ML17334B596

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for June 1996 for DC Cook Nuclear Plant Unit 2
ML17334B596
Person / Time
Site: Cook 
Issue date: 06/30/1996
From: Russo M, Sampson J, Doreen Turner
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9607170043
Download: ML17334B596 (6)


Text

American EieciricP~

Cook Nudear Piant One Cook Pface Bridgrnan, Ml49106 616 465 5901 Il July 1, 1996 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

Pursuant to the requirements of Donald C.

Cook Nuclear Plant Unit 2 Technical Specification 6.9.1.10, the attached Monthly Operating Report for the month of June 1996 is submitted.

Respectfully, J.R.

S mpson Plant Manager Attachment c:

NRC Region III D.R.

Hahn R.C. Callen S.

Hamming INFO Records Center ANI Nuclear Engineering Department E.E. Fitzpatrick A.A. Blind P.A. Barrett W. G. Smith, Jr.

S.J.

Brewer D.W. Paul S.H. Steinhart J.L. Leichner B.L. Bartlett D.G. Turner W.H. Schalk M.E. Russo 9607i70043 '&0630 PDR ADQCK 05000316 R

PDR

N.R.C.

OPERATING DATA REPORT DOCKET NO.

50-316 DATE 01/Jul/96 COMPLETED BY DG Turner TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

CD Cook Unit 2

2. Reporting Period June 1996 notes
3. Licensed Thermal Power (MWt) 3411 4.

Name Plate Rating (Gross MWe) 1133

5. Design Electrical Rating (Net MWe) 1090 6.

Maximum Dependable Capacity (GROSS MWe) 1100 7.

Maximum Dependable Capacity (Net MWe) 1060

8. If Changes Occur in Capacity Ratings (Items no.

3 through

7) Since Last Report Give Reasons 9.

Power Level To Which Restricted. If Any (Net MWe) 10.

Reasons For Restrictions. If Any:

ll. Hours in Reporting Period 12.

No. of Hrs. Reactor Was Critical

13. Reactor Reserve Shutdown Hours
14. Hours Generator on Line
15. Unit Reserve Shutdown Hours
16. Gross Therm. Energy Gen.

(MWH)

17. Gross Elect Energy Gen.

(MWH)

18. Net Elect. Energy Gen.

(MWH)

19. Unit Service Factor
20. Unit Ava'lability Factor
21. Unit Capacity Factor (MDC Net)
22. Unit Capacity Factor (DER Net)
23. Unit Forced Outage Rate 24.

Shutdowns Scheduled over Next Six None This Mo.

Yr. to Date 720

~ 0 4368.0 720.0 3271.6 0.0 0.0 720.0 3225.9 0.0 0.0 2453259 10587610 799290 3454900 773465 3338876 100.0 73 '

100.0 73.9 101.3 72.1 98.6 70.1 0.0 0.3 Months (Type, Date,and Cumm.

162144.0 111595.9 0.0 108031.6 0.0 332222074 107661260 103698839 67.6 67.6 61.1 5

6

14. 7 Duration):
25. If Shut Down At End of Report Period, Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION Achieved

AVERAGE DAILY POWER LEVEL (MWe-Net)

MONTH DOCKET NO.

50-316 UNIT TWO DATE 01/Jul /96 COMPLETED BY DG Turner TELEPHONE 616-465-5901 June 1996 DAY 96/06/01 96/06/02 96/06/03 96/06/04 96/06/05 96/06/06 96/06/07" 96/06/08 96/06/09 96/06/10 96/06/11 96/06/12 96/06/13 96/06/14 96/06/15 96/06/16 AVERAGE DAILY POWER LEVEL 1089 1091 1089 1088 1087 1086 1086 1078 1082 1086 1087 1084 1067 1069 1069 1066 DAY 96/06/17 96/06/18 96/06/19 96/06/20 96/06/21 96/06/22 96/06/23 96/06/24 96/06/25 96/06/26 96/06/27 96/06/28 96/06/29 96/06/30 AVERAGE DAILY POWER LEVEL 1071 1063 1059 1062 1056 1053 1064 1067 1082 1079 1077 1079 1060 1052

DOCKET NO:

50-316 UNIT NAME:

D.C.

Cook Unit 2 COMPLETED BY:

M.E. Russo TELEPHONE:

616-465-5901 DATE:

July 1, 1996 PAGE:

Page 1 of 1

MONTHLY OPERATING ACTIVITIES JUNE 1996 HIGHLIGHTS The unit entered this reporting period in Mode 1 at 100%

RTP.

The unit exited this reporting period in Mode 1 at'00%

RTP.

There were no challenges to the pressurizer safety valves or power operated relief valves.

Gross electrical generation for the month of June was 799290 MWH.

DETAILS No details to report.

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH: JUNE 1996 DOCKET NO:

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

PAGE:

50-316 D ~ C.

COOK UNIT 2 July 1, 1996, M.E. Russo 616-465-5901 Page 1 OF 1

DURATION NO.

DATE TYPE HOURS METHOD OF SHUTTING LICENSEE DOWN EVENT SYSTEM COMPONENT CAUSE AND CORRECTIVE ACTION REASON REACTOR REPORT NO ~

CODE CODE TO PREVENT RECURRENCE None There were no unit shutdowns or significant power reductions from 100%

RTP this month.

1 F:

Forced S:

Scheduled 2

Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test C:

Refueling D:

Regulatory Restriction E:

Operator Training and License Examination F:

Administrative G:

Operational Error (Explain)

H:

Other (Explain) 3 Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain)

Exhibit G Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161) 5Exhibit I:

Same Source

t II C