ML17338A510

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-250/78-32 & 50-251/78-32 on 781219-21.No Noncompliance Noted
ML17338A510
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 01/10/1979
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17338A511 List:
References
NUDOCS 7903060391
Download: ML17338A510 (3)


See also: IR 05000250/1978032

Text

<j,4 4Egy

P0

Cy

+**4+

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30303

JAN 1 0 lg7g

In Reply Refer To:

RII:EHV

50-250/78-32

50-251/78-32

Florida Power and Light Company

Advanced

Systems

and Technology

ATTN:

Dr. R. E. Uhrig, Vice President

Post Office Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by Mrs E.

H. Verdery of this

office on December

19-21,

1978 of activities authorized

by NRC License

Nos.

DPR-31

and DPR-41 for the Turkey Point, Units

3 and

4 facilities,

and to the discussion of our findings held with Mr. H. -E. Yaeger at the

conclusion of the inspection.

Areas

examined during'he inspection

and our findings are discussed

in

the enclosed

inspection report.

Within these

areas,

the inspection

consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were

disclosed.

We have

examined actions

you have taken with regard to previously reported

unresolved

items.

The status

of these

items is discussed

in the enclosed

report.

One

new unresolved

item resulted

from this inspection

and is discussed

in the enclosed

report.

This item will be examined during subsequent

inspections.

In accordance

with Section

2.790 of the NRC's "Rules of Practice",

Part 2, Title 10,

Code of Federal Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public

Document

Room.

If this report contains

any information that you (or

your contractor) believe to be proprietary, it is necessary

that you

make

a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

include

a full statement

of the reasons

on the basis of which it is

claimed that the information is proprietary,

and should

be prepared

so

that proprietary info'rmation identified in the application is contained

in a separate

part of the document.

If we do not hear

from you in this

.

regard within the specified period,

the report will be placed in the

Public Document

Room.

'

k

gg%,1

i>

Florida Power

and

Light Company

"2-

.JAN ]

0 ~gyp

Should you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

F. J.

Long, Chief

Reactor Operations

and

Nuclear Support Branch

Enclosures:

Inspection Report Nos. 50-259/78-32

and 50-251/78-32

cc w/enclosures:

Mr. H. E. Yaeger,

Plant Manager

Turkey Point Plant

Post Office Box 013100

9250 West Flagler Street

Miami, Florida

33101