Clarifies Comments in Safety Insp Repts 50-315/92-17 & 50-316/92-17 on 920804-07 Re Tritium Migration in Aquifer of Plant & Surrounding Communities.Forwards Hydrogeologic Evaluation of Cook Nuclear Plant,Bridgman,Mi
ML17334B448
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 10/08/1992
From: Fitzpatrick E
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Davis A
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML17334B449 List:
References
AEP:NRC:1175B, NUDOCS 9210150293
Download: ML17334B448 (4)


Text

XCCEr,ERA'rED vrSrRXam.raw DEMOxSrR<rrax svSrEM j

REGULAT.

INFORMATION DISTRIBUTIO STEM (RIDS) l ACCESSION NBR:9210150293 DOC.DATE: 92/10/08 NOTARIZED: NO

/

DOCKET ¹ FACIL:50-315 Donald C.

Cook Nuclear Power Plant, Unit 1, Indiana M

05000315 50-316 Donald C.

Cook Nuclear Power Plant, Unit 2, Indiana M

05000316 AUTH.NAME AUTHOR AFFILIATION FITZPATRICK,E Indiana Michigan Power Co. (formerly Indiana

& Michigan Ele RECIP.NAME RECIPIENT AFFILIATION DAVISFA.B.

Document Control Branch (Document Control Desk) M R

SUBJECT:

Clarifies comments in Safety Insp Repts 50-315/92-17 50-316/92-17 on 920804-07 re tritium migration in aquifer of plant

& surrounding communities. Forwards "Hydrogeologic Evaluation of Cook Nuclear Plant,Bridgman,MI."

DISTRIBUTION CODE:

IE06D COPIES RECEIVED:LTR 1

ENCL

/

SIZE:

(9 4 S

TITLE: Environ

& Radiological (50 DKT)-Insp Rept/Notice of Violation Respons /

NOTES:

RECIPIENT ID CODE/NAME PD3-1 LA STANGFJ INTERNAL: AEOD/ANDERSONFR NMSS/SGTB 4E4 NRR/DREP/PRPB10 NUDOCS-ABSTRACT OGC/HDS2 RES RGN3 FILE 01 EXTERNAL: EG&G SIMPSONFF NSIC COPIES LTTR ENCL 1

0 1

1 1

1 1

1 2

2 1

1 1

1 1

1 1

1 2

2 1

1 RECIPIENT ID CODE/NAME PD3-1 PD AEOD/DSP NRR/DLPQ/LPEB10 NRR/PMAS/ILRB12 OE.DIR

~REG FIL 02 RGN3 DRSS/RPB RGN4 MURRAY,B NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEA)

HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.

ROOlvf Pl-37 (EXT. 504-2065) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL 21

,~~

'l g

I I

Indiana Michigan Power Company P.O. Box 16631 Co!umbus, OH 43216 AN umr@

NSCHESQH PQWM AEP:NRC:1175B Donald C.

Cook Nuclear Plant Unit Nos.

1 and 2

Docket Nos.

50-315 and 50-316 License Nos.

DPR-58 and DPR-74 EVALUATION OF TRITIUM MIGRATION IN THE AQUIFER OF THE COOK NUCLEAR PLANT AND SURROUNDING COMMUNITIES U.

S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, DC 20555 ATTN:

A. B. Davis October 8,.

1992.'ear Mr. Davis:

This letter is being sent to you to clarify several comments in the routine safety inspection report 315/92017; 316/92017 for the Donald C.

Cook Nuclear Plant dated August 21, 1992.

The inspection covered the period August 4 through 7, 1992.

Open item 2 (315/90012-02; 316/90012-02),

pages 2 and 3, of the inspection report, refers to our evaluation of tritium migration from the onsite absorption pond due to releases from the turbine room sump.

The report states in part:

"Water samples taken during the late summer/early fall of 1991 indicated possible tritium migration to wells assumed to be unaffected in the hydrology study.

In res onse to this conflict a new h drolo stud has been commissioned and all onsite wells are now monitored as art of the licensee's Radiolo ical Environmental Monitorin Pro ram "

We wish to clarify the underlined statement above.

In our AEP:NRC:1164 letter dated September 24,

1991, we submitted our report of tritium migration in the aquifer of the Donald C.

Cook Nuclear Plant and surrounding communities.

This report was based on a hydrology study dated April 1991.

Unrelated to the tritium migration issue, another hydrology study commenced in May of 1991 to renew our groundwater discharge permit with the Michigan

." g g ) 6 Q Department of Natural Resources (MDNR).

During the hydrology 9210i50293 921008 PDR ADOCK 05000315

, 8 PDR

~(pd

(

Mr. A. B. Davis AEP:NRC:1175B study conducted for the MDNR, water samples obtained in the late summer/early fall of 1991 indicated absorption pond influence at the southern portion of the plant site boundary.

This conclusion was finalized in December of 1991 when the hydrology report for the MDNR was completed.

No new hydrology study is being performed nor is one planned.

The "conflict" referred to in the inspection report was addressed in our December 23,

1991, letter based on the December 1991 hydrology report.

To aid in the closure of this open item, we have enclosed the December 1991 hydrology report.

In addition, not all on-site wells are monitored as part of our Radiological Environmental Monitoring Program (REMP).

There are a total of 22 wells for monitoring purposes on-site, some wells serve dual purposes.

Thirteen wells are specifically monitored for REMP purposes; 8

are for National Pollutant Discharge Elimination System (NPDES)

purposes, 5 are for fuel oil tank remediation
purposes, and 4

are for steam generator storage facility leakage detection.

We also wish to clarify item 5

on page 4 of this inspection report.

It is stated that our goal for personnel contamination events is 217; however, the present goal is 246.

Sincerely, E.

E. Fitzpatrick Vice President edg Enclosure cc:

D. H. Williams, Jr.

A. A. Blind - Bridgman J.

R. Padgett G. Charnoff NFEM Section Chief NRC Resident Inspector

- Bridgman