ML17338A808

From kanterella
Jump to navigation Jump to search

NRR E-mail Capture - DC Cook Unit Nos. 1 and 2: Acceptance Review for License Amendment Request Related to the Technical Support Center
ML17338A808
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/01/2017
From: Jennivine Rankin
Plant Licensing Branch III
To: Kish H
Indiana & Michigan Electric Co
References
L-2017-LLA-0375
Download: ML17338A808 (3)


Text

NRR-DMPSPEm Resource From: Rankin, Jennivine Sent: Friday, December 01, 2017 11:22 AM To: 'Helen L Kish'

Subject:

DC Cook Unit Nos. 1 and 2: Acceptance Review for License Amendment Request Related to the Technical Support Center (EPID L-2017-LLA-0375)

Mrs. Kish, By letter dated November 1, 2017 (Agencywide Documents Access and Management System Accession No. ML17317A454), Indiana Michigan Power Company (the licensee), submitted a license amendment request for Donald C. Cook Nuclear Plant (CNP), Unit Nos. 1 and 2. The proposed amendment would move the Technical Support Center to a different location in a new facility.

The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this amendment request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license must fully describe the changes requested, and following as far as applicable, the form prescribed for original application. Section 50.34 of 10 CFR addresses the content of technical information required. This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the NRC staff to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact the NRC staffs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, you will be advised by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 260 hours10.833 days <br />1.548 weeks <br />0.356 months <br /> to complete. The NRC staff expects to complete this review by your request date of October 2018.

If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, I will communicate the reasons for the changes, along with the new estimates during our routine interactions.

These estimates are based on the staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review.

If you have any questions, please contact me at (301) 415-1530.

Thanks, Jennie 1

Jennie Rankin, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation 2

Hearing Identifier: NRR_DMPS Email Number: 21 Mail Envelope Properties (SN6PR0901MB2445DF623DDA91AA173E3FE598390)

Subject:

DC Cook Unit Nos. 1 and 2: Acceptance Review for License Amendment Request Related to the Technical Support Center (EPID L-2017-LLA-0375)

Sent Date: 12/1/2017 11:22:21 AM Received Date: 12/1/2017 11:22:22 AM From: Rankin, Jennivine Created By: Jennivine.Rankin@nrc.gov Recipients:

"'Helen L Kish'" <hlkish@aep.com>

Tracking Status: None Post Office: SN6PR0901MB2445.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3145 12/1/2017 11:22:22 AM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:

Recipients Received: