ML17339A461

From kanterella
Jump to navigation Jump to search
Responds to IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety-Related Sys. Westinghouse Bfd Relays Used in Reactor Protection & Safeguards Sys at Facility.All Bfd Relays Replaced to Insure Operable Relays Installed
ML17339A461
Person / Time
Site: Turkey Point  
Issue date: 12/20/1979
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-79-25, NUDOCS 8001180157
Download: ML17339A461 (2)


Text

~

~

gF ~jPrL.Pt I~

4 0,

~

A FLORIDA POWER IL LIGHTCOMPANY December 20 19?9 L-?9-356 Mr. James P. O'.Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re:

RII:JPO 50-250, 50-251 IE Bulletin 79-25 Westinghouse BFD relays, Style 50?2A49, Coil Style 1271C50GOl used in the Reactor Protectson and Safeguards System at, Turkey Point e,

are, nsts 3 and 4.

In 1977, all BFD relays were replaced under a

s maintenance procedure to ensure that o erabl at Turkey Point.

a opera e relays were install'ed The Instrument 8 Control Department at the, 1'ant.uti d

fo 1

1 d

1 on'est~ ng 'nd replacement' l so I ncl uded ai-e re ays.

The procedure en and a time test as specified b

ea s ecs se y earlier IE Bulletins and Westinghouse q

, it ss performed under a Plant Work Any time a replacement is re uired an ocumented in accordance with requirements governing Please call if, o

, y u have further questions on this subject.

Very truly yours, Robert E. Uhrig Vice President Advanced Systems 8 Technology REU/MAS/ms cc:

Harold Reis, Esquire QP+GK~AG COPY

/