Forwards Insp Repts 50-315/98-12 & 50-316/98-12 on 980428-0611 & Nov.Two Violations Identified Involving Failure of Staff to Take Adequate Actions After Identification That on 971217,RV Head Not Properly Vented
ML17334B800
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 06/30/1998
From: Grobe J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sampson J
AMERICAN ELECTRIC POWER CO., INC.
Shared Package
ML17334B801 List:
References
50-315-98-12, 50-316-98-12, NUDOCS 9807070181
Download: ML17334B800 (10)


See also: IR 05000315/1998012

Text

CATEGORY 2

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

~V

ACCESSION NBR:9807070181

DOC.DATE: 98/06/30

NOTARIZED: NO

DOCKET

~

~

~

~

ACXL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana

M

05000315

50-316 Donald,C.

Cook Nuclear Power Plant, Unit 2, Indiana

M

05000316

AUTH.NAME

AUTHOR AFFILIATION

GROBE,J.A.

Region

3

(Post

820201)

RECIP.NAME

RECIPIENT AFFILIATION

SAMPSON,J..

American Electric Power Co., Inc.

SUBJECT:

Forwards insp repts 50-315/98-12

& 50-316/98-12

on

980428-0611

&. NOV. Two violations identified involving

failure of staff to take

adecpxate

actions after

identification that on 971217,RV head not properly vented.

DISTRIBUTION CODE: IE01T

COPIES

RECEIVED:LTR 4 ENCL

SIZE:

TITLE: General

(50 Dkt)-Xnsp Rept/Notice of Vi&o ation Response

NOTES:

>1

T

G

RECIPIENT

ID CODE/NAME

PD3-3

PD

INTERNAL: AEOD/SPD/RAB

DEDRO

NRR/DRCH/HOHB

NRR/DRPM/PERB

OE DIR

RGN3

FILE

01

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

RECIPXENT

ID CODE/NAME

STANG, J

ILE CENTE

CB

NUDOCS -ABSTRACT

OGC/HDS3

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1.

1

1

1

TERNAL: LITCO BRYCE,J H

NRC PDR

1

1

1

1

NOAC

NUDOCS FULLTEXT

1

1

1

1

D

0

E

N

THIS DOCUMENT

H ~B ""'"-~ewwED

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS

OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL

DESK

(DCD)

ON EXTENSION 415-2083

FULL TEXT CONVERSION REQUIRED

TOTAL NUMBER OF COPIES

REQUXRED:

LTTR

17

ENCL

17

~8 REgy

GW

0

A0

li

O

'I

VJ

I

Cy

~O

~+*++

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

801 WARRENVILLEROAD

LISLE, ILLINOIS60532-4351

June

30,

1998

Mr. John Sampson

Site Vice President

Nuclear Generation Group

American Electric Power Company

500 Circle Drive

Buchanan,

Ml 49107-1395

SUBJECT:

D. C. COOK INSPECTION REPORT 50-315/98012(DRP); 50-316/98012(DRP)

AND NOTICE OF VIOLATION

Dear Mr. Sampson:

On June 11, 1998, the NRC completed an inspection at your D. C. Cook Units 1 and 2 reactor

facilities. The inspection was an examination of activities conducted under your license as they

relate to compliance with the Commission rules and regulations and with the conditions with your

license.

Areas reviewed included operations, maintenance,

surveillance, engineering, plant

support, and the events surrounding the inadvertent operation of all three fire protection pumps

without a suction source.

Within these areas, the inspection consisted of selective examinations

of procedures and representative

records, interviews with personnel, and observations of

activities in progress.

The enclosed report presents the results of that inspection.

Overall, shutdown operations were carried out in a deliberate and controlled manner.

The

inspectors observed a conservative operating philosophy when operators stopped the draining of

the primary system after observing a discrepancy between two reactor coolant system level

indicators.

Although the operating procedure allowed the operators to continue draining the

primary system, the operators requested that instrument and control personnel 'correct the level

indication discrepancy before continuing the primary system draining evolution. Operators were

also observed during this inspection to be attentive to their panels.

Two violations of regulatory requirements were identified during this inspection.

The first

violation involved the failure of your staff to take adequate corrective actions after identification

that on,December 17, 1997, the reactor vessel head was not properly vented when primary

system flow is stopped with the reactor in cold shutdown.

Subsequently,

on May 5, 1998, your

staff identified that the reactor vessel head was again not properly vented. The second violation

concerned the inspectors'dentification of an inadequate procedure that did not contain

appropriate criteria for the exclusion of foreign material. These violations represent

a

continuation of problems with corrective actions and the use of inadequate procedures to

perform safety-related activities.

These violations are cited in the enclosed Notice of Violation (Notice), and the circumstances

surrounding the violations are described in detail in the enclosed report.

You are required to

respond to this letter and should followthe instructions specified in the enclosed Notice when

preparing your response.

The NRC willuse your response,

in part, to.determine whether further

enforcement action is necessary

to ensure compliance with regulatory requirements.

f

9807070i8i

980630

PDR

ADOCK 050003i5

8

PDR

-2-

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, the

enclosures,

and your response willbe placed in the NRC Public Document Room.

Sincerely,

Docket Nos.: 50-315; 50-316

License Nos.: DPR-58; DPR-74

John A. Grobe, Director

Division of Reactor Safety

Enclosures:

1.

Notice of Violation

2.

Inspection Report

50-315/98012(DR

P);

50-316/98012(DR

P)

cc w/encls:

D. Hafer, Acting Chief

Nuclear Engineer

D. Cooper, Plant Manager

R. Whale, Michigan Public

Service Commission

Michigan Department of

Environmental Quality

Emergency Management

Division, Ml Department

of State Police

D. Lochbaum, Union

of Concerned Scientists

J. Sampson

1

In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, the

enclosures,

and your response will be placed in the NRC Public Document Room.

Sincerely,

/s/Melvyn Leach for

Docket Nos.: 50-315; 50-316

License Nos.:

DPR-58; DPR-74

John A. Grobe, Director

Division of Reactor Safety

Enclosures:

1.

2.

Notice of Violation

Inspection Report

50-315/98012(DR

P);

50-316/98012(DR

P)

See Attached Distribution

,

DOCUMENT NAME: R:iINSPRPTSiPOWERSiCOOKiDCC98012.DRP

To receive a copy of this document, indicate in the box "C" = Copy w/o attach/encl "E" = Copy

w/attach/encl "N"= No cop

OFFICE

RIII

Rill

Rill

NAME

Schweibinz:d

Bur ess

Grobe~~

DATE

6/

/98

6/3498

6//g /98

OFFICIALRECORD COPY

J. Sampson

1

-3-

cc w/encls:

Don Hafer, Acting Vice President

Nuclear Engineering

Douglas Cooper, Plant Manager

Richard Whale, Michigan Public

Service Commission

Michigan Department of

Environmental Quality

Emergency Management

Division, Ml Department

of State Police

David A. Lochbaum, Union

of Concerned Scientists

Distribution:

RRB1 (E-Mail)

Project Mgr., NRR w/encls

C. Paperiello, Rill w/encls

J. Caldwell, Rill w/encls

B. Clayton, Rillw/encls

SRI DC Cook w/encls

DRP w/encls

TSS w/encls

DRS (2) w/encls

Rill PRR w/encls

PUBLIC IE-01 w/encls

Docket File w/encls

GREENS

IEO (E-Mail)

DOCDESK (E-Mail)