| | | Reporting criterion |
|---|
| 05000315/LER-1998-001, :on 980104,containment Air Recirculation Sys Flow Testing Results Indicated Condition Outside Design Basis.Caused by Mispositioned Valve Actuator.Corrected Actuator to Valve Orientation |
- on 980104,containment Air Recirculation Sys Flow Testing Results Indicated Condition Outside Design Basis.Caused by Mispositioned Valve Actuator.Corrected Actuator to Valve Orientation
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) |
| 05000315/LER-1998-002, :on 980108,discovered Several Broken Master Relay (MR) Covers Inside Ssps Logic Cabinet.Caused by Past Practice of Removing MR Covers to Perform Time Response Testing.Replaced All Unnacceptable Ssps MRs |
- on 980108,discovered Several Broken Master Relay (MR) Covers Inside Ssps Logic Cabinet.Caused by Past Practice of Removing MR Covers to Perform Time Response Testing.Replaced All Unnacceptable Ssps MRs
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) |
| 05000316/LER-1998-002-01, :on 980224,determined That PORV Inoperability Resulted in Condition Outside Design Basis.Caused by Communication Failure.Procedures Revised |
- on 980224,determined That PORV Inoperability Resulted in Condition Outside Design Basis.Caused by Communication Failure.Procedures Revised
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) |
| 05000316/LER-1998-003, :on 980304,two Pressurizer Safety Valves Failed to Lift within Setpoint Tolerance.Caused by Setpoint Drift.Valves Were Retested & Adjustments Were Made to Lower Setpoints |
- on 980304,two Pressurizer Safety Valves Failed to Lift within Setpoint Tolerance.Caused by Setpoint Drift.Valves Were Retested & Adjustments Were Made to Lower Setpoints
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) |
| 05000315/LER-1998-003, :on 980107,missed Procedure Step Resulted in Esfa & RPS Actuation Occurring.Caused by Personnel Error. Work on Ssps Stopped & High Priority Job Order Initiated to Restore Ssps to Normal |
- on 980107,missed Procedure Step Resulted in Esfa & RPS Actuation Occurring.Caused by Personnel Error. Work on Ssps Stopped & High Priority Job Order Initiated to Restore Ssps to Normal
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) |
| 05000316/LER-1998-004-01, :on 990422,determined That Ice Condenser Bypass Leakage Exceeds Design Basis Limit.Caused by Pressure Seal Required by Revised W Design Not Incorporated Into Aep Design.Numerous Matl Condition Walkdowns & Assessments Made |
- on 990422,determined That Ice Condenser Bypass Leakage Exceeds Design Basis Limit.Caused by Pressure Seal Required by Revised W Design Not Incorporated Into Aep Design.Numerous Matl Condition Walkdowns & Assessments Made
| 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) |
| 05000316/LER-1998-004, :on 980319,determined That Ice Condenser Bypass Was Potentially in Excess of Design Basis Limit.Caused by Lack of Understanding.Known Degraded Conditions Resulting in Divider Barrier Pass Being Corrected |
- on 980319,determined That Ice Condenser Bypass Was Potentially in Excess of Design Basis Limit.Caused by Lack of Understanding.Known Degraded Conditions Resulting in Divider Barrier Pass Being Corrected
| 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) |
| 05000315/LER-1998-004, :on 980122,discovered That One of Ice Condenser Flow Passages Contained Large Amount of Frost & Ice.Caused by Inadequate Maint & Surveillance Practices.Completed Detailed Mapping & Quantification of Flow Passage Blockage |
- on 980122,discovered That One of Ice Condenser Flow Passages Contained Large Amount of Frost & Ice.Caused by Inadequate Maint & Surveillance Practices.Completed Detailed Mapping & Quantification of Flow Passage Blockage
| 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) |
| 05000315/LER-1998-004-02, Forwards LER 98-004-02,providing Results of Analyses Performed by W.Ler Is Being Reduced from 7 Pages to 6 Due to Transferring Details of Root Cause Section to Cause of Event, Section | Forwards LER 98-004-02,providing Results of Analyses Performed by W.Ler Is Being Reduced from 7 Pages to 6 Due to Transferring Details of Root Cause Section to Cause of Event, Section | |
| 05000315/LER-1998-005, :on 980122,missing Screws from Ice Condenser Ice Basket Coupling Rings Resulted in Potentially Unanalyzed Condition.Caused by Failure in Shear Due to Overload During Basket Weighing Process.Melted Out Condensers |
