REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
CCESSION NBR:9808270302
DOC.DATE: 98/08/12
NOTARIZED: NO
DOCKET ¹
CIL:50-315 Donald C.
Cook Nuclear Power Plant, Unit 1, Indiana
M
05000315
50-316 Donald C.
Cook Nuclear
Power Plant, Unit 2, Indiana
M
05000316
AUTH.NAME
AUTHOR AFFILIATION
GROBE,J.A.
Region
3
(Post
820201)
RECIP.NAME
RECIPIENT AFFILIATION
SAMPSON, J.
American Electric Power Co., Inc.
SUBJECT:
Forwards insp repts
50-315/98-15
6 50-316/98-15
on
980612-0716.No violations noted. Prompt
&. extensive
C/As
taken by licensee staff in response
to inadvertent
release
of carbon dioxide in auxiliary building.
DISTRIBUTION CODE: IE01F
COPIES
RECEIVED:LTR J
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation
esponse
A
NOTES:
RECIPIENT
ID CODE/NAME
PD3-3
INTERNAL: AEOD/SPD/RAB
DEDRO
NRR/DRCH/HOHB
NRR/DRPM/PERB
OE DIR
RGN3
FILE
01
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
STANG,J
AEOD/TTC
M/PECB
NUDOCS-ABSTRACT
OGC/HDS3
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
.G
0
Y
ERNAL: LITCO BRYCE,J H
NRC PDR
1
1
1
1
NOAC
NUDOCS FULLTEXT
1
1
1
1
THlB DOCiJMEN'f
HAS BEEN SCANNED
NOTE TO ALL "RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE.
TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS
OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL
DESK
(DCD)
ON EXTENSION 415-2083
TOTA'L NUMBER OF 'COPIES
REQUIRED:
LTTR
17
ENCL
17
~R REOy
P0
Op
An
C
O
++*++
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
801 WARRENVILLEROAD
LISLE, ILLINOIS605324351
August 12,
1998
Mr. John Sampson
Site Vice President
Nuclear Generation Group
American Electric Power Company
500 Circle Drive
Buchanan, Ml 49107-1395
SUBJECT:
D. C. COOK INSPECTION REPORT 50-315/98015(DRP); 50-316/98015(DRP)
Dear Mr. Sampson:
On July 16, 1998, the NRC completed an inspection at your D. C. Cook Units 1 and 2 reactor
facilities. The inspection was an examination, of activities conducted under your license as they
relate to compliance with the Commission rules and regulations and with the conditions with your
license.
Areas reviewed included Operations, Maintenance, Surveillance, Engineering, 'and Plant
Support.
Within these areas, the inspection consisted. of selective examinations of procedures
and representative
records, interviews with personnel, and observations of activities in progress.
The enclosed report presents the results of that inspection.
Overall, steady progress was being made in the area of repairs to the ice condensers
in both
Units. Your staff observed problems with the command and control of the ice condenser projects
and in a proactive effort, assigned additional project management
in an effort to resolve
command and control issues.
Licensed operators were also observed by the inspectors to
question the non-conservative resetting of a Limiting Condition for Operation (LCO) time clock.
In addition, prompt and extensive corrective actions were taken by your staff in response
to the
inadvertent release of carbon dioxide in the auxiliary building. The release occurred due to poor
planning associated
with a maintenance activity that had the potential to impact personnel safety.
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, the
enclosures,
and your response will be placed in the NRC Public Document Room.
Sincerely,
Docket Nos.: 50-315; 50-316
License Nos.:
hn A. Grobe, Director
Division of Reactor Safety.
Enclosure:
Inspection Report
50-315/98015(DRP);
50-316/98015(DRP)
See Attached Distribution
'F808270302 9808f2
ADQCK 050003f5
8
J. Sampson
-2-
cc w/encl:
R. Eckstein, Chief Nuclear Engineer
D. Cooper, Plant Manager
R. Whale, Michigan Public Service Commission
Michigan Department of Environmental Quality
Emergency Management
Division
Ml Department of State Police
D. Lochbaum, Union of Concerned Scientists
J. Sampson
-2-
cc w/encl:
R. Eckstein, Chief Nuclear Engineer
D. Cooper, Plant Manager
R. Whale, Michigan Public Service Commission
Michigan Department of Environmental Quality
Emergency Management
Division
Ml Department of State Police
D. Lochbaum, Union of Concerned Scientists
Distribution:
RRB1 (E-Mail)
Project Mgr., NRR w/encl
J. Caldwell, Rill w/encl
C. Pederson,
Rill w/encl
B. Clayton, Rill w/encl
DRP w/encl
TSS w/encl
DRS (2) w/encl
Rill PRR w/encl
'UBLIC
IE-01 w/encl
Docket File w/encl
GREENS
IEO (E-Mail)
DOCDESK (E-Mail)
0
August 12,
1998
Mr. John Sampson
Site Vice President
Nuclear Generation Group
American Electric Power Company
500 Circle Drive
Buchanan, Ml 49107-1395
SUBJECT:
D. C. COOK INSPECTION REPORT 50-315/98015(DRP); 50-316/98015(DRP)
Dear Mr. Sampson:
On July 16, 1998, the NRC completed an inspection at your D. C. Cook Units 1 and 2 reactor
facilities. The inspection was an examination of activities conducted under your license as they
relate to compliance with the Commission rules and regulations and with the conditions with your
license.
Areas reviewed included Operations, Maintenance, Surveillance, Engineering, and'Plant
Support.
Within these areas, the inspection consisted of selective examinations of procedures
and representative
records, interviews with personnel, and observations of activities in progress.
The enclosed report presents the results of that inspection.
inadvertent release of carbon dioxide in the auxiliary building. The release occurre
planning associated
with a maintenance
activity that had the potential to impact personnel s
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, the
enclosures,
and your response will be placed in the NRC Public Document Room.
Overall, steady progress was being made in the area of repairs to the ice condensers
in both
Units. Your staff observed problems with the command and control of the ice condenser projects
and in a proactive effort, assigned additional project management
in an effort to resolve
command and control issues.
Licensed operators were also observed by the inspectors to
question the non-conservative resetting of a Limiting Condition for Operation (LCO) time clock.
In addition, prompt and extensive corrective actions were taken by your staff in response to the
d due to poor
afety.
Sincerely,
/s/ John A. Grobe
John A. Grobe, Director
Division of Reactor Safety
Docket Nos.: 50-315; 50-316
License Nos.:
Enclosure:
Inspection Report
50-315/98015(DRP);
50-316/98015(DRP)
See Attached Distribution
DOCUMENT NAME: G:<COOKiDCC98015.DRP
To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" = Copy
w/attach/encl "N" = No co
OFFICE
Rl
NAME
B
s d
DATE
08
98
Rill
Grob
08/898
OFFICIALRECORD COPY
0
J. Sampson
-2-
cc w/encl:
R. Eckstein, Chief Nuclear Engineer
D. Cooper, Plant Manager
R. Whale, Michigan Public Service Commission
Michigan Department of Environmental Quality
Emergency Management
Division
Ml Department of State Police
D. Lochbaum, Union of Concerned Scientists
Distribution:
RRB1 (E-Mail)
Project Mgr., NRR w/encl
J. Caldwell, Rill w/encl
C. Pederson,
Rill w/encl
B. Clayton, Rill w/encl
DRP w/encl
TSS w/encl
DRS (2) w/encl
Rill PRR w/encl
PUBLIC IE-01 w/encl
Docket File w/encl
GREENS
IEO (E-Mail)
DOCDESK (E-Mail)