 j.y0 gg~

OFFICE)

SURNAME/

DATEP ORB81:

MGrotenhuiq, I/g.f/81 ORB

.. KV a.......

1

}

~

~ ~ ~ ~ ~

~ ~

NRC FORM 318110/801NRCM 0240 OFFICIAL RECORD COPY 0 USGPO; 1980-8294124

4i i

~ I I

11 W

'I

~

'(

'I Q I" 1

gA~ RECy "o

Ao

~r~

~O

+p*~4 Docket, Nos.

50-250 and 50-251 i

UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 January 29, 1981 Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power and Light Company Post Office Box 529100 Miami, Flor ida 33152

Dear Dr. Uhrig:

In reviewing your proposed steam generator repair report for the preparation of the Draft Environmental Statement and Safety Evaluation Report. we have found several areas in which the report needs updating or clarification.

These ~areas are delineated in the enclosure to this letter.

Please clarify these areas at the same time, or prior to, your comments on the Draft Environmental Statement, ncerely

'even

arga, ief Operating Reacto Branch

¹1 Division of L'icensing

Enclosure:

Request for Additional Information CC:

See next page

4i Sr c

Robert E. Uhri g Florida Power and Light Company CC:

Mr. Robert Lowenstein, Esquire Lowens te in, Newma n, Re is and Axelrad 1025 Connecticut

Avenue, N.W.

Suite 1214 Washington, D. C.

20036 Environmental and Urban Affairs Library Florida International University Miami, Florida 33199 Mr. Norman A. Coll, Esquire

Steel, Hector and Davis 1400 Southeast First National Bank Building

'iami, Florida 33131 Mr. Henry Yaeger, Plant Manager Turkey Point Plant Florida Power and Light Company P. 0. Box 013100 Miami, Florida 33101 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Admi nistrator Department of Environmental Regulation Power Plant Siting Section State of Fl ori da 2600 Blair Stone Road Tallahassee,.

Florida 32301 Resident Inspector Turkey Point Nuclear Generating Station U. S. Nuclear Regulatory Comission Post Office Box.971277 guail Heights Station Miami, Florida 33197 e

Mr. Mark P.

Oncavage 12200 S.

W. 110th Avenue

Miami, F 1 ori da 33176 Neil Chonin, Esquire 1400 Ameri-First Building One Southeast Third Avenue Miami, 'Flori da 33131 Henry H. Harnage, Esquire Peninsula Federal Building, 10th Floor 200 S.

',E. First Street

~

M.iami, Fl onda

'33131 Ms. Cheryl A. Flaxman 1023 Polk Street Hollywood, Florida 33019 Burt Saunders, Asst.

County Attorney Courthouse, 16th Floor Miami, Florida 331.31 c p

4>

'J

RE VEST FOR ADDITIONAL INFORMATION (1).

The drawing of the steam generator assembly SGRR figure 3.3-7 does not have dimensions of the steam generator assembly.

Provide the dimensions necessary to calculate the volume of the assembly.

(2).

The number of workers given in the SGRR on p.

6-1 is 300. If that is not the total work force on the repair

program, provide the total number of workers, i.e.,

anyone that is >issued a film badge and'ocimeter.

(3).', The analysis of the drop of the steam generator indicated the maximum drop.is 12 feet.

However, according to D-1=1 of the.SGRR the assemblies will be lowered into the storage facility which apparently has 22 foot high walls.

Clarify the apparent discrepancy.

Contention 6e refers to condenser retubing cost.

Page A-19-1 of the SGRR indicates that the main condensers have already been retubed with Titanium tubes.

When was this done?

What was the cost?

Is there another retubing of the condenser imminent?

.4~

~ lP ~

~P IEB 0.5 1981 I'