ML17208A476
| ML17208A476 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie, Turkey Point |
| Issue date: | 06/09/1979 |
| From: | Schmidt A FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML17208A477 | List: |
| References | |
| NUDOCS 8004230330 | |
| Download: ML17208A476 (19) | |
Text
REGUl ATORY liVFORiMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:8004230330 DOC SEDATE:
79/06/09 NOTARIZED:
NO FACIL:50 250 Turkey Point Planti Unit 3i Florida Power and Light C
$=~>T rkey Point Planti Unit 4i Florioa Power and Light C
50 335
. Lucie Planti Unit 1~ Florida Power 8 Light Co.
AUTH'UTHOR AFFILIATION SCHtlIOTJA ~ D ~
Flor ida Power L Light Co ~
REC IP ~ NA<<E RECIPIENT AFFILIATION Office of Management and Program Analysis DOCKET 05000250 05000251 05000335
SUBJECT:
Forwards montnly operating repts for <<ay 1979.
DISTRIBUTION CODE:
A008S COPIES RECEIVED:LTR g ENCL +
SIZE:
TITLE: Annual
~
Semi Annual 8'onthly Ooer ating Reports (OL Stag RECIPIENT ID CODE/NA<<E ACTION:
05 BC 4)f8%/ J e/8 INTERNAL:
1 REG FILE 1
16 DIR DOR 19 REAC SAFT BR 21 EES 23 EFFL TR SYS FXTERNAL: 03 LPDR 24 iVAtl. LAB 26 ACRS COPIES LTTR ENCL 6
6 1
1 2
2 1
1 1
1 1
1 1
1 15 15 REC IP I E'VT ID CODE/NAME 02 NRC PDR l4 <<PA 18 ENGR BR 20 PLAiNT SYS BR 22 CORF PERF BR AEOD
~
04 NSIC 25 BROOKHAVEiV COPIES LTTR ENCL 1
1
'2 2
1 1
1 1
1 1
1 1
1 1
1 1
APR 25 ]98O torAL Nu<<@FR OF COPIES REourREO:
LTTR
. BOX 529100, NIIAMI,FL 22152 2
~
2 2 2
FLORIDA POYP=R 6 LIGHT OO!APANY June 9,
1979 Office of Management Information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Gentlemen:
Attached are the May, 1979, Operating Status Reports for Turkey Point Unit Nos.
3 and 4 and St. Lucie Unit No. l.
Very truly yours, Vice President Power Resources VTC/DDC cc:
Mr. James P. O'Reilly Robert Lowenstein, Esauire
AVERAGE DAILYUNITPOWER LEVEL DOCKET NO 50 - 250 DATE J~e 9
~
COMPLETED IIY V. T. Chilson TELEPHONE
'MONTH MAY 1979 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)
I 664 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 66l 17
.7 10 12 13 IS 16 INSTRUCTIONS 667 665 66 667 666 664 661 658 658 18 19 20 21 22 23 2S 26 27 28
'>9 30 31 NOTE:
664 664 660 Average daily power level greater than 666MWe due to cooler condenser cooling water.
Qn this format. list the average daily unit power level in M~Ve.Ne. for each day in the rept>rting >tn>nth. C>>ntpute to the nearest whole megawatt.
(A /77
)
OPERATING DATAREPORT OPERATING STATUS
- 1. Unit Name Turke Point Unit No.
3
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWel:
760
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
DOCKET NO.
DATE 2IIne Ri COMPLETED IIY V.T. Chilson TELEPHONE ~~~-3824 Notes-Unit No.
3 operated at approximately 100% R.P. unt Unit was removed from ser-vice to perform integrated safeguards, surveillance test except for outage of May 4, 19 79.
S. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NONE This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744.0 3 623.0
- 12. Number Of Hours Reactor Was Critical 598.1 943. 2
- 13. Reactor Reserve Shutdown Hours 14. Hours Generator On-Line 595.6 831. 7
- 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH) 1 299 648 1 750 006
- 17. Gross Electrical Energy Generated (MWH) 412 265 554 600 IS. Net Electrical Energy Generated (MWH) 392 189 514 830
- 19. Unit Service Factor 80.1 23.0
- 20. Unit AvailabilityFactor 80.1 23.0
- 21. Unit Capacity Factor (Using MDC Net) 79.1
- 21. 3
- 22. Unit Capacity Factor (Using DER Net) 76.1 20.5
- 23. Unit Forced Outage Rate 0.6 12.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each l:
56 864.6 43 515.6 194. 6 42 009;0 97.3 83 516 954 26 589 030 25 162 007 73..9
- 74. 0 67.0
- 63. 9 2.8 I
- 25. IfShut Down At End Of Report Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
June 1
1979 Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (L)I(71
UNITSIIUTDOWNS AND POWER REDUCTIONS DOCKET NO.
DATF June 9
19 79 it No.3 REPORT hlONTII Nl1.
