Monthly Operating Repts for May 1979
ML17339A912
Person / Time
Site: Saint Lucie, Turkey Point  
Issue date: 06/09/1979
From: Chilson V
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17208A477 List:
References
NUDOCS 8004230332
Download: ML17339A912 (13)


Text

, AVERAGE DAILY,UNITPOWER LEVEL DOCKET NO. 50 250 DATE June COMPLETED IIY V. T. Chilson TELEPHONE 824 MONTH DAY AVERAGE DAILYPOWER'LEVEL (MWe-Net)

I 664 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 661 17

.7 10 12 13 14 15 16 INSTRUCTIONS 667 665 66 667 666 664 661 658 658 18 19 20 21 22 23 24 25 26 27 28 29 30 31 NOTE 664 664 660 Average daily power level greater than 666MWe due to cooler condenser cooling water.

On this format. list the average daily onit power level in M~Ue Net for each day in the reporting month. Compote lo the nearest whole megawatt.

(')(77)

- ~

OPERATING DATAREPORT V

8>

~

\\

OPERATING STATUS 693 I. Unit Name:

Turke Point Unit No.

3

2. Reporting Period:
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):

'. Maximum Dependable Capacity,(Net MWe):

DOCKET NO.

DATE QIIne 2 1979 COMPLETED BY U. T. Chilson TELEPHONE ~~-3824 Notes-Unit No.

3 operated at approximately 100% R.P. unti Unit was removed froin ser-vice to perform integrated safeguards, surveillance test excep t for outage of May 4, 19 79.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted, IfAny (Net MWe):

IO. Reasons For Restrictions, IfAny:

NONE

11. Hours In'Reporting Period
12. Number Of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) l 7. Gross Electrical Energy-Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, This Month.

744. 0 Yr.-to-Date 3 623.0 598.1 943.2 595.6 831.7 80.1 23.0 23.0 80.1 79.1 21.3 76.1 20.5 0.6

12. 5 Date, and Duration of Each):

1 299 648 1 750 006 412 265 554 600 392 189 514 830 Cumulative 56 864.6 43 515.6 194. 6 42 009;0 97.3 83 516 954 26 589 030 25 162 007 73.,9 74.0 67.0 63.9 2.8

25. IfShut Down At End Of Report Period, Estimated Date of Startup:

26, Units In Test Status (Prior to Commercial Operation):

June 1

1979 Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION

('>/77 )

UNlTSHUTDOWNS AND POWER REDUC110NS DOCKET NO.

DATE June 9

1979 it No.3 REPORT MONTH No.

Date Wg A 'J

~ CC

~ V)

Liccnsec Event Report >

C plyCl Q

2 ~

p3 Cause &Corrective Action to Prevent Recurrence 79-05-04 3.6 N/A HH Unit was tripped by steam generator No.

3B level protection system.

Corrective actions included replacing failed gasket in condensate recircu-lation line.

(Non-nuclear system) 79-05-25 144. 8 N/A zz zzzzzz Unit was removed from service to perform inte'grated safeguards sur-veillance test.

(Nuclear system)

F: Forced S: Scheduled

(')177)

Reason:

A-Equiprncnt Failure (Explain) 8-Maintenance or Test C-Refueling D.Regulatory Restriction E-Operator Training & Ucensc Examination F-Administrative G.Operational Error (Explain) ll.Other (Explairr) 3 Method:

1 Manual 2.Manual Scram.

3-Automatic Scram.

4.Other (Explain) 4 Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-OI 6l )

5 Exhibit I - Sam<<Source

AVERAGE DAILYUNITPOWER I.EVEL DATE June 9,

1979 COMPLETED BY TELEPHONE on 2-824 MONTH lvU>>.Y, 19 79 DAY AVERAGE DAILYPOWER LEVEL (hiWe-Net) 9 10 12 13 14 IS 16 DAY AVERAGE,DAILYPOWER LEVEL (MWe-Net )

17 IS 19 20 21 22 23 24 25 26 27 28 29 30 31 INSTRUCTIONS On this format, list the average daily onit p<>wer level in,MWe-Net for each day in the reporting m>>nth. C>>n>pote to the nearest whole megawatt.

('>/771

OPERATING DATAREPORT DOCKET NO.

DATE June '~79 COMPLETED BY ~~hilson TELEPHONE ~9 '~-3824 OPERATING STATUS I. UnitName'urke Point Unit No.

4

2. Reporting Period:

Ma 19 79

3. Licensed Thermal Power (MWt):

2200

4. Nameplate Rating (Gross MWe):

76

5. Design Electrical Rating (Net MWe):

Notes Unit No.

4 scheduled refueling, maintenance, in-sphctions, and tests'ontin-ued during the month.

p p

y(

)

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. IfAny (Net hIWe):
10. Reasons For Restrictions, IfAny:

NONE This Month Yr:to.Date Cumulative 3, 623.0 2 188. 3 2 182.0 4'77 101 1 267'00 1 191 500 60.2 60.2 49.4 47.5 1.4

11. Hours In Reporting Period 744. 0
12. Number Of Hours Reactor Was Critical 13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Ge'nerated (MWH) 17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (hIWH)
19. Unit Service Factor 20. Unit AvailabilityFactor 21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):

50'592.0 36 535.9 138.8 35 001.0 72 216 968 2

25 21 876 205 69.2 69.2 65.3

'2.4 2.7

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation):

June 17 197 Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (u/771

UNITSIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.

REPORT MONTH No.

Date J

~

C/7 Liccnscc Event Rcport-CP l9 vj cn Cr Cl~

oQ U Q

Cause A. Corrective Action to

~

. Prevent Rccurrcncc 79-04-05 744.0 C

RC FUELXX Unit No.

4.remained-out of service for scheduled refueling, maintenance, and inspections.

(Nuclear and non-nuclear systems)

(Continued from previous month)

F: Forced S: Scheduled (l)/77)

Reason:

A-Equipmcnt Failure (Explain)

B-Maintenance or Test.

C-Rclucling D-Regulatory Restriction E-Operator Training & Liccnsc Examination F-Administrative G-Operational Error (Explain) li-Other (Explain) 3 Method:

I -Manual 2-hlanual Scram.

3-Automatic Scram.

4-Other (Explain)

Exhibit G - Instructions for Preparation ol Data Entry Sheets I'or Liccnscc Event Reiiort (LER) File (NUREG-016I) 5 Exhibit I - Same Source

0 e

- AVERAGE DAILYUNITPOWER LEVEL DATE Zune 9

19 79 COMPLETED IIY V. T. ChilSOn TELEPHONE 05 55 2-38'24 MONTH MAY 1'979 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 10 DAY 'VERAGE DAILYPOWER LEVEL (MWe-Net) 17 18 I9 20 21 22 23 24 25 26 27 12 13 14 15 16 30 31 INSTRUCTIONS On this fortnat, list the average daily unit power level in MWe-Net for each day in the reporting nu>nth. Conlpule to the nearest whole megawatt.

{~)/77 )

OPERATING DATAREPORT DOCKET NO.

DATE June 9

1979 COMPLETED BY ~~lleon TELEPHONE ~i~92-3824 OPERATING STATUS I. Unit Name St. Lucie Unit No.

1

2. Reporting Period:

1979

3. Licensed Thermal Power (MWt):

2560 4..Nameolate Rating (Gross MWe):

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

850 822 777 Notes Scheduled refueling, maintenance.,

inspections and tehts cont:inued during the month.

8. IfChanges Occur. in Capacity Ratings (Items Number 3.Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. IfAny (Net MWe):
10. Reasons For Restrictions, IfAny:

NONE This Month Yr.-to-Date Cumulative 3 623.0 2

0 0.0 1 991.7 0.0 5 038 847 1 635 500 1 539 542 55.0 55.0 54.7 53.0 7.8

11. Hours In Reporting Period 744. 0
12. Number Of Hours Reactor Was Critical 0.0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
  • 0.0
15. Unit Reserve Shutdown Hours 0.0
16. Gross Thermal Energy Generated (MWH) 0.0
17. Gross Electrical Energy Generated (MWH) 0 ~ 0 IS. Net Electrical Energy Generated (MWH) 3 760
19. Unit Service Factor 0.0
20. Unit AvailabilityFactor 0.0
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net) 0.0
23. Unit Forced Outage Rate 0.0
24. Shutdowns Scheduled Over Next 6 Months (Type.,Date. and Duration of Each):

