ML17339A461

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. Westinghouse Bfd Relays Used in Reactor Protection & Safeguards Sys at Facility.All Bfd Relays Replaced to Insure Operable Relays Installed
ML17339A461
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/20/1979
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-79-25, NUDOCS 8001180157
Download: ML17339A461 (2)


Text

gF ~jPrL.Pt I~

4

~

~

0,

~ A FLORIDA POWER IL LIGHT COMPANY December 20 19?9 L-?9-356 Mr. James P. O'.Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re: RI I: JPO 50-250, 50-251 IE Bulletin 79-25 Westinghouse BFD relays, Style used in the Reactor P rotectson and Safeguards System nsts 3 and 4. In 1977, all BFD relays were replaced under a s maintenance procedure to ensure that at Turkey Point.

e, 50?2A49, Coil Style 1271C50GOl at, are, Turkey Point o erabl e relays were install'ed a opera The Instrument 8 Control

' Department at the, 1'ant .uti d fo 1 ai- 1 e d re 1 ays. The procedure en on'est~ ng 'nd replacement' l so I ncl uded and a time test as sspecified ecs se b y earlier ea IE Bulletins and Westinghouse Any time a replacement is re q uired , it ss performed under a Plant Work an ocumented in accordance with requirements governing Please call if, yo u

, have further questions on this subject.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/MAS/ms cc: Harold Reis, Esquire QP+GK~AG COPY

/