ML17334B318

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jul 1989 for DC Cook Unit 2
ML17334B318
Person / Time
Site: Cook American Electric Power icon.png
Issue date: 07/31/1989
From: Everett T
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17325B259 List:
References
NUDOCS 8908150172
Download: ML17334B318 (4)


Text

~

~

~

N.R-C.

OPERATING DATA REPORT DOCKET NQ.

5O-=.16 DATE 01-Aug-89 COMPLETED BYT. N. Everett TELEPHONE 616-465-5901 OPERATING STATUS

1. Unit Name D.

C.

Cook Unit

2. Reparting Period Jul y
3. Licensed Thermal Power (MNt) 4 ~

Name Plate Rating (Gross MNe) 5.

Design Electrical Rating

<Net MNe) 6.

Ma><imum Dependable Capacity (GROSS MNe) 7.

Mar.i mum Dependable Capaci ty (Net MNe) 8 ~ If Changes Occur in Capacity Ratings

<It Last Report Give Reasons 2

89 t nates i411 113>

1100 I

1100 1060 ems na.

3 through

7) Since Power Level To Nhich Restricted. If Any (Net MWe) 10 'easons For Restrictians. lf Any:

This Mo.

Yr.

11.

Haurs in Reporting Periad 744. 0 12.

Na. of Hrs. Reactar Nas Critical

'44

~ 0 ia. Reactor Reserve Shutdown Hours 0.0 14.

Hours Generatar on Line 744. 0

15. Unit Reserve Shutdown Hours 0.0 16.

Grass Therm.

Energy Gen.

<MNH) 2508038 17.

Gro~s Elect.

Energy Gen.

<MWH) 790400 18.

Net Elect.

Energy Gen.

(MNH) 762769

19. Unit Service Factor 100.0 20; Unit Availability Factor 100. 0
21. Unit Capacity Factor (MDC Net)
96. 7
22. Unit Capacity Factor

<DER Net)

93. 2
23. Unit Forced Outage Rate 0 ~ 0 24.

Shutdowns Scheduled over Nevt Si v, Months (Type, Next scheduled shutdown is December ~ 1989 ~ for ta Date Cumm.

5087.0

,101519.0 3002.3 665'P7.4 0.0 0.0 2946.1 65156.1 0.0 0.0 939986>

198966240 30>7460 649>2680 2930245 62514910 57.9 65 '

57.S'5.

7 54 ~ M

59. 4
52. 4
57. 9 lo. 1
14. 3 Date, and Durati an):

a one-week ice condenser surveillance outacre.

25. If Shut, Dawn At End af Report Period, Estimated Date af Startup:
26. Units in Test Status (Prior ta Commercial Operation):

Farcast INITIALCRITICALITY INITIAL ELECTRICITY COMMERCIAL QP ERATION Achieved 85'08150172 85'0804 PDR ADGCK 05000316 R

PDC

~

4

~

AVERASE DAILY POWER LEVEL (NWe-Net)

DOCKET NO.

'0-316 UNIT TWO DATE 01-Aug-89 COI'1PLETED BYT.

WE Everett TELEPHONE 616-465-5901 DAY 1

2 4

5 6

7 8

10 12 14 15 16 NONTH AVERAGE DAILY POWER LEVEL 1045 1044 1041 1043 1045 1052 1044 1032 1034 1033 1029 1029 1032 1036 1024 1022 July 89 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 AVERASE DAILY POWER LEVEL 1020 871 865 998 1042 1101 1048 1038 1035 1026 1025 1028 1030 1032 1038

UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH:

JULY, 1989 DOCKET NO.

UNIT NAME:

DATE:

COMPLETED BY:

TELEPHONE:

50-316 D. C. Cook Unit 2 August 4, 1989 T. R. Stephens (616) 465-5901 NO.

DATE T

Y P

El D

H U

0 R

U A

R T

S I

0 N

R E

A S

0 N2 M

S D

R E

H 0

E T

U W

A H

T N

C 0

T T

D I 0

N R

0 G

F LICENSEE EVENT REPORT I S

C Y

0 S

D T

E4 E

M C

C 0

0 M

D P

E5 0

N E

N T

CAUSE AND CORRECTIVE ACTION TO PREVENT RECURRENCE There were no unit shutdowns or significant power reductions from the maximum power level of 100t during the month.

1 F.

S Forced Scheduled Reason:

A:

Equipment Failure (Explain)

B:

Maintenance or Test D:

Refueling E:

Regulatory Restriction F:

Operator Training 6 License Examination G:

Operational Error (Explain)

H:

Other (Explain)

Method:

1:

Manual 2:

Manual Scram 3:

Automatic Scram 4:

Other (Explain)

Exhibit G - Instructions for preparation of data entry sheets for Licensee Event Report (LER) File (NUREG 0161)

Exhibit I:

Same Source

DOCKET NO:

UