Forwards IE Inspec Repts 50-250/78-11 & 50-251/78-11 on 780619-23 & Notice of Violation
ML17338A256
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 08/11/1978
From: Sutherland J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
FLORIDA POWER & LIGHT CO.
Shared Package
ML17338A254 List:
References
NUDOCS 7811030171
Download: ML17338A256 (2)


See also: IR 05000250/1978011

Text

~gS RECggi

c~

Opo

Cy

0 ~

+i~ +***+

In Reply Refer To:

RII:GLT

50"250/78-11

50-251/78-11

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

230 PEACHTREE STREET, N.W. SUITE 1217

ATLANTA,GEORGIA 30303

AUG l l $78

Florida Power and Light Company

Advanced

Systems

and Technology

Attn:

Dr. R. E. Uhrig, Vice President

P. 0.

Box 529100

Miami, Florida

33152

Gentlemen:

This refers to the inspection conducted by Mr.

G ~ L. Troup of this office on

June

19-23,

1978, of activities authorized

by

NRC Operating

License

Nos.

DPR-31

and DPR-41 for the Turkey Point Units 3 and 4 facilities, and to the

discussion of our findings held with Mr. H. E. Yaeger at the conclusion of

the inspection.

Areas examined during the inspection

and our findings are discussed

in the

enclosed inspection report.

Within these areas,

the inspection consisted of

selective

examinations of procedures

and representative

records, interviews

with personnel,

and observations

by the inspectors.

We have examined actions you have taken with regard to previously identified

enforcement

matters

and

unresolved

items.

The status

of these

items is

discussed in the enclosed report.

During the

inspection, it was

found that certain activities

under

your

license

appear

to be in noncompliance

with NRC requirements.

These

items

and

references

to pertinent

requirements

are

listed in the

Notice

of

Violation enclosed

herewith

as

Appendix A.

This notice is

sent

to you

pursuant

to

the

provisions

of

Section 2.201

of

the

NRC's

"Rules

of

Practice,"

Part 2, Title 10,

Code of Federal

Regulations.

Section 2.201

requires

you to submit to this office, within 20 days of your receipt of

this notice,

a written statement

or explanation in reply including:

(l)

corrective steps

which have been taken by you and the results achieved;

(2)

corrective steps which willbe taken to avoid further noncompliance;

and (3)

the date when full compliance willbe achieved.

In accordance

with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10,

Code

of Federal

Regulations,

a

copy of this letter

and

the

enclosed

inspection report will be placed in the NRC's Public Document Room.

If this report contains

any information that you (or your contractor)

~

~

AUG 11

1978

Florida Power and Light Company

-2-

believed

to

be proprietary, it is

necessary

that

you

make

a written

application within 20 days to this office to withhold such information from

public disclosure.

Any such application

must include

a full statement

of

the

reasons

on the basis

of which it is claimed that the information is

proprietary,

and

should

be

prepared

so

that

proprietary

information

identified in the

application

is

contained

in

a

separate

part of the

document.

If we

do not hear

from you in this regard within the specified

period, the report will be placed in the Public Document Room.

Should

you have

any questions

concerning this letter,

we will be glad to

discuss

them with you.

Sincerely,

J. T. Sutherland,

Chief

Fuel Facility and Materials

Safety Branch

Enclosures:

l.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-250/78-ll

and 50-251/78-11

cc w/encl:

Mr. H. E. Yaeger, Plant Manager

Turkey Point Plant

P. 0. Box 13100

9250 West Flagler Street

Miami, Florida

33101