21'07.0 6

7 7.1 118.5 16 350.'9 21.0 39 256 995 12 742 450 11'82 380 76.4 76.5 72.0

" '69.8 6.6

25. IfShut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIALELECTRICITY COhIMERCIALOPERATION

('>/77)

UNITSHUTDOWNS AND POlVER REDUCTIONS DOCKET NO. St. Lucie Unit No.l REPORT hIONTH No.

a-r I Ul J

Licenscc Evc lit Rcport-C CP~

Cl 0

Cause &Corrective Action to Prevent Recuffcncc 79-04&1 744.'O.

C 4

N/A RC FUELXX Unit was removed from service for scheduled refueling, maintenance, and inspections.

(Continued from previous month)

(Nuclear and non-nuclear systems)

F: Forced S: Scheduled

<<>/77)

Reason:

A-Equipmcnt Failure (Explain)

B-hIaintenance or Test

~

C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

II.Other (Expl air l

)

hIcthod:

I -Manual 2-h(anual Scram.

3-Automatic Scram.

4.Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets I'or Licensee Event Report (LER) File (NUREG-OI6I)

Exhibit I - Salne Source

P ~

BOX 529100, MIAMI,FL 33152 h

FL'ORIDA POWER & LIGHT COMPANY June 9,

19 79 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.,

20555 Gent. lemen:

Attached are the May, 1979, Operating Summary Reports for Turkey.Point 'Unit Nos.

3 and 4 and St. Lucie Unit No. l.

Very truly yours, Vice President Power Resources VTC/DDC cc:

Mr. James P. O'Reilly Robert.Lowenstein, Esquire PEOPLE

~.. SERVING PEOPLE

SUMiM OF OPERATING EXPERiENCE DOCKET NO -

50 250 UNIT Turkey Point Unit No.

3 DATE

.June 9,

1979 COMPLETED BY V. T. Chilson REPORT MONTH MAY, 1979 TELEPHONE (305) 552-3824 Unit operated at approximately 100% R.P. until Unit was removed from service to perform integrated'afeguards surveillance test, except for outage of May 4, 1979.

Refer to "Unit Shutdowns and Power Reductions" section of the May, 1979, Operating'tatus Report for. additional information.

Major Safety-related maintenance activities performed during the month included:

Replaced exciter power transformers on Emer-gency Diesel-Generator No. A.

Refer to LER 250-79-20 for additional details.

.Repaired voltage regulator on Emergency Diesel-Generator No. B.

Refer to LER 250-79-20 for additional details.

SU OF OPERATING EXPERIENCE DOCKET NO.

50 251

'NIT Turkey Point Unit No.

4 DATE June 9,

1979 COMPLETED BY V. T. Chilson REPORT MONTH 1979 TFLEPHONE '305) 552-3824 Unit scheduled refueling, maintenance, inspections, and tests continued during the month; Refer to "Unit Shutdowns and Power Reductions" section of the April 1979, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Installed 65 new fuel assemblies.

Safety-related pipe hanger anchor inspection and repair program (IE Bulletin No.

79-.02) in progress.

Installed spare rotating element in high-head safety injection pump No.

4B.

SU OF OPERATING EXPERiENCE DOCKET'O..

50 335 UNIT St. Lucie Unit No.

1 DATE June 9,

1979 COMPLETED BY V.T. Chilson TET EPHONE (305) 552-3824 REPORT MONTH MAY, 19 79 Scheduled refueling, maintenance, inspections, and tests continued during the month.

Refer to "Unit Shutdowns and Power Reductions" se'ction of the May, 1979, Operating Status Report-for additional i;nformation.

Major Safety-related maintenance activities performed during the month included:

Completed modification of charging.pump suction piping Chaiging pump No.

3B was returned to service.

Corrective actions included installing new pump casing.

Refer to LER 335-79-17..