ML17336A022
| ML17336A022 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 03/23/1982 |
| From: | J. J. Barton GENERAL PUBLIC UTILITIES CORP. |
| To: | Snyder B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML17336A023 | List: |
| References | |
| 4400-82-L-0043, 4400-82-L-43, NUDOCS 8203290209 | |
| Download: ML17336A022 (4) | |
Text
s!
RFGULATORY
<FORMATION DISTRIBUTION S EM (RIDS)
CCESSION NBR:8203290209 DOC ~ DATE: 82/03/29 NOTARIZED:
NO FACIL:50-320 Three Mi l e Island Nuclear Stations Uni t 2E Metropol i t AUTH INANE AUTHOR AFFILIATION BARTON'.J ~
General Public Utili ties -<<GPU Service Corp.
RECIP.NAME 'ECIPIENT AFFILIATION SNYDERPB ~ J ~
TMI Pr ogram Offi ce DOCKET 05000320
SUBJECT:
Forwards "Reactor Coolant Processing Plani" which Tserves as App 1 to "Submerged Demineralizer Sys Technical Evaluation Rept."
g~(i DISTRIBUTION CODE ~ A001S, COPIES RECEIVED LTR
'NCL SI E
l z:- L+.
'ITLE: General Distribution for after Issuance of Operating License NOTES:1 cy:B Snyder<L BarrettEHellerEO Lynch<Br Chief ~
LQBER Lo, 05000320 RECIPIENT ID CODE/NAME BC 01 INTERNAL: ELD NRR/DHFS DEPY08 ORAB REG FIL EXTERNAL: ACRS 09 NRC PDR 02 NTIS COPIES LTTR ENCL 13 13 1
0 1
1 1
0 1
1 10 10 1
1 1
1 RECIPIENT ID CODE/NAME IE NRR/DL DIR NRR/DS I/RAB RGN1 LPDR NSIC 06 03 05 COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 Vj TOTAL NUMBER OF COPIES REOUIREO:
LTTR g
ENCL
I D
I I
I t
, ~
II II tl, Ib
NueleaI GPU Nuclear P.O. Box 480 Middletown, Pennsylvania 17057 717-944-7621 Writer's Direct Dial Number:
TMI Program Office Attn:
Dr. B. J.
- Snyder, Program Director U.
S. Nuclear Regulatory Commission Washington, D.C.
20555 March 23, 1982 4400-82-L-0043 9
M~~ 'tr~+
Bf to C
Dear Sir:
Three Mile Island Nuclear Station, Unit 2 (TMI-2)
Operating License No. DPR-73 Docket No. 50-320 Reactor Coolant Processing Plan Attached for your information and use is the Reactor Coolant Processing Plan which serves as an Addendum to the Submerged Demineralizer System (SDS) Technical Evaluation Report for the processing of Reactor Coolant System (RCS) water.
This plan was prepared-in response to the NRC order of June 18, 1981 which, in part, directed the processing of RCS water and it~)falls within the scope of the SDS Safety Evaluation Report.
- Thus, with the exception of changes to some RCS Chemistry Specifications detailed in the Recovery Operations Plan and approval of the procedures needed to process RCS water pursuant to Technical Specification 6.8.2, formal NRC approval for the processing of RCS water has already been granted.
If,
- however, you have any questions on the attached
- document, please contact Mr. J.
E. Larson of my staff.
To support the changes to the RCS chemistry referred to above, a Recovery Operations Plan Change Request is being developed.
The anticipated submittal for the Recovery Operations Plan Change Request is April 19, 1982.
S c
ly, J.
A J
rton n
Director, TMI-2 JJB JJB:djb Attachment cc:
L. H. Barrett, Deputy Program Director, TMI Program Office ceo~~"CO 0~o" IlR p9 8QO 20 l
R
@DOG PD GPU Nuclear is a part of the General Public Utilities System ftIm/.
S lr
0