ML17339A692

From kanterella
Jump to navigation Jump to search
Forwards Steam Generator Insp Program Planned for Apr 1980
ML17339A692
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 03/14/1980
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
L-80-83, NUDOCS 8003190489
Download: ML17339A692 (6)


Text

REGULATORY ORMATION DISTRIBUTION SY, (RIDS)

ACCESSION NBR:8003190489 DOC ~ DATEi. 80/03/14 NOTARIZED:

NO, DOCKET FAC1L:50"251 Turkey Point Plantr Unit 4E Florida Power end Light C

05000251 AUTH'AME AUTHOR AFF'ILIATION UHR IG e R ~ E'B Florida Power L Light Co, RKCIP, NAME RECIPIKNTI AFFILIATION EISENHUTiD,G, Division of Operating Reactors SUBJECT! Forwards steam generator insp program planned for Apr 1980

'ISTRIBUTION.

CODE:

AOOIS COPIES RECEIVED:LTR 'Q ENCL&

SIZEi TITLE: Gener el Di st r ibut i on for ef tel Issuance,of Operat f ng Lic.

~ eeee>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>eeee>>>>>>>>>>>>>>>>>>ee>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>

RKC IP IENT ID CODE/NAME ACTION:

05 BC ~~~

INTERNAL 01 REG F I 17 ENGR BR 19 PLAlNT SYS BR 21 EFLT TRT SYS OELD EXTERNAL: 03 LPDR 23 ACRS COPIES LiTTR ENCL 7

7 1

1 2

2 1

1 1

1 1

1 0

1 1

16 16 02 NRC PDR 15 CORE

PERF, BR 18 REAC SFTY BR 20 EEB EPB DOR STS GROUP LEADR 04 NSIC 1

1 1

1 1

1 1

1 1

1 1

1 1

RECIPIENT COPIES ID CODE/NAME" LTTR ENCL gag go 880 TOTAL NUMBER OF COPIES'EQUIRED'TTR 3&

ENCL 37

k I

~

~

If EJ y4r ~

JJ III

+~Ig il':3

-5'j

. BOX 629100, MIAMI,FL 33162

~

~

~yItillg~

FLORIDA POWER 8 LIGHTCOMPANY March 14, 1980 L-80-83 Office of Nuclear Reactor Regulation Attention:

Mr. Darrell G. Eisenhut, Acting Director Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D.

C.

20555

Dear Mr. Eisenhut:

Re:

Turkey Point Unit 4 Docket No. 50-251 Steam Generator Ins ection Pro ram Attached for your information is a copy of the Turkey Point Unit No.

4 Steam Generator Inspection Program.

This inspection is planned for April, 1980.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 5 Technology REU/MAS/ah Attachment cc:

Mr. James P. O'Reilly, Region II Harold F. Reis, Esquire 8 0 0 3 1 g 0 lg(j PEOPLE... SERVING PEOPLE

TURKEY POINT UNIT NO, 4

STEAI'3 GENERATOR INSPECTION PROGRAH PLANNED FOR APRIL 1980 l.

Eddy Current testing of U-bends is planned as follows:

a.

Steam Generator B,

rows 2-.5, columns 1-92; un plugged tubes will be tested at 100 KHZ using beaded flex 0.540 probe.

b.

Any tube(s) which give indication at 100 KHZ will be reorobed using 400 KHZ.

2.

Hot leg tube gauging Hill be conducted on all three steam generators utilizing three different sized eddy current probes

(,540 in 610 in.,

and

.650 in. diameters).

The unshaded areas on the attached tube map identify the tubes to be probed.

3.

Cold leg tube gauging will be conducted on all three steam generators utilizing two different sized eddy current probes

(.540 in.,

and

,610 in,).

The blocked area on the attached tube map indicates the extent of the cold leg gauging, 4.

Handhol,e inspections using TV and/or photograohs will be used to inspect the flow slots and determine the extent of hourglassing on the 81 tube support plates in Steam Gene-rators A, B, and C.

5. i, Reg.

Guide 1,83 inspection will be performed.

6.

Preventive plugging will be based upon the inspection

results,

~

I