Forwards IE Inspec Rept(S) 50-250/78-18 & 50-251/78-18 on 780822-25 During Which No Items of Noncompliance Were Noted
ML17338A266
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 09/29/1978
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
Shared Package
ML17338A265 List:
References
780923, NUDOCS 7811070314
Download: ML17338A266 (3)


See also: IR 05000250/1978018

Text

sP

ggR REC0~

gl ~=

<<*g*>>

In Reply Refer To:

RII:EHU

50-250/78-18

50-251/78-18

UNITE0 STATE S

NUCLEAR REGULATORY COMMISSION

REGION II

230 PEACHTREE STREET. N.W. SUITE 1217

ATLANTA,GEORGIA 30303

SEP

2 9 1978

Florida Power

and Light Company

Advanced

Systems

and Technology

Attn:

Dr. R.

E. Uhrig, Uice President

P. 0.

Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection

conducted

by Mr. E. H. Uerdery of this

office on August 22-25,

1978, of activities authorized

by NRC Operating

License

Nos=.

DPR-31

and DPR-41 for the Turkey Point

3 and

4 facilities,

and to the discussion of our findings held with Mr. H. E. Yeager at the

conclusion of the inspection.

Areas

examined during the inspection

and our findings are discussed

in

the enclosed

inspection report.

Vithin these

areas,

the inspection

consisted

of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observations

by the inspector.

Vithin the scope of this inspection,

no items of noncompliance

were

disclosed.

We have examined actions

you have taken with regard to previously

identified enforcement matters

and unresolved

items.

The status of

these

items is discussed

in the enclosed

report.

In accordance

with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title 10,

Code of Federal Regulations,

a copy of this letter

and the enclosed

inspection report will be placed in the NRC's Public

Document

Room. If this report contains

any information that you (or

your contractor) believe to be proprietary, it is necessary

that you

make

a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

include

a full statement

of the reasons

on the basis of which it is

claimed that the information is proprietary,

and should be prepared

so that proprietary information identified in the application is

contained in a separate

part of the document.

If we do not hear

from you in this regard within the specified period, the report

will be placed in the Public Document

Room.

pg~~o'p

031 't

"v4

\\

'

Florida Power and Light Company

SEP

2 9 >S>e

Should you have any questions

concerning this letter,

we will be glad to

discuss

them with you.

Enclosure:

RII Inspection Report Ão.

50-250/78-18

50-251/78-18

cc w/encl:

Mr. H. E. Yaeger, Plant Manager

Turkey Point Plant

P. 0. Box Ol3100

9250 West F'agler Street

Miami, Florida

3310l

F. J. Long, Chief

Reactor Operations

and Nuclear

Support Branch