Ack 790306 Request for Delay in Development of Inservice Insp Program Pending Decision on Proposed Changes to 10CFR50.55a.Delay Is Unacceptable
ML17338A848
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/16/1979
From: Schwencer A
Office of Nuclear Reactor Regulation
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
References
NUDOCS 7907130152
Download: ML17338A848 (4)


Text

Docket Nos.

0-250 and 50-

Dear Dr. Uhrig:

~y

] 6 1878

/

Dr. Robert E. Uhrig, Vice President.

Florida Power and Light Company Advanced Systems

. and Technology P ~ 0. Box 5291 00 Miami,,Florida 331 52 DISTRIBUTION Docket Files 50-250 and 50-251 NRC'DR ( 2)

Local'DR NRR Rdg ORBl Rdg V.. Stel lo B ~ Grimes R.

Vol 1 mer D ~

E is enhut T. J. Carter W. Russell A. Schwencer C ~ Parr ish N., Grotenhui s Attorney, (OELD)

I&E (3)

J.

Buchanan 4r

'ERA ACRS ( 1 6)

Your 1etter dated tlarch 6 ~

1 979 has requested a del ay in the development of the Turkey Point 3 Inservi ce Inspection

( ISI) program pending a

decision on proposed changes to 1 0 CFR 50. 55a.

He find it unacceptable to del ay the development of the Unit 3 program beyond the date required by 1 0 CFR. 50. 55a.

The timetable for appr oval of the, nevi edition and addenda of Section XI of the ASNE Boiler and Pressure Vessel Code-is uncertain.

The Turkey Point 3 ISI program should be implemented and FPL must meet the appl icabl e edition arid.addenda 'of Section XI as required by 1 0 CFR 50 ~ 55a.

Sincerelyg.

original Signed By cc:

See next page A. Schwencer, Chief Operating Reactors. Branch 01 Division of Operating Reactors GA DOR:

DOR:

~ ORRICC~

0 U RNAICCW DATC~

NGrotenhui s:j os(.k(V..........

ASch1 encer 0 SJ (k>.7.9.......

~

~

~ ~

~ ~ ~ ~

~ I ~ ~ ~ 0

~ ~ ~ ~

~

~

@BC PO&f 318 (9 76) NRCR 024O Q U,S OOVCIINMCNTRNINTINO ONNICCI 107 ~

CCC Tl~

P g P PI,

'1

/

~pg o

~'l

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Docket Nos.

50-250 and 50-251 May 16, 1979 Dr. Robert E. Uhrig, Vice President Florida Power and Light Company Advanced Systems and Technology P.

0.

Box 529100 Miami, Florida 33152 Deat Dr. Uhrig:

Your letter dated March 6, 1979 has requested,a delay in the development of the Turkey Point 3 Inservice Inspection (ISI) program pending a

decision on proposed changes to 10 CFR 50.55a.

Me find it unacceptable to delay the development of the Unit 3 program beyond the date required by 10 CFR 50..55a.

The timetable for approval of the new edition and addenda of Section XI of the ASME Boiler and Pressure Vessel Code is uncertain.

The Turkey Point 3 ISI program should be implemented and FPL must meet the applicable edition and addenda of Section XI as required by 10 CFR 50.55a.

Sincerely, cc:

See next page A. Schwencer, Chief Operating Reactors Branch bl Division of Operating Reactors

Robert E. Uhrig Florida Power and Light Company May 16, 1979 cc:

Mr. Robert Lowenstein, Esquire Lowenstein,

Newman, Reis and Axelrad 1025 Connecticut
Avenue, N.W.

Suite 1214 Washington, D. C.

20036 Environmental and Urban Affairs Library Florida International University Miami, Florida 33199 Mr. Norman A. Coll, Esquire

Steel, Hector and Davis 1400 Southeast First National Bank Building Miami, Florida 33131 Mr. Henry Yaeger, Plant Manager

,Turkey 'Point Plant Florida Power and Light Company

. P. 0.