ML17338A439
| ML17338A439 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 12/12/1978 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Robert E. Uhrig FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17338A440 | List: |
| References | |
| NUDOCS 7901180309 | |
| Download: ML17338A439 (4) | |
See also: IR 05000250/1978028
Text
~p,S 4Egy
(4
.:-"
X(,-=J":.
+r
Qv
In Reply Refer To:
RII:RVL
50-250/78-28
50"251/78-28
UNITE D STATE S
NUCLEAR REGULATORY CO41hnlSSION
REGION II
ATLANTA,GEORGIA 30303
DEC 1 2
1978
Florida Power
and Light Company
Advanced
Systems
and Technology
ATTN:
Dr. R.
E. Uhrig, Vice President
Post Office Box 529100
Miami, Florida
33152
Gentlemen:
This refers to the inspection
conducted
by Mr. R. Vogt-Lowell of this
office on November 20-22 and 24,
1978 of activities authorized
by NRC
License
Nos.
and
DPR-41 for the Turkey Point facilities, Units
3
and 4,
and to the discussion of our findings held with Mr. H. Yaeger at
the conclusion of the inspection.
Areas
examined
during the inspection
and our findings are discussed
in
the enclosed
inspection report.
Within these
areas,
the inspection
consisted
of selective
examinations
of procedures
and representative
records,
interviews with personnel,
and observations
by the inspector.
In accordance
with Section
2.790 of the NRC's "Rules of Practice",
Part
2, Title 10, Code'f Federal Regulations,
a copy of this letter and
the enclosed
inspection report will be placed in the NRC's Public
Document
Room.
If this report contains
any information that you (or
your contractor) believe to be proprietary, it is necessary
that you
make
a written application within 20 days to this office to withhold
'uch
information from public disclosure.
Any such application
must
include
a full statement
of the
reasons
on the basis of which it, is
claimed that the information is proprietary,
and should
be prepared
so
that proprietary information identified in the application is contained
in
a separate
part of the document.
If we do not hear
from you in this
regard within the specified period,
the report will be placed
in the
Public Document.
Room.
~ >gpss~
Florida Power
and Light Company
-2-
Should you have
any questions
concerning this letter,
we will .be glad to
discuss
them with you.
Sincerely,
F. J.
Long, Chief
Reactor Operations
and
Nucle'ar Support
Branch
Enclosures:
Inspection Report Nos. 50-250/78-28
and 50-251/78-28
cc w/enclosures:
Mr. H. E. Yaeger,
Plant Manager
Turkey Point Plant
Post Office Box 013100
9250 West Flagler Street
Miami, Florida
33101