- on 980122,missing Screws from Ice Condenser Ice Basket Coupling Rings Resulted in Potentially Unanalyzed Condition.Caused by Failure in Shear Due to Overload During Basket Weighing Process.Melted Out Condensers
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) |
| 05000316/LER-1998-005-01, :on 980715,potential for HELB to Degrade Component Cooling Water Sys Was Noted.Investigation & Analysis of Signficance of Event Is Continuing.Method May Be Developed to Protect CCW Pump Area |
- on 980715,potential for HELB to Degrade Component Cooling Water Sys Was Noted.Investigation & Analysis of Signficance of Event Is Continuing.Method May Be Developed to Protect CCW Pump Area
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) |
| 05000315/LER-1998-006, :on 980225,ice Basket Weighing Option Resulted in Potential Unanalyzed Condition Due to Lack of Technical Basis for Option.Caused by Failure to Maintain Design Basis for Ice Condenser.Revised Plant Procedure |
- on 980225,ice Basket Weighing Option Resulted in Potential Unanalyzed Condition Due to Lack of Technical Basis for Option.Caused by Failure to Maintain Design Basis for Ice Condenser.Revised Plant Procedure
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(b)(2)(ii) |
| 05000315/LER-1998-007, :on 980211,ice Condenser Weights Used to Determine TS Compliance Were Not Representative.Caused by Mgt Methods.Ice Condensers for Both Units Will Be Melted Out & Reloaded W/Fresh Ice |
- on 980211,ice Condenser Weights Used to Determine TS Compliance Were Not Representative.Caused by Mgt Methods.Ice Condensers for Both Units Will Be Melted Out & Reloaded W/Fresh Ice
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) |
| 05000316/LER-1998-007-01, :on 981106,high Energy Line Break Effects in Auxiliary FW Sys Was Noted.Cause of Event Is Under Investigation & Will Be Completed by 990220.Updated LER Will Be Submitted by 990310.With |
- on 981106,high Energy Line Break Effects in Auxiliary FW Sys Was Noted.Cause of Event Is Under Investigation & Will Be Completed by 990220.Updated LER Will Be Submitted by 990310.With
| 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) 10 CFR 50.73(a)(2) |
| 05000315/LER-1998-008, :on 980112,inadequate Contractor Control During Maint & Surveillance Activities Resulted in Ice Basket Damage.Procedures Used to Guide Maint & Surveillance Activities Have Been Upgraded & Rewritten |
- on 980112,inadequate Contractor Control During Maint & Surveillance Activities Resulted in Ice Basket Damage.Procedures Used to Guide Maint & Surveillance Activities Have Been Upgraded & Rewritten
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) |
| 05000316/LER-1998-008, :on 980112,damaged Ice Condenser Ice Basket Removed from Unit 1 Ice Condenser.Caused by Inadequate Control of Contractors & Inappropriate Maint.Damage Beyond Threshold Will Be Repaired & Replaced |
- on 980112,damaged Ice Condenser Ice Basket Removed from Unit 1 Ice Condenser.Caused by Inadequate Control of Contractors & Inappropriate Maint.Damage Beyond Threshold Will Be Repaired & Replaced
| 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii)(B) 10 CFR 50.73(a)(2)(1) |
| 05000315/LER-1998-009, :on 980217,HR SR Not Being Met Resulted in Condition Prohibited by Ts.Caused by Inadequate Surveillance Procedure.Procedures Revised |
- on 980217,HR SR Not Being Met Resulted in Condition Prohibited by Ts.Caused by Inadequate Surveillance Procedure.Procedures Revised
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) |
| 05000315/LER-1998-010, :on 980303,ice Condenser Intermediate Deck Doors Structural Discrepancies Were Noted.Caused by Failure to Follow Procedures.Removed All Intermediate Deck Door Frames & Support Beams & Reassembling Parts |
- on 980303,ice Condenser Intermediate Deck Doors Structural Discrepancies Were Noted.Caused by Failure to Follow Procedures.Removed All Intermediate Deck Door Frames & Support Beams & Reassembling Parts
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(x) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) |
| 05000315/LER-1998-011, :on 980305,steel Containment Liner Pitting Was Is Excess of Design.Caused by Lack of Procedural Controls. Seals Were Removed,Containment Liner Plate Was Prepared & Coated & New Seals Applied |
- on 980305,steel Containment Liner Pitting Was Is Excess of Design.Caused by Lack of Procedural Controls. Seals Were Removed,Containment Liner Plate Was Prepared & Coated & New Seals Applied
