ML17339A344
| ML17339A344 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 11/13/1979 |
| From: | Schwencer A Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML17339A345 | List: |
| References | |
| NUDOCS 7911300632 | |
| Download: ML17339A344 (10) | |
Text
gag RK0(
~4 0
<<ww*+
UNITED STATES NUCLEAR REGULATORY COMMISSlON WASHINGTON, D. C. 20555 FLORIDA POLlER AND LIGHT COMPANY DOCKET NO. 50-250 TURKEY POINT NUCLEAR GENERATING UNIT t'0.
3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.
51 License No.
DPR-31 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
B.
C.
D.
The application for amendment by Florida Power and Light Company (the licensee) dated September 20, 1979, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the'Act, and the rules and regulations of the Comission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
~9118 00
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No. DPR-31. is hereby amended to read as follows:
(B)
Technical S ecifications The Technical Specific'ations contained in Appendices A and B, as revised through Amendment No. 51, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION
Attachment:
Changes to the Technical Specifications Date of Issuance:
November 13, 1979 A. Schwencer, Chief Operating Reactors Branch gl Division of Operating Reactors
~P,S AEGII Cg 0
a
~O
++*++
UNITED STATES NUCLEAR REGULATORYCOMM(SSION WASHINGTON, O. C. 20555 FLORIDA POLPER AND LIGHT COMPANY DOCKET NO.
50>>251 TURKEY POINT NUCLEAR GENERATING UNIT NO.
4 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 42 License No.
DPR-41 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
C.
D.
The application for amendment by Florida Power and Light Company (the licensee) dated September 20, 1979, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Commission's rules and regulations set forth "
in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the COIIission's regulations; The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.
The issuance of'his amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.B of Facility Operating License No.
DPR-41 is hereby amended to read as follows:
(B)
Technical S ecifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 42
, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Attac hment:
Changes to the Technical Specifications
)
A. Schwencer,'hief Operating Reactors Branch 81 Division of Operating Reactors Date of Issuance:
November 13, 1979
ATTACHMENT TO LICENSE AMBIDMENTS AMENDMENT NO. 51 TO'.FACILITY OPERATING LICENSE NO.
DPR-31 AMENDMENT NO. 42 TO FACILITY OPERATING LICENSE NO.
DPR-41 DOCYET NOS.
50-250 AND 50-25'.
Revise Appendix A as follows:
Remove Pa es 3.14-2 Table 3.5-2 Insert Pa es 3.14-2 Table 3.5-2
TABLE 3.5-2 ENGINEERED SAFETY FEATURES ACTUATION, NO.
FUNCTIOiNAL UNIT MIN.
OPERABLE CHANNELS 2
MIN.
DEGREE OF REDUN-DANCY OPERATOR ACTION IF CONDITIONS OF COLUMN 1 OR 2 CANNOT BE MET
'1.
SAFETY INJECTION 1.1 Manual 1.2 High Containment Pressure 1.3 High Differential Pressure between any Steam Line and the Steam Line Header 1.4 Pressurizer Low Pressure" 1.5 High Steam Flow in 2/3 Steam Lines with Low Ta~g or Low Steam Line Pressure
~
1/line in 1
each of 2 lines Cold Shutdown Cold Shutdown Cold.Shutdown Cold Shutdown Cold Shutdown 2.
CONTAINMENT SPRAY 2.1 High Containment Pressure and High-High Containment Pressure (Coincident) 2 per set 1/set Cold Shutdown This signal may be manually bypassed, when the reactor is shut down and pressure is below 2000 psig Amendment No. 51, Unit 3 Amendment No. 42, Unit 4
b.l... With one pump and/or one water supply inoperable,.
restore the inoperable equipment to operable status within seven (7) days or prepare and submit a Report, to the Commission pursuant to Specification 6.9.2.b.
b.2.
With one water supply below the minimum specified limit for one'ay connect the spool piece to make the screen wash pump available for fire water supply.*
C ~
'With no Fire Protection Water System operable:
l.
Establish a backup within twenty-four 2.
Submit a Report in 6.9.2, e.
fire protection water system
'24)
- hours, and accordance with Specification 3.
FIRE HOSE STATIONS a ~
Fire hose stations in the vicinity of safety related equipment shall be operable at all times when the safety related equipment in their area of protection is required to be operable; or within eight (8) hours, an equivalent capacity fire hose shall be run from an equivalent water source to the inoperable location.
4.
PENETRATION FIRE BARRIERS a.. All electrical penetration fire barriers protecting.
safety related equipment shall be functional when safety related equipment in the area is required to.
. be operable; or within one (1) hour of the barrier being found not intact; a fire watch patrol shall inspect at least one side of the inoperable barrier at least once per hour, as operational conditions permit, until the affected penetration fire barrier is restored.'his specification becomes effective unon completion of the necessary
-modifications..These modlfication> to be completed no, later than December 1980.
Amendment No. 51, Unit 3
~
3.14-2
'mendment No. 42,, Unit 4 J