Forwards IE Inspec Repts 50-250/78-24 & 50-251/78-24 on 781018-19 During Which No Items of Noncompliance Were Noted
ML17338A382
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 11/22/1978
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17338A380 List:
References
NUDOCS 7812210071
Download: ML17338A382 (2)


See also: IR 05000250/1978024

Text

A.n

'+n

~O

>>>>*<<~

eply Refer To:

RII:GTG

50-250/78-24

and

50-251/78"24

REGION II

10I MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30303

NOY 2 p 1978

Florida Power and Light Company

Advanced Systems

and Technology

ATTN:

Dr. R. E. Uhrig, Vice President

Post Office Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by Mr.

G. T. Gibson of this office on

October

18-19,

1978, of activities authorized

by NRC License

Nos.

DPR-31

and

DPR-41 for the Turkey Point facility, Units

3 and 4,

and to the discussion of

our findings held with Mr. H. Yaeger at the conclusion of the inspection.

A eas

examined

during the inspection

and our findings are

discussed

in the

r

enclosed

inspection

report.

Within these

areas,

the inspection consisted

o

d f

selective

examinations

of procedures

and representative

records,

interviews

with personnel,

and observations

by the inspector.

Within the scope of this inspection,

no items of noncompliance

were disclosed.

We have

examined

actions

you have

taken with regard

to previously reported

unresolved

items.

The status

of these

items is discussed

in the enclosed

report.

Two new unresolved

items resulted

from this inspection

and are discussed

in

the enclosed

report.

These

items will be examined during subsequent

inspec-

tions,

As discussed, with Messrs.

H.

Yaeger

and J.

Hays

on November 3,

1978,

we understand

that Florida Power and Light is committed to conduct an additional

fire drill and

an additional on-site

emergency

exercise

on or before March 1,

1979, to test the effectiveness

of the measures

taken to correct the unresolved

items identified.

In accordance

with Section 2.790 of the

NRC's

"Rules of Practice",

Part 2,

~

Title 10,

Code of Federal Regulations,

a copy of this letter and the enclosed

inspe i

'nspection

report will be placed in the NRC's Public Document

Room. If this

report contains

any information that

you (or your contractor) believe to be

proprietary, it is

necessary

that

you

make

a written application within

20 days

to this office to withhold such information from public disclosure.

Any such application

must include

a full statement

of the

reasons

on the

basis of which it is claimed that the information is proprietary,

and should

'I 8122 100 t)

NOV 8 2 878

Florida Power and Light Company

P

-2-

be prepared

so that proprietary information identified in the application is

contained in a separate

part of the document.

If we do not hear

from you in

this regard within the specified period,

the report will be placed in the

Public Document Room.

Should

you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

c.~M ~

r

Jack T. Sutherland,

Chief

Fuel Facility and Materials

Safety Branch

Enclosures:

Inspection Report Nos. 50-250/78-24

and

50-251/78-24

cc w/enclosures:

M'r .

H. E. Yaeger,

Plant Manager

Turkey Point Plant

Post Office Box 013100

9250 West Flagler Street

Miami, Florida

33101