ML17340A202
| ML17340A202 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 09/12/1980 |
| From: | Varga S Office of Nuclear Reactor Regulation |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8009260015 | |
| Download: ML17340A202 (9) | |
Text
y <E~lA)MFltgt;;;() g+p(
CfPTEMRfp 't 2 1980 DISTR IB UTION E-0-251 NRC PDRs
(
Local PDR Docket Nos. 50-250 TERA and 50-251 NSIC NRR Reading ORBl Reading Dr. Robert E. Uhrfg, Yfce President D. Efsenhut Advanced Systems and Technology S.
VArga Florida Power and Light Company Post Office Box 529100 fHamf, Florida 33152 OELD J.
Roe
Dear Dr. Uhrfg:
J. Helhemes This wfll confirm the arrangements made with your staff for two site visits.related to the steam generator repair program for the Turkey Point Plant Unit Nos.
3 and 4.
On September 17, 1980 we will visit the Turkey Point site in the morning to famklfarfze ourselves with the Health Physics facilities, the model and the steam generator storage
- area, In the afternoon, t>e will meet with your staff to discuss matters related to the radiological review and the accident evaluation of the steam generator repair program.
Me expect that as a result: of these dfscussfons, questions will arise to which a formal response will be required.
This meeting will be at the Homestead City Hall, 790 Homestead 81vd., Homestead, Florida (see enclosed meeting notice).
On September 30, 1980 we will visit the plant as a part of our environmental review.to familiarize ourselves with the discharge area, the canal area and some shore areas along Bfscayne Bay (see enclosed meetfng notice).
Sincerely,
,Original signe6 b+8 S. A. Var@a l
Steven A. Yarga, Chief Operatfng Reactors Brancbhtl Division of Licensing
Enclosures:
1.
September 17 Meeting Notice 2.
September 30 t<eetfng Notice cc:
w/enclosures See next page OFFICE/
$90 SURNAME DATE$
,. DL:ORBl
..Ht'rotaehufs 08/
/80, DL:ORBl
. MVarga:jb.
09/
/80 NRC FORM 318 (9 76) NRCM 0240 4 U.S. GOVERNMENT PRINTING OFFICE: 1979'289 369
I I ~
I I OLL~F I<<IFI A
ILL<<L~
L ~ F I'te I l<<I g L
~
F'-
L )(i
~ ~
I I* <<L L
l.
s I
Itl Q
t'I <<4
~ I I" L I>> 0 ll LL I',,
I C
ILI I
4 "44
~ 1
~
~ I f
<< lt
~ LL F
tl L rtfy "<<<
"I II Ill 'I
'E I
I f
'I lit'
~
't I
/
'I'\\/
~
I
~
L
<<) O'>>>>y', I It 8 /
I 1
~
OW I
t r
~
='
I>>
l'll I I, t
a FL -n F
I" II I
i << <<L:~ <<
L 4
II
<<1<<
IF 3
~
I I
I IF MFQ I
~
I I <<I
\\ ~
ig
~g AtOIr (a
~o ce o
o-"
<<>>*<<+
t UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, O. C. 20555 September 12, 1980 Docket Nos. 50-250 and 50-251 Dr. Robert E. Uhrig, Vice President Advanced Systems and Technology Florida Power and Light Company Post Office Box 529100 Miami, Florida 33152
Dear Dr. Uhrig:
This will confirm the arrangements made with your staff for two site visits related to the steam generator repair program for the Turkey Point Plant Unit Nos.
3 and 4.
On September 17, 1980 we will visit the Turkey Point site in the morning to familiarize ourselves with the Health Physics facilities, the model and the steam generator storage area.
In the afternoon, we will meet with your staff to discuss matters related to the radiological review and the accident evaluation of the steam generator repair program.
Me expect that as a result of these discussions, questions will arise to which a formal response will be required This meeting will be at the Homestead City Hall, 790 Homestead Blvd., Homestead, Florida (see enclosed meeting notice).
On September 30, 1980 we will visit the plant as a part of our environmental review.to familiarize ourselves with the discharge
- area, the canal area and some shore areas along Biscayne Bay (see enclosed meeting notice).
Sincerely, Cu, ~
even A. Var a
Cb f I t g
Operating Reactors nch.
-".;1 Division of Licensing Encl osures:
1.
September 17 Meeting Notice 2.
September 30 Meeting Notice cc:
w/enclosures See next page
Robert E. Uhrig Florida Power and Light Company 2
September 12, 1980 CC:
Mr. Robert Lowenstein, Esquire Lowenstein,
- Newman, Reis and Axelrad 1025 Connecticut
- Avenue, N.W.
v Suite 1214 Washington, D.
C.
20036 j /
II
'g
, irk Library Environmental and Urban Florida International Un Miami, Florida 33199 s3ty
/
v Mr. Norman A. Coll, Esq i,e
- Steel, Hector and Davis
'400 Southeast First Natio Bank Building
-'j Miami, Florida 33131 al
~
i
~
t Mr. Henry Yaeger, Plant Manager Turkey Point Plant Florida Power and Light Company P. 0.
Box 013100 Miami, Florida 33101 Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Fl ori da 32304 Admi ni strator Department of Environmental Regulation Power Plant Siting Section State of Florida
\\
2600 Blair Stone Road Tallahassee, Florida 32301 Resident Inspector Turkey Point Nuclear Generating Station; U. S. Nuclear Regulatory Coranission Post Office Box 971277 guail Heights Station Miami, Florida 33197 Henry H. Harnage, Esquire Peninsula Federal Building, 10th Floor 200 S. E. First Street Miami, Florida 33131 Dr. Oscar H. Paris Atomic Safety and Licensing Board Panel U. S. Nuclear Regulatory Comnission Washington, D.
C.
20555 Elizabeth S.
- Bowers, Esquire, Chairman Atomic Safety and Licensing Board Panel U. S. Nuclear Regulatory Commission Washington, D.
C.
20555 Dr.
Emmeth A. Luebke Atomic Safety and Licensing Board P anel U. S. Nuclear Regulatory Commission Washington, D.
C.
20555 Mr. Mark P.
Oncavage 12200 S.
W. 110th Avenue Miami, Florida 33176 Neil Chonin, Esquire New World Tower Building, 30th Floor 100 N. Biscayne Boulevard Miami, Florida 33132
(Ql
~q~
"o 0
Yr Qi
~O
~>>*<<+
UNITED STATES t
NUCLEAR REGULATORY CO SlON WASH)NGTON, D. C. 20555 September 8, 1980 Docket Hos.
50-250 and 50-251 MEMORAHDUM FOR:
Steven A. Varga, Chief Operating Reactors Branch
- 1, DL FROM
SUB JECT
- Date, Time and Location:
Purpose:
Participants:
Wednesday, September 17, 1980 9:00 am - 12:00 noon Turkey Point Site Wednesday, September 17, 1980 1:30 pm - 4:30 om
.Homestead City Hall To discuss'he Steam Generator Repair Program FRL R. Kaminski L. Rodriguez HRC M. Grotenhuis J.
Minns J. Mitchel D. Col'1ins Marshall Grotenhui s, Project Manager Operating Reactors Bra'nch rl, DL FORTHCOMING MEETIHG WITH FLORIDA POWER AHD LIGHT COMPLY (TURKEY POIHT Ut'IT HOS.
3 AHD 4)
A tact JIIent Aoenda Marshall Grotenhuss, Project Manao r Operating Reactors Branch
=."1 Division of Licensing cc:
w/attachment See next page
Attachment Site Visit A enda 9:00 am - 12:00 noon Site Visit to Turkey Point health physics facilities, and steam generator storage location.
1:30 pm - 4:30 m
Neeting and discussion of health physics procedures and potential accident conditions.
(Open to the public)
gy,R IIKC(
~4 0
UNITED STATES NUCLEAR REGULATORY COMl%BSION WASHINGTON, D. C. 20555 SEPTEyaEff 1 1 1980 Docket Nos.
50-250 and 50-251 MEMORANDUM FOR:
FROM:
SUB JECT:
Date and Time:
Location:
Purpose:
Steven A, Varga, Chief Operating Reactors Branch
.:1, DL Marshall Grotenhuis, Project Manager Operating Reactors Branch
.'.1, DL FORTHCOMIING SITE VISIT WITH FLORIDA POWER 'AND LIGHT COMPANY {TURYEY POINT UNIT NOS.
3 AND 4)
- Tuesday, September 30, 1980 9:00 am - 5:00 pm Turkey Point Site Environmental Site Visit: Visit plant outfall, canal system and associated areas around tne Turkey Point Plan~.
pa} tlc1pants:
FPL P,.
Kaminski L. Rodriguez f,'RC f'.. Grotenhuis
/ ((pz+i-'gD-c Marshall Grotenhuis, Project Manaaer Operating Reactors Branch
- -"1 Division c f'L',censing cc:
See next paae