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) |
| 05000315/LER-1998-012, :on 980305,discovered That 1/4 Inch Particulate Retention Requirement Had Not Been Maintained in Containment Recirculation Pump.Caused by Incompleted Design Change.Will Correct Condition Under New Design Change |
- on 980305,discovered That 1/4 Inch Particulate Retention Requirement Had Not Been Maintained in Containment Recirculation Pump.Caused by Incompleted Design Change.Will Correct Condition Under New Design Change
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) |
| 05000315/LER-1998-013, :on 980306,improper Splice Configurations for Power Operated Relief Valve Limit Switches Resulted in Unanalyzed Condition.Caused by Inadequate Guidance in Installation Documents.Evaluation Performed |
- on 980306,improper Splice Configurations for Power Operated Relief Valve Limit Switches Resulted in Unanalyzed Condition.Caused by Inadequate Guidance in Installation Documents.Evaluation Performed
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) |
| 05000315/LER-1998-014, :on 980310,determined That Plant Had Operated in Unanalyzed Condition.Caused by Inadequate Interface with W Re Assumptions Used in Safety Analysis.Will Revise Functional Restoration Procedure FRZ-1.With |
- on 980310,determined That Plant Had Operated in Unanalyzed Condition.Caused by Inadequate Interface with W Re Assumptions Used in Safety Analysis.Will Revise Functional Restoration Procedure FRZ-1.With
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded |
| 05000315/LER-1998-014-03, Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed | Forwards LER 98-014-03, Response to High-High Containment Pressure Procedure Not Consistent with Analysis of Record. Revised Info Marked by Sidebars in Right Hand Margin. Commitments Made by Util,Listed | |
| 05000315/LER-1998-015, :on 980312,ice Weight Requirements Potentially Were Not Met Due to Nonconservative Assumption in Software Program.Update to Interim LER Will Be Issued by 980513 |
- on 980312,ice Weight Requirements Potentially Were Not Met Due to Nonconservative Assumption in Software Program.Update to Interim LER Will Be Issued by 980513
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) 10 CFR 50.73(s)(2) |
| 05000315/LER-1998-016, :on 980323,re non-safety Related Cables Routed to Safety Related Equipment.Lers 98-016-00 & 98-016-01 Retracted |
- on 980323,re non-safety Related Cables Routed to Safety Related Equipment.Lers 98-016-00 & 98-016-01 Retracted
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) |
| 05000315/LER-1998-017, :on 980327,debris Was Found in Sample Ice from Ice Condenser Sys.Caused by Poor Work Practices.Ice Condenser Has Been Completely Thawed & Inspection,Repair & Refurbishment Activities Have Begun |
- on 980327,debris Was Found in Sample Ice from Ice Condenser Sys.Caused by Poor Work Practices.Ice Condenser Has Been Completely Thawed & Inspection,Repair & Refurbishment Activities Have Begun
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2)(viii) |
| 05000315/LER-1998-018, :on 980505,use of RCP Seals as Alternate Boron Injection Flow Path Resulted in Unanalyzed Condition.Caused by Maintaining Temp Above Recommended Max Temp.Westinghouse Has Provided Technical Input on Issue |
- on 980505,use of RCP Seals as Alternate Boron Injection Flow Path Resulted in Unanalyzed Condition.Caused by Maintaining Temp Above Recommended Max Temp.Westinghouse Has Provided Technical Input on Issue
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) |
| 05000315/LER-1998-019-02, Forwards LER 98-019-02,which Provides Plant Test Data Gathered to Determine Error Associated W/Electric H Recombiner Temp Measurement Circuits.Changes to LER Are Marked W/Sidebar | Forwards LER 98-019-02,which Provides Plant Test Data Gathered to Determine Error Associated W/Electric H Recombiner Temp Measurement Circuits.Changes to LER Are Marked W/Sidebar | |
| 05000315/LER-1998-019, :on 980320,determined That Electric Hydrogen Recombiner TS Surveillance Requirement 4.6.4.2.b.1 Was Not Met.Caused by Design Deficiency Due to Inadequate Design Change Mgt.Revised Procedures |
- on 980320,determined That Electric Hydrogen Recombiner TS Surveillance Requirement 4.6.4.2.b.1 Was Not Met.Caused by Design Deficiency Due to Inadequate Design Change Mgt.Revised Procedures
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) |
| 05000315/LER-1998-020, :on 980408,noted Failure to Include Sodium Hydroxide in W Border Computer Program Used to Determine Ph in Containment Sump.Cause Indeterminate.Updated LER Will Be Submitted by 981001 |
- on 980408,noted Failure to Include Sodium Hydroxide in W Border Computer Program Used to Determine Ph in Containment Sump.Cause Indeterminate.Updated LER Will Be Submitted by 981001
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) |
| 05000315/LER-1998-021, :on 980311,determined That Oil Pans Not Installed on RCP Motors Resulted in App R Noncompliance. Caused by Failure to Fully Implement App R Requirements.Will Updgrade Oil Leak Collection Sys |
- on 980311,determined That Oil Pans Not Installed on RCP Motors Resulted in App R Noncompliance. Caused by Failure to Fully Implement App R Requirements.Will Updgrade Oil Leak Collection Sys
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) |
| 05000315/LER-1998-022, :on 980415,postulated Failure of SAT N Regulator Was Noted.Caused by Failure to Perform Adequate SE for Procedure rev.10CFR50.59 Program Has Been Upgraded to Meet Current Industry Standards.With |
- on 980415,postulated Failure of SAT N Regulator Was Noted.Caused by Failure to Perform Adequate SE for Procedure rev.10CFR50.59 Program Has Been Upgraded to Meet Current Industry Standards.With
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) |
| 05000315/LER-1998-023, :on 980416,potential Failure Due to Cross Train Routing of non-safety Related Cables Was Noted.Ler 98-023-00 & 98-023-01,retracted |
- on 980416,potential Failure Due to Cross Train Routing of non-safety Related Cables Was Noted.Ler 98-023-00 & 98-023-01,retracted
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) |
| 05000315/LER-1998-024, :on 980417,allegation Concerning Accuracy of Ice Basket Weights Occurred.Allegation Has Been Investigated & Results of Investigation Will Be Provided to NRC by 980522 |
- on 980417,allegation Concerning Accuracy of Ice Basket Weights Occurred.Allegation Has Been Investigated & Results of Investigation Will Be Provided to NRC by 980522
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) |
| 05000315/LER-1998-025, :on 980424,plant Personnel Determined That Surveillance Requirements of Tech Specs 4.6.5.1.b.3 Were Not Met.Caused by Lack of Attention to Detail.Procedures Revised |
- on 980424,plant Personnel Determined That Surveillance Requirements of Tech Specs 4.6.5.1.b.3 Were Not Met.Caused by Lack of Attention to Detail.Procedures Revised
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(B) |
| 05000315/LER-1998-026, :on 980430,TS SR 4.6.5.1.b.2 Was Not Met.Caused by Failure to Accurately Transfer SR Into Plant Procedures. Software Used to Support Ice Condenser Surveillance Program Will Either Be Revised or Replaced |
- on 980430,TS SR 4.6.5.1.b.2 Was Not Met.Caused by Failure to Accurately Transfer SR Into Plant Procedures. Software Used to Support Ice Condenser Surveillance Program Will Either Be Revised or Replaced
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(1) |
| 05000315/LER-1998-027, :on 980505,discovered Debris of Unknown Origin in West Containment Spray Header.Cause Indeterminate. Evaluation of Condition in Progress & Updated LER Will Be Submitted |
- on 980505,discovered Debris of Unknown Origin in West Containment Spray Header.Cause Indeterminate. Evaluation of Condition in Progress & Updated LER Will Be Submitted
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) |
| 05000315/LER-1998-028, :on 980513,determined That TS Surveillance Requirements Not Met Due to Lack of Understanding of Staggered Test Basis. Caused by Lack of Specific Training. Periodic Change of Nuclear Plant Maint Sys |
- on 980513,determined That TS Surveillance Requirements Not Met Due to Lack of Understanding of Staggered Test Basis. Caused by Lack of Specific Training. Periodic Change of Nuclear Plant Maint Sys
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) 10 CFR 50.73(a)(2)(viii)(A) 10 CFR 50.73(a)(2)(viii)(B) |
| 05000315/LER-1998-029, :on 980422,SFP Ventilation Sys Was Noted Inoperable.Caused by Design Deficiency.Safety Evaluation Successfully Performed & Appropriate Surveillance Testing Completed |
- on 980422,SFP Ventilation Sys Was Noted Inoperable.Caused by Design Deficiency.Safety Evaluation Successfully Performed & Appropriate Surveillance Testing Completed
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) |