J a gee
~
C/7 Llccnscc Event Report >
Cause 8r C,orrecllvc Aclion lo Prevent Recuncnce 05-04 3.6 A
N/A HH VALVEX Unit was tripped by steam generator No.
38 level protection system.
Corrective actions included replacing failed gasket in condensate recircu-lation line.
(Non-nuclear system) 79-05-25 144. 8 8
N/A zz zzzzzz Unit was removed from service to perform integrated safeguards sur-veillance test.
(Nuclear system)
I F: F<)reed S: Scheduled
('>/77)
Reason:
A-Equipment Failure (Explain)
D.hlaintenance oi Test C-Refueling D.Regulatory Restriction I'.-Operator Training 8r. Liccnsc Exalnination F-Administrative G Opcratioilal Error (Explain)
I I.Other (Explain) 3 Method:
I -Manual 2-Manual Scram.
3-Automatic Scraln.
4.Other (Explain)
Exhibit G ~ Instructions for Preparation of Data Enlry Sheets for Licensee Event Report (LER) File (NUREG-016I )
Exhibit I - Salnc Source I
~
~ >>%
~
~
AVERAGE DAILYUNITPOWER LEVEL DATE un 1979 COMPLETED BY TELEPHONE MONTH MAY, l979 DAY AVERAGE DAILYPOWER LEVEL IMWe.Net)
DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 17 IS 19 20 2I 22 23 IO 25 26 l3 l4 IS I6 28 19 30 3l INSTRUCTIONS Qn this format. list the average daily Unit power level in MWe.Net for each day it) the reporting tnonth. Cotnputc to the nearest whole megawatt.
(o/77)
OPERATING DATAREPORT DOCKET NO.
DATE Junti tt ~79 COMPLETED BY ~~hilson TELEPHONE UQB H2-3824 OPERATING STATUS
- 1. Unit Name:
Turke Point Unit No.
4
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
2200
- 4. Namep)ate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
Notes Unit No.
4 scheduled refueling, maintenance, in-spections, and tests contin-ued during the month.
S. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NONE This Month Yr.-to.Date Cumulative 3 623.0 2 188.3 2 182.0 4 077 101 1 267 100 1 191 500 60.2 60.2 49.4 47.5 1.4 II. Hours In Reporting Period 744.0
'2.
Number Of Hours Reactor Was Critical 13. Reactor Reserve Shutdown Hours 14'. Hours Generator On-l.ine 15. Unit Reserve Shutdown Hours 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
Ig. Net Electrical Energy Generated (MWH)
-1 239
- 19. Unit Service Factor 20. Unit AvailabilityFactor 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 24. Shutdowns Scheduled Over Next 6 Months (Type. Date. and Duration of Each):
50'592.0 36 535.9 138.8 35 001.0 72 216 968 2 825 21 876 205
- 69. 2 69.2 65.3 62.4 2.7
- 25. IfShut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
June 17 1
7 Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COAIMERCIALOPERATION
('>/77 )
UNITSIIUTOOWNSAND POWER REDUCTIONS REPORT hION'fll DOCKETNO.
COh(PLETED BY
<V<<.
Ihte Llccnscc Event Report >
Cl~
QQ c<
C +
Cause Ec Corrcclivc Action lo Prevent Recurrence 79-04-05 S
744.0 N/A RC FUELXX Unit No.
4 remained out of service for scheduled refueling, maintenance, and inspections.
(Nuclear and non-nuclear systems)
(Continued from previous month)
I': I orccd S: Schedule/77) 7 Reason:
A-E<)uipment Failure (Explain)
B-hlaintcnancc or Test
( -Rcfucling I) Regulatory Restriction I'..Operator Training & Liccnsc Examination I'-Administrative G.Operational Frn>r (fxplain)
I I.Other (Explain)
Method:
I.manual 2.hlanual Scram.
3-Aulolnalic Scfanl.
4.Other (Explain)
Exhibit G-Instructions for Preparation ol'ata Enlry Sheets for Licensee Event Report (I.ER) File (NUREG-Ol 6I )
Exhibit I - Salne Source
AVERAGE DAILYUNITPOWER LEVEL
)
e
~
pATE
>TUBe 9
COMPLETED IIY V. T. ChilsOn MONTH MAY 1979 DAY AVERAGE DAILYPOWER LEVEL (MWe Net) 10 DAY AVERAGE DAILYPOWER LEVEL (MWe.Net )
l7 18 19 20 21 22 23 24
'>5 26 7'>
12 13 14 15 16 28
'>9 30
" 31 INSTRUCTIONS On this format. list the average daily unit p<>wer level in Mme.Net for each day tn the rep<>rting n><>nth. C<>n>pote to the nearest whole megawatt.
(<)I771
OPERATING DATAREPORT DOCKET NO.
