Text
~R RED
~o
Op
ClO
I
Op
~O
++*++
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
In Reply Refer To:
RII:PAT
50-250/79-30
50"251/79-30
OCT 1 7 879
Florida Power and Light Company
Attn:
R. E. Uhrig, Vice President
Advanced
Systems
and Technology
Post Office Box 529100
Miami, Florida
33152
Gentlemen:
This refers to the inspection
conducted
by P.
AD Taylor of this office on
September
24-28,
1979 of activities authorized by NRC License
Nos.
and
DPR-41 for the Turkey Point facility, and to the discussion of our findings held
with H. E. Yaeger at the conclusion of the inspection.
Areas
examined during the inspection
and our findings are discussed
in the
enclosed
inspection report.
Within these
areas,
the inspection consisted of
selective
examinations
of procedures
and representative
records,
interviews with
personnel,
and observations
by the inspectors.
Within the scope of this inspection,
no items of noncompliance
were disclosed.
We have
examined actions you have taken with regard to previously reported
unresolved
items.
The status of these
items is discussed
in the enclosed report.
Two new unresolved
items resulted
from this inspection
and are discussed
in the
enclosed report.
These
items will be examined during subsequent
inspections.
In accordance
with Section 2.790 of the NRC's "Rules of Practice",
Part 2,
Title 10,
Code of Federal Regulations,
a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document
Room. If this
report contains
any information that you (or your contractor) believe to be
proprietary, it is necessary
that you make
a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include
a full statement
of the reasons
on the basis of which
it is claimed that the information is proprietary,
and should be prepared
so
that proprietary information identified in the application is contained in a
separate
part of the document.
If we do not hear from you in this regard within
the specified period,
the report will be placed in the Public Document Room.
79113 00
OCT 17 1979
Florida Power and Light Company
Should you have
any questions
concerning this letter,
we will be glad to discuss
them with you.
Sincerely,
T. Sutherland,
Chief
Fuel Facility and Materials
Safety Branch
Enclosures:
Inspection Report Nos. 50-250/79-30
and 50-251/79-30
cc w/enclosures:
H. E. Yaeger, Plant Manager
Post Office Box 013100
Miami, Florida
33101