UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTAST., N.W., SUITE 3100
ATLANTA,GEORGIA 30303
Report Nos. 50-250/79-21
and 50-251/79-21
Licensee:
Florida Power
and Light Company
9250 West Flagler Street
Miami, Florida
33101
Facility Name:
Turkey Point Units 3 and
4
Docket Nos. 50-250
and 50-251
License Nos. DPR-31 and DPR-41',
f I
Meeting at
NRC Region II Office, Atlanta, Georgia
Attending Personnel:
See Details
Approved by:
W. A. Ruhlman, Acting Section Chief,'RONS
Meeting Conducted:
June 6,
1979
SUMMARY
Items Discussed
7g
D te Signed
The subject discussed
at this meeting
was the results of the Quality Assurance
inspection conducted
March 12-16 and 19-21,
1979.
DETAILS
1.
Personnel Attendin
Meetin
Florida Power
and Li ht
Com an
(FPL
E. A. Adomat, Executive Vice President
A. D. Uhrig, Vice President
C. 0. Woody, Manager of Power Resources
Nuclear
G. D. Whittier, Senior Engineer
J.
E. Vessley, Director of Quality Assurance
J.
W. Brown, Assistant Manger for QA Applications
Nuclear
Re ulator
Commission
(NRC)
J. P. O'Reilly, Directoi, Region
XX
R.
C,. Lewis, Acting Chief,'eactor
Operations
and Nuclear Support Branch
P. J. Kellogg, Acting Chief, R'eactor Prospects",Section
No.
3
W. A. Ruhlman, Acting Chief, Nuclear Support Section
No.
2
E. H. Verdery, Acting Chief, Reactor
Prospects
Section
No.
2
M. Grotenhuis,
Prospect
Manager of Turkey Point,
R. J. Vogt-Lowell, Reactor Inspector,
Reactor Projects
Section No.
2
2.
Summar
of Meetin
Held on-June
6
1979
Representatives
of Florida Power and Light Company met with Region IX and
NRR staff personnel at Atlanta, Georgia,
to discuss specific current areas
of concern.
The meeting
was held at the request of the NRC.
Sub]ectsdiscussed
involved the results of the Quality Assurance
Inspection
conducted
March 12-16 and
19-21,
1979, which is contained in Inspection
Report Nos ~ 50-250/79-11
and 50-251/79-11.
Specific concerns in the area
of management
control systems
and the implementation of those
systems
were highlighted
during the meeting~
The need for adequate
procedural
and administrative controls, generic application of corrective actions
implemented in deficient areas,
and timeliness in implementing corrective
actions
were stressed.
The FP&L representatives
were given presentations
by NRC staff members
from the Operations
Branch
These presentations'enerally
summarized
inspection findings at the Turkey Point Units
3 and
4 .facilities and
expounded
on the concerns identified above
The presentations
were given
informally, allowing FP&L representatives
the opportunity to discuss
any aspects
of the
NRC inspection findings and identified concerns.
r
FP&L representatives
acknowledged
the
NRC concerns
and indicated that
corrective action would be implemented in the areas identified.
f