DATE >~A B
LBTB COMPLETED BY S 'wilson TELEPHONE ~I~i2-3824 OPERATING STATUS
- 1. Unit Name St. Lucie Vnit No.
1
- 2. Reporting Period:
- 3. Licensed Thermal Po~er (MWt):
2 60
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
850 822 777 Notes - Scheduled refueling, maintenance, inspectfons and teSts continued during the month.
S. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted. IfAny (Net MWe):
- 10. Reasons For Restrictions, IfAny:
NONE This Month 744, 0 Yr.-to-Date 3 623.0 2
0
- 11. Hours In Reporting Period
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electrical Energy Generated (MWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months 0.0 0.0 1 991.7 0.0 0.0 0.0 5 038 847 0.0 1 635 500 1 539 542 0.0
- 3 760 55.0 0.0 55.0 0.0 0.0 54.7 53.0 0.0 7.8 0.0 (Type, Date, and Duration of Each l:
Cumulative 21'07.0 797.1 118.5 16 350.'9 21.0 39 256 995 12 742 450 11 982 380 76.4 76.5 72.0
'69. 8 6.6
- 25. IfShut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIALCRITICALITY IN ITIAL ELECTRICITY COMMERCIALOPERATION
('>/77 )
UNITSIIUTDOIVNS AND PO)VER REDUCTIONS DOCKET NO.
UNITNAMF S t. Lucie Unit No. 1 REPORT MONTII
>IAY 19 79 No.
Date Liecnscc Event Rcport >
ClC 0
Cause A. Corrective Action lo Prevent Recurrence 5
79-04W1 S
744.0.
C N/A RC HIELXX Unit was removed from service for scheduled refueling, maintenance, and inspections.
(Continued from previous month)
(Nuclear and non-nuclear systems)
-a I I: Forced S: Schedule(l I'I/77)
Reason:
A.Equipmcnt Failure (Explain)
II.Maintenance or Test
(.Refueling D.Regulatory Restriction E-Operator Training Ec Uecnsc Examination F-Administrative G.Operational Error (Explain)
II.Other (Fxplain)
Method:
I -Manual 2-hlanual Scram.
3-Automatic Seratn.
4.Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets I'or Licensee Event Report (LL'R) File (NUREG-OI6I)
Exhibit I - Satne Source
0
. BOX 529100, MIAMI,FL 33I92
~ LCRIOA. OVs R S LIGHT COIrl. ANY June 9,
1979 Office of Management information and Program Controls U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Gentlemen:
Attached are the May, 1979, Operating Summary Reports for Turkey Point Unit. Nos.
3 and 4 and St. Lucie Unit No. l.
Very truly yours, Vice President Power Resources VTC/DDC cc:
Mr. James P. O'Reilly Robert Lowenstein, Esquire
SUMb&~RY OF OPERATING EXPERIENCE DOCKET NO.
50 250 UNIT Turkey Point Unit No.
3 DATE June 9,
1979 REPORT MONTH MAY, 19 79 COMPLETED BY TELEPHONE V. T. Chilson (305) 552-3824 Unit operated at approximately 100% R.P. until Unit was removed from service to perform integrated safeguards surveillance test, except for outage of May 4, 1979.
Refer to "Unit Shutdowns and Power Reductions" section of the May, 1979, Operating'tatus Report for additional information.
Major Safety-related maintenance activities performed during the month included:
Replaced exciter power transformers on Emer-gency Diesel-Generator No. A.
Refer to LER 250-79-20 for additional details.
Repaired voltage regulator on Emergency Diesel-Generator No. B.
Refer to LER 250-79-20 for additional details.
SUMMARY
OF OPERATING EXPERiENCE DOCKET NO.
50 251 UNIT Turkey Point Unit No.
4 DATE June 9,
1979 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH MAYi 1979 Unit scheduled refueling, maintenance, inspections, and tests continued during the month; Refer to "Unit Shutdowns and Power Reductions" section of the April 1979, Operating Status Report for additional informat ion.
Major Safety-related maintenance activities performed during the month included:
Installed 65 new fuel assemblies.
Safety-'related pipe hanger anchor inspection and repair program (IE Bulletin No. 79-02)
'in progress.
installed 'spare rotating element in high-head safety injection pump No.
4B.
SUMMARY
OF OPERATING EXPERiENCE DOCKET NO-50 - 335 UNIT St. Lucie Unit No.
1 DATE June 9,
1979 COMPLETED BY V.T. Chilson REPORT MONTH MAY, 19 79 TELEPHONE (305) 552-3824 Scheduled refueling, 'maintenance, inspections, and tests continued during the month.
Refer to "Unit Shutdowns and Power Reductions" section of the May, 1979, Operating Status Report for additional i;nformation.
Major Safety-related maintenance activities performed during the month included:
Completed modification of charging. pump suction piping.
Charging pump No.
3,B was returned to service.
Corrective actions included installing new pump casing.
Refer to LER 335-79-17..