ML17339A641
| ML17339A641 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 03/03/1980 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| L-80-68, NUDOCS 8003060565 | |
| Download: ML17339A641 (8) | |
Text
REGUL'ATORY FORMATION DISTRIBUTION SY "M (RIDS)
ACCESSION NBR!8003060565 DOC ~ DQTE:. 80/03/03 NOTARIZED:
NO DOCKET FACIL:50 250 Turkey Point Plants Unit 3E Florida Power and L-ight C"
05000250 50 251 Turkey Point Plant~
Unit 4~ Florida Power and Light C
05000251 AUTH INANE'UTHOR AFFIlIATION UHRIGE R ~ E ~
Florida Power L Light Co.
REC IP ~ NAME RECIPIENT AFFILIATION EISENHUT~D ~ G ~
Division of Operating Reactors SUBJECTS Forwards tables containing max predicted values of Fq for Unit 3Efor life of Cycle 7E8 Unit OrCycle 6 for burnup greater than 3~770 MND/MTU,Tables forwarded for info only'ISTRIBUTION CODE:
ABOIS COPIES RECEIVED:LTR B: ENCLig SIZE:
TITLE: General Distribution for after Issuance of Operating Lic NO ES'I N O T E S e wwwmmwmeseeeeweenemwmeeweemeeeeeeeeeeewreee~weewesmmeeeewwmoemweewmwoaeeeeeaaeetwmeneemwwe wmwmw~
RECIPIENT ID CODE/NAME ACTIO~:
05 BC dg44' INTERNAl!
REG F
1 17 ENGR BR 19 PL'ANT SYS BR 21 EFLT TRT SYS OELD il EXTERNAL': 03 LPDR 23 ACRS COPIES LtTTR ENCL 7
7 1
2 2
1 1
1 1
1 1
1 0
1 1
16 16 RECIPIENT ID CODE/NAME 02 NRC PDR 15 CORE PERF'R 18 REAC. SFTY BR 20 EEB EPB DOR STS GROUP LEADR 04 NSIC COPIES LTTR ENCL BAR L>589 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 38 ENCL 37
P P
~
~
IP P
~F W
.O. BOX 629100, MIAMI,FL 33162
~4lisz J~l~)svaA FLORIDA POWER 4 LIGHTCOMPANY March 3, 1980 L-80-68 Office of Nuclear Reactor Regul ati on Attention:
Mr. Darrell G. Eisenhut Acting Director Division of Operating Reactors U. S. Nuclear Regulatory Commission Washington, D.
C.
20555
Dear Mr. Eisenhut:
Re:
Turkey Point Units 3 and 4
Docket Nos.
50-250 and 50-251 Maximum Predicted F
The attached tables contain the maximum predicted values of Fq for Turkey Point Unit 3, Cycle 7 for the life of the cycle, and Turkey Point Unit 4, Cycle 6 for burnup greater than 3,770 MWD/
MTU.
The attached
- tables, which summarize the results of 18-case
- analyses, are submitted to you for information only.
Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/RAK/ah Attachments cc:
J.
P. O'Reilly, Region II Harold F. Reis, Esquire 080605 0~
PEOPLE... SERVING PEOPLE
1
TABLE 1
Turkey Point Unit 3 - Cycle 7
Ha'~ rFq x PR-1] versus Axial Height During informal Op ration P
~
Core Heiqht (Feet) 0.0 0.5 1.0 1.5 2.0 2.5 3.0
'.5 4.0 0.5
- 5. 0.
5.5 6.0 6.5 7.0 7.5
'.0 8.5
- 9.0, 9.5.
'0.0 10 5
- 11. 0 1 1. 5 12.0 Hax LFq x Pp 1J
'T 0.77 1.56
. 1. 9'l
- 1. 99
~
1.97 1
93
'l. 91
- l. 95
] 08
~'.01.
- 2,02.,
2,03.
.2,03 2,02 1.99
.1. 98 1..98
~ 1.96.
- l. 93 1,88
'l. 82 1.82
..1 73
'..1.AO.
- 0. 72
4 IIw 4l
TABLE l TURYEY POINT VHIT 4 CYCLE 6 Haximum LF~ x PR lj versus Axial Height During Normal Operation Yal.id for Cycle 6 Burnup
.Between 3770 - 13000 tlirlD/HTU Core Hei ht Feet 0.0 0.5 1.0 1.5
2.0 2.5 3.0 3.5 4;0
'.5 5.0 5.5 6.0 6.5 7.0 7.5 8.0 8.5.-
9.0 9.5
- 10. 0
- 10. 5 11.0 11.5
.12.0
'ax ~"
x "Relj T
0.78 1.46 1.80 1.97 2.01 1.97 1.95 1.94 1.92 1.90 1.88 1.86 1.85 1.84 1.83 1.82 1.80 1.80
- 1. 81 1.80 1.82 1.79 1.67 1.37 0;73