| 05000315/LER-1998-029-01, Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed | Forwards LER 98-029-01, Fuel Handling Area Ventilation Sys Inoperable Due to Original Design Deficiency. Supplemental Rept Represents Extensive Rev to Original LER & Replaces Rept in Entirely.Commitment Listed | |
| 05000315/LER-1998-030, Re Incorrect Installation of Containment Spray Heat Exchanger.Ler 98-030-00 Retracted. with | Re Incorrect Installation of Containment Spray Heat Exchanger.Ler 98-030-00 Retracted. with | 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) |
| 05000315/LER-1998-031, :on 980610,potential Common Mode Failure of RHR Pumps Were Noted.Caused by Inaccurate Values.Accurate Miniflow Numbers Have Been Determined by Flow Testing |
- on 980610,potential Common Mode Failure of RHR Pumps Were Noted.Caused by Inaccurate Values.Accurate Miniflow Numbers Have Been Determined by Flow Testing
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) |
| 05000315/LER-1998-031-01, Forwards LER 98-031-01,re Potential Common Mode Failure of RHR Pumps Due to Use of Inaccurate Values.Commitment Made by Util,Listed | Forwards LER 98-031-01,re Potential Common Mode Failure of RHR Pumps Due to Use of Inaccurate Values.Commitment Made by Util,Listed | |
| 05000315/LER-1998-032, Forwards LER 98-032-00,originally Due on 980723.Additional Seven Days to Submit LER Was Granted by B Burgess of Region III | Forwards LER 98-032-00,originally Due on 980723.Additional Seven Days to Submit LER Was Granted by B Burgess of Region III | 10 CFR 21.21(c)(3)(ii) |
| 05000315/LER-1998-033, :on 980611,H Recombiner Wattmeter Circuit TS SR Was Not Met.Caused by Inadequate TS SR Work Practices. Lessons Learned Document Was Issued to All Maint Personnel Involved W/Writing Surveillance Procedures |
- on 980611,H Recombiner Wattmeter Circuit TS SR Was Not Met.Caused by Inadequate TS SR Work Practices. Lessons Learned Document Was Issued to All Maint Personnel Involved W/Writing Surveillance Procedures
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2) |
| 05000315/LER-1998-034, :on 980623,flow Rates to Containment Spray Headers Were Potentially Lower than Design Basis Values. Declared Containment Spray Sys,Inoperable.Update Will Be Submitted by 981015 |
- on 980623,flow Rates to Containment Spray Headers Were Potentially Lower than Design Basis Values. Declared Containment Spray Sys,Inoperable.Update Will Be Submitted by 981015
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) |
| 05000315/LER-1998-035, :on 980702,identified That Potentially Impacted Ability of Shock Absorbing Bumpers to Perform Intended Functions.Caused by Poor Work Practices.Bumpers Will Be Replaced by Newer Design Shock Absorber |
- on 980702,identified That Potentially Impacted Ability of Shock Absorbing Bumpers to Perform Intended Functions.Caused by Poor Work Practices.Bumpers Will Be Replaced by Newer Design Shock Absorber
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(ii)(A), Seriously Degraded 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) |
| 05000315/LER-1998-036, :on 980723,discovered That Flow Indicator Had Not Been Calibr at TS Required Frequency.Caused by Inadequate Work Practices.Action Request Has Been Written to Calibr Component on Refueling Outage Basis |
- on 980723,discovered That Flow Indicator Had Not Been Calibr at TS Required Frequency.Caused by Inadequate Work Practices.Action Request Has Been Written to Calibr Component on Refueling Outage Basis
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) |
| 05000315/LER-1998-037-01, Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal | Forwards LER 98-037-01,representing Extensive Rev to Original LER & Replacing Rept in Entirety.Listed Commitments Identified in Submittal | |
| 05000315/LER-1998-037, :on 980812,ice Condenser Bypass Leakage Exceeds Design Basis Limit of 5 Square Feet Occurred.Caused by Lack of Understanding of Design Basis of Containment as Sys. Procedure Will Be Developed to Guide Insp.With |
- on 980812,ice Condenser Bypass Leakage Exceeds Design Basis Limit of 5 Square Feet Occurred.Caused by Lack of Understanding of Design Basis of Containment as Sys. Procedure Will Be Developed to Guide Insp.With
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability 10 CFR 50.73(a)(2)(iv), System Actuation 10 CFR 50.73(a)(2)(i) 10 CFR 50.73(a)(2)(x) 10 CFR 50.73(a)(2)(iii) 10 CFR 50.72(b)(3)(ii), Degraded or Unanalyzed Condition 10 CFR 50.73(a)(2)(viii) |