ML17339B149
| ML17339B149 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 05/30/1980 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-79-25, NUDOCS 8006260129 | |
| Download: ML17339B149 (2) | |
Text
1,i Jgt) 6 AIO: 0~
I P.O. BOX 529100, MIAMI,FL 33152 FLORIDA POWER 4 LIGHTCOMPANY May 30, 1980 Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatorv Commission 101 Marietta Street, Suite 3100 Atlanta,'Georgia 30303
Dear Mr. O'Reilly:
Re:
RII:
JPO 50-250,50-251 IE Bulletin 79-25 The following information supplements our response of December 20, 1979 (1-79-356) to Item 3 of the subject bulletin.
3.
The relays are tested monthly by licensed operations personnel as re-quired by Technical Specification Table 4.1-1, Item 24.
(Reference FSAR Section 8.5.)
The orocedures which implement the testing are OP 1004.2, Reactor Protection System - Periodic Test, and OP 4004.2, Safeguard, Relay Train A, B, and Emergency Load Sequencer Time-Periodic Test.
Additionaly, OP 4104.2 Engineered Safeguards and Emergency Power Systems
- Integrated Test, is performed following each refueling shutdown to verify automatic operation of the system pursuant to the requirements of Technical Soecifications Table 4.1-1 Item 8, Table 4.2-1 Item 8, and 4.8.l.b.
Relay failures, maintenance",
and testing are documented.
These reports are maintained in our General Equipment Modification Svstem (GEMS) data base.
Please call if you have further questions on this subject.
Very tr
- yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/MAS/pa Attachment 8006860189
=l oI'~~opj:
PEOPLE... SERVING PEOPLE
n