ML17335A513

From kanterella
Jump to navigation Jump to search
Forwards LER 99-001-00 Re Discovery That GE Hfa Relays Installed in EDGs May Not Meet Seismic Qualification. Commitments Made by Util Listed
Date released: 05/31/2018 Download: ML17335A513


LER 99-001-00:on 990106,noted That GE Hfa Relays Installed in EDGs May Not Meet Seismic Qualification.Caused by Operating Experience Info Incorrectly Dispositioned in 1985. Updated LER Will Be Submitted by 990405
ML17335A514
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/10/1999
From: Pogue B
AMERICAN ELECTRIC POWER CO., INC.
To:
References
Download: ML17335A514 (4)
Forwards LER 99-001-00 Re Discovery That GE Hfa Relays Installed in EDGs May Not Meet Seismic Qualification. Commitments Made by Util Listed
ML17335A512
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/10/1999
From: Sampson J
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML17335A512 (3)