Forwards LER 99-001-00 Re Discovery That GE Hfa Relays Installed in EDGs May Not Meet Seismic Qualification. Commitments Made by Util Listed
ML17335A512
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 02/10/1999
From: Sampson J
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17335A513 List:
References
NUDOCS 9902220015
Download: ML17335A512 (3)


Text

CATEGORY 1

~

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9902220015 DOC.DATE: 99/02/10 NOTARIZED: NO DOCKET ¹ FACIL:50-315 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 ASH.NAME, AUTHOR AFFILIATION SAMPSON,J.R. American Electric Power Co., Inc.

RECIP.NAME RECIPIENT AFFILIATION Records Management Branch (Document Control Desk)

SUBJECT:

Forwards LER 99-001-00 re discovery that GE HFA relays installed in EDGs may not meet seismic qualification.

Commitments made by util, listed.

DISTRIBUTION CODE: IE22T COPIES RECEIVED:LTR 1 ENCL SIZE: +Q TITLE: 50.73/50.9 Licensee Event Report (LER), IncidentJ Rpt, etc.

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 PD 1 1 STANG,J 1 1 INTERNAL: AEO 2 2 AEOD/SPD/RRAB 1 1 1 1 NRR/DRCH/HOHB 1 1 NRR/DRCH/HQMB 1 .1 NRR/DRPM/PECB 1 1 NRR/DSSA/SPLB 1 1 RES/DET/EIB 1 1 RGN3 FILE 01 1 1 EXTERNAL: L ST LOBBY WARD 1 1 LITCO BRYCE,J H 1 1 NOAC POORE,W. 1 NOAC QUEENER,DS 1 1 NRC PDR 1 1 NUDOCS FULL TXT 1 . 1 G

'NOTE TO ALL URIDSM RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROl DESK (DCD) ON EXTENSION 415-2083 FULL TEXT CONVERSION REQUIRED TOTAL NUMBER OF COPIES REQUIRED: LTTR 18 ENCL 18'

American Elecirlc Cook Nudear ilare One Cook PLaoe

~

Bridgnan, hrr 49106'164655901 Z

AMERICAN ELECTRIC PCWVER February 10, 1999 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

~

Operating License DPR-58 Docket No. 50-315 Document Control Manager:

In accordance with the criteria established by 10 CFR 50.73 entitled Licensee Event ill b i bill LER 315/99-001-00, "General Electric HFA Relays Installed in Emergency Diesel .

Generators May Not Meet Seismic Qualification."

The following commitments have been identified in this submittal:

~ Upon completion of the HFA relay inspection, those relays that are determined to be non-compliant with vendor specifications will be evaluated for seismic performance.

~ Design changes to the nine EDG relays identified will be implemented prior to the EDGs being declared operable.

~ Additional evaluations are required for, the effect on equipment in other plant operating modes.

~ Results of the root cause investigation will be provided in an update to this LER, including information regarding additional corrective actions and/or preventive actions.

Sincerely, J. R. Sampson Site Vice President