ML17339A637

From kanterella
Jump to navigation Jump to search
Revised Pages 3.2-2 & 3.2-3 & Table 4.1-1 to Tech Specs Re Control Rod Position & Rod Position Indication
ML17339A637
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 02/27/1980
From:
FLORIDA POWER & LIGHT CO.
To:
Shared Package
ML17339A635 List:
References
NUDOCS 8003040478
Download: ML17339A637 (6)


Text

5. CONTROL ROD POSITION INDICATION If either the power range channel deviation alarm or the rod deviation monitor alarm are not operable rod positions shall be logged once per shift and after a load change greater than l(5 of rated power. If both alarms are inoperable for two hours or more, the nuclear overpower trip shall be reset to 935 of rated power.

6. POWER DISTRIBUTION L IHITS
a. Hot channel factors:

(1) With steam generator tube plugging >225 and <25K, the hot channel factors (defined in the basis) must meet the following limits at all times except during low power physics tests:

Fq (Z) < (2e03'/P)x K(Z) > for P > ~ 5 Fq (Z) < (4.06) x K(Z), for P < .5 F

H

< 1.55 [l.+0.2 (1-P) j Where P 'is the fraction of. rated power at which the core is operating; K(Z) is the function given in Figure 3.2-3b; Z is the core height location of Fq If F , as predicted by approved physics calculations, exceeds 2.03, the power will be limited to the rated power multiplied by the ration of 2.03 divided by the predicted F , or augmented surveil.lance of hot channel factors shall be implemented.

(2) With steam generator tube plugging < 22K, the hot channel factors (defined in the basis) must meet the following limits at all times except during low power physics tests:

Fq (Z) <'2e 10/P )x K(Z) p for P > e5 F (Z) < (4.20)x K(Z), for P < .5 F

H

< 1.55 [1.+0.2 ('1-P)]

Where P is the fraction of rated power at which the core is operating; K(Z) is the function given in either Figure 3.2-3 or 3.2-3a; Z is the core height location of Fq.

3 ~ 2 2-27-80 soosoao +Pg

0 0 l P

J

~ g t

TABLE 4.1-1 MINIMUM FREQUENCIES FOR CHECKS, CALIBRATIONS AND TEST OF INSTRUMENT CHANNELS Channel Descri tion Check Calibrate Test Remarks

1. Nuclear Power Range S (1) D (2) M (3) 1) Load v.s. flux curve (Check, Calibrate and Test M*(4) Q*(4) 2) Thermal power calculation only applicable above 3) Signal to T; bistable 10$ of rated power.) action (permissive, rod stop; trips)
4) Upper 8 lower detectors for symmetric offset (+5 to -5X)

Nucl ear Intermediate Range S (1) ~ N.A. P (2) 1) Once/shift up to 50K, R.P.

2) Log level; bistable action (permissive, rod stop, trip)
3. Nuclear Source Range S (1) N.A. P (2) 1) Once/shift when in service
2) Bistable action (alarm, trip)
4. Reactor Cool ant Temperature S B/W (1) 1 1) Overtemperature- T (2) ~ 2) Overpower- T
5. Reactor Coolant Flow
6. Pressurizer Water Level
7. Pressurizer Pressure M1
8. 4 kv Voltage 8 Frequency N.A. Reactor protection circuits only
9. Analog Rod Position R(1) With step counters
1) Calibrate indicated position to within 12 steps of actual position 2-27-80

0 '

l 1I

<6

r. I~

(

P-4 f

C

'C I

l F

l V

1 t

STATEOF FLORlDA )

) ss COUNTY OF DADE )

Robert E. Uhrig, being first duly sworn, deposes and says:

That he is a Vice President of Florida Power 6 Light Company, the Licensee herein; That he has executed the foregoing document; that the state-ments made in this said document are true and correct to the best of his knowledge, information, and belief, and that he is authorized to execute the document on behalf of said Licensee.

Robert E. Uhrig Subscribed and sworn to before me this

~~day of l9 PO 4

r NOTARY PUBL , in and for the county of Dade, State of Florida b!0i~ PQbtic, Sh".~Q cf PiQ'i~t~ ct Lozg0 My Coo.rr'"~ha Expires Ocia&r 30, 'IS33 f $y commission exp3.res Bordcxl t!>re

ll