ML17339A255

From kanterella
Jump to navigation Jump to search
Confirms Commitment to Perform Periodic Insp of Piping Spool Pieces,As Required by IE Bulletin 79-03.One Third of Piping Sample Will Be Inspected at Each of Next Three Refueling Outages
ML17339A255
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 10/22/1979
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-79-03, IEB-79-3, NUDOCS 7911130137
Download: ML17339A255 (2)


Text

OX 52910 MIAMI, FL 315 VW FLORIOA POWER lL LIGHT COMPANY

3~:'726 nit: J7 October 22, 1979.

L-79-294 Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

Re: RII:JPO 50-250, 50-251 IE Bulletin 79-03 The purpose of this letter is to confirm our June 5, 1979 commitment'(L-79-154) to perform periodic inspections of piping spool pieces as required by IE Bulletin 79-03. One-third of the piping sample will be inspected at each of the next three refueling outages for each unit. The first inspection will be performed during the upcoming Turkey Point Unit 3 refueling outage scheduled to begin approximately November 20, 1979.

The inspection program used during each outage and the results of each inspection will be maintained at the Turkey Point site for review by your inspectors.

Very truly yours, M -3 ~--4"~~)

Robert E. Uhrig Vice President Advanced Systems & Technology REU/MAS/cph