ML17339A255
| ML17339A255 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 10/22/1979 |
| From: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-79-03, IEB-79-3, NUDOCS 7911130137 | |
| Download: ML17339A255 (2) | |
Text
OX 52910 MIAMI,FL 315
- 3~:'726 nit: J7 VW FLORIOA POWER lL LIGHTCOMPANY October 22, 1979.
L-79-294 Mr. James P. O'Reilly, Director, Region II Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303
Dear Mr. O'Reilly:
Re:
RII:JPO 50-250, 50-251 IE Bulletin 79-03 The purpose of this letter is to confirm our June 5, 1979 commitment'(L-79-154) to perform periodic inspections of piping spool pieces as required by IE Bulletin 79-03.
One-third of the piping sample will be inspected at each of the next three refueling outages for each unit.
The first inspection will be performed during the upcoming Turkey Point Unit 3 refueling outage scheduled to begin approximately November 20, 1979.
The inspection program used during each outage and the results of each inspection will be maintained at the Turkey Point site for review by your inspectors.
Very truly yours, M -3 ~--4"~~)
Robert E. Uhrig Vice President Advanced Systems
& Technology REU/MAS/cph
.cc:
Harold Reis, Esquire
~0
~gp ZFo~v 6
>>livaO'k8-g PEOPLE... SERVING PEOPLE
1