Forwards IE Insp Repts 50-250/78-28 & 50-251/78-28.No Noncompliance Noted
ML17338A439
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 12/12/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17338A440 List:
References
NUDOCS 7901180309
Download: ML17338A439 (4)


See also: IR 05000250/1978028

Text

~p,S 4Egy

(4

.:-"

X(,-=J":.

+r

Qv

In Reply Refer To:

RII:RVL

50-250/78-28

50"251/78-28

UNITE D STATE S

NUCLEAR REGULATORY CO41hnlSSION

REGION II

101 MAR I ET TA STREE ~, N.W.

ATLANTA,GEORGIA 30303

DEC 1 2

1978

Florida Power

and Light Company

Advanced

Systems

and Technology

ATTN:

Dr. R.

E. Uhrig, Vice President

Post Office Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by Mr. R. Vogt-Lowell of this

office on November 20-22 and 24,

1978 of activities authorized

by NRC

License

Nos.

DPR-31

and

DPR-41 for the Turkey Point facilities, Units

3

and 4,

and to the discussion of our findings held with Mr. H. Yaeger at

the conclusion of the inspection.

Areas

examined

during the inspection

and our findings are discussed

in

the enclosed

inspection report.

Within these

areas,

the inspection

consisted

of selective

examinations

of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

In accordance

with Section

2.790 of the NRC's "Rules of Practice",

Part

2, Title 10, Code'f Federal Regulations,

a copy of this letter and

the enclosed

inspection report will be placed in the NRC's Public

Document

Room.

If this report contains

any information that you (or

your contractor) believe to be proprietary, it is necessary

that you

make

a written application within 20 days to this office to withhold

'uch

information from public disclosure.

Any such application

must

include

a full statement

of the

reasons

on the basis of which it, is

claimed that the information is proprietary,

and should

be prepared

so

that proprietary information identified in the application is contained

in

a separate

part of the document.

If we do not hear

from you in this

regard within the specified period,

the report will be placed

in the

Public Document.

Room.

~ >gpss~

Florida Power

and Light Company

-2-

Should you have

any questions

concerning this letter,

we will .be glad to

discuss

them with you.

Sincerely,

F. J.

Long, Chief

Reactor Operations

and

Nucle'ar Support

Branch

Enclosures:

Inspection Report Nos. 50-250/78-28

and 50-251/78-28

cc w/enclosures:

Mr. H. E. Yaeger,

Plant Manager

Turkey Point Plant

Post Office Box 013100

9250 West Flagler Street

Miami, Florida

33101