ML17338A784

From kanterella
Jump to navigation Jump to search
Amends 48 & 40 to Licenses DPR-31 & DPR-41,respectively, Revising Tech Specs to Require Actuation of Safety Injection Based on Two of Three Channels of Low Pressurizer Pressure
ML17338A784
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 05/04/1979
From: Schwencer A
Office of Nuclear Reactor Regulation
To:
Shared Package
ML17338A785 List:
References
NUDOCS 7906250395
Download: ML17338A784 (11)


Text

AE00 c+

+0 Po

+ww*~

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-250 TURKEY POINT NUCLEAR GENERATING UNIT NO.

3 AMENDMENT TO FACILITY OPERATING'ICENSE

~

~

~

Amendment No.

48 License No.

DPR-31 1.

The Nuclear Regulatory Commission (the Commission) has Tound that:

A.

The application for amendment by Florida Power and Light Company (the licensee) dated May 2, 1979, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 3.8 of the Facility Operating License No.

DPR-31 is hereby amended to read as foIlows:

va 0635 o spy

~

I 5

~

I!II'I'(

B)

Technical S ec ific at ions The Technical Specifications contained in Appendices A

and B, as revised through Amendment No.

48, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications."

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION ttttttt~ ~I

Attachment:

Changes to the Technical Specifications Date of Issuance:

>>y <

I

.C'IZ~C(/le~~'~8~'"

A. Schwencer, Chief Operating Reactors Branch 81'ivision of Operating Reactors IIIIIIIIII,

~

~

1 ATTACHMENT TO LICENSE AMENDMENT NOS. 48 AND 40 FACILITY OPERATING LICENSE NOS.

DPR-31 AND DPR-41 DOCKET NOS.

50-250 AND 50-251 Replace the following pages of the Appendix "A" and "B" Technical Specifications with the enclosed pages.

The revised page is identified by amendment number and contains vertical lines indicating the area of change.

I

~

0 ~

Table 3.5-2 Table 3.5-4

TABLE 3.5-4 ENGINEERED SAFETY FEATURE SET POINTS iVO.

FUNCTIONAL UNTT CHANNEL ACTION SET POINT 1.

High Containment Pressure Safety Injection Containment Spray

  • Steam Line Isolation
  • Containment Isolation
  • 6 psig 2.

3.

High-High Containment Pressure Pressurizer Low Pressure See No.

1 Safety Inject/on

< 30 psig

> 1715 psig 4 ~

5.

High Steam Line Differential Pressure (2/3 between any header and any line)

High Steam Line Flow (2/3 lines)

Safety Injection Safety Injection Steam Line Isolation

< 150 psi d/p for 3.84'10 6 lb/hr, 770 psig, 100%

RP:::.

d/p for 0.64'10 6 lb/hr, 1005 psig, 0%

RP Coincident with:

Low S team Line Pressure, Or Low Tavg.

d/p linear with 1st stg. press.,

0-100%

RP

> 600 psig

> 531 F

  • High and High-High coincident'mendment No.

48 Unit No.

3 Amendment No, 40 Unit No.

4

TABLE 3.5-2 ENGINEERED SAFETY FEATURES ACTUATION NO.

FUNCTIONAL UNIT 1.

SAFETY INJECTION 1.1 Manual 1.2 High Containment Pressure 1.3 High Differential Pressure between any Steam Line and the Steam Line Header 1.4 Pressurizer Low Pressure MIN.

OPERABLE CHANNELS 2

MIN.

DEGREE OF REDUN-DANCY 0

OPERATOR ACTION IF CONDITIONS OF::,

COLUMN 1 OR 2 CAVNOT BE MET Cold Shutdown Cold Shutdown Cold Shutdown 1.5 High Steam Flow in 2/3 Steam Lines with Low Ta~g or Low Steam Line Pressure, 1/line in 1

each of 2

lines Cold Shutdown Cold Shutdown 2.

CONTAINMENT SPRAY 2.1 High Containment Pressure and High-High Containment Pressure (Coincident) 2 per set 1/set Cold Shutdown This signal may be manually bypassed, when the reactor is shut down and pressure is below 2000 psig Amendment No.

48 Unit No.

3 Amendment No. 40 Unit No.

4

g~< ~<Cy 0

n ~+*<<+

UNITED STATES NUCLEAR REGVLATORYCOMMISSION WASHINGTON, D. C. 20555 FLORIDA POWER AND LIGHT COMPANY DOCKET NO. 50-251 TURKEY POINT NUCLEAR GENERATING UNIT NO.

4 AMENDMENT TO FACILITY OPERATING LICENSE I

~ ~ 4 Amendment No. 40 License No.

DPR-41 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Florida Power and Light

'ompany (the licensee) dated May 2,

1979, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the application, the provisions of the Act, and ihe rules and regulations of the Commission; C.

There 'is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR

.Part 51 of the ComIission's regulations and all applicable,.

requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicsted in the attachment to this license amendment, and paragraph 3.

B of the Facility Operating License No.

DPR-41 is hereby amended to read as follows:

4

~

~

pE

0

"{B)

Technical S ecifications The Technical Specifications contained in Appendices A

and B, as revised through Amendment No.

40, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications."

3.

This license amendment is effective as of the date of its issuance.

~ ~

Attachment:

Changes to the Technical Specifications Date of Issuance:

May 4, 1979 FOR THE NUCLEAR REGULATORY COMMISSION

)

A. Schwencer, Chief Operating Reactors Branch

-..1 Division of Operating Reactors

0 I

~ 'I