L-78-332, Forwards fifth-yr Surveillance Rept Re Containment Structure post-tensioning Sys.Minor Error in third-yr Surveillance Rept,Submitted by ,Corrected

From kanterella
(Redirected from ML17338A208)
Jump to navigation Jump to search
Forwards fifth-yr Surveillance Rept Re Containment Structure post-tensioning Sys.Minor Error in third-yr Surveillance Rept,Submitted by ,Corrected
ML17338A208
Person / Time
Site: Turkey Point NextEra Energy icon.png
Issue date: 10/10/1978
From: Robert E. Uhrig
FLORIDA POWER & LIGHT CO.
To: Stello V
Office of Nuclear Reactor Regulation
Shared Package
ML17338A209 List:
References
L-78-332, NUDOCS 7810170191
Download: ML17338A208 (4)


Text

f REGULA Y INFORMATION Q

DOCKET NBR: 050-251 Turke Pt 4

R:

IPIENT-Stello V.

ORIGINATOR= Uhri R.E.

COMPANY:

Fl Pwr 6 Li ht DISTRIBUTI SYSTEM DOC DATE:

ACCESSION NBR: 78101 0

COPIES RECEIVED:

LTR 3

~ ENCL 3

SUBJECT:

SIZE-3 + 89 Fifth Year Surveillance Re t of containment struct ost-tensionin s s.

Concludes 'that s

s is erformin w in limits set b

desi n criteria specs.

Includes wire testin

& anal sis of sheath filler.

I DISTR~BUTTON CODE>

ADO1

, DISTRI'BUNION TITLEl

~

'"GENERAL DISTRIBUTION FOR AFTER ISSUANCE" OF" OPERATING LICENSE'y M

4 NAME II

" BR NRC PAR I

8 E

OELD

'ANAUER CORE PERFORMANCE AD FOR SYS a PR>>

ENGINEERING BR REACTOR,SAFETY

<<'LANT SYSTEMS

'EER EFFLUENT TREAT'SYS J

MCQQUGH

'POR TERA NSIC

, ACRS ENCL?

W ENCL'/ENCL W/p ENCL'TR ARLY W/ENCL w/ENCL W/ENCL W/ENCL H/ENCL W/ENCL W/ENCL W/ENCL w/ENCL W/ENCL w/ENCL W/ENCL W/1b ENCL FOR ACTION I

RR8 1 BC TOTAL NUMBER OF COP IES REQUIRED j

-LTR ENCL E

~

NOTES ocr is 878 1

qt 1

\\

I

P. O. BOX 013100, MIAMI, FL 33101

~ghl Ib~

Direct.or of Nuclear Reactor Regulation Attention:

Nr. Vict:or Stello, Director Division of Operating Reactors U.

S. Nuclear R gulatory Commission Nashingtor, D. C.

20555 FLORIDAPOWER & LIGHTCOMPANY October 10, 1978 L-78-332

Dear Ikr. Stello:

Re.

Turkey Point Unit No.4 Docket: No. 50-251 Containment St:ructur Post-Tensioning System Enclosed is t:he subject report prepared for us by our architect: engineer.

Twen y (20} copies are transmitted herewith pursuant to Technical. Spec'fication 6.9.3.

Additionally, our review of the Fifth Year Surveillance Report has indica"ed a minor error in the Third Year Surveillance Report which was submitted by lett:er dated August 25, 1975 (L-75-404).

Twenty (20) copies of the two revised pages of the Third Year Surveillance Report are enclosed.

Very truly yours, Robert E. Uhrig Vice President RHtJ/NAK/dep Attachment cc:

Fr.

James P. O'Reilly, Pegion T1 Robert Lowenstein, Esquire'EOPLE...

SERVING PEOPLE

~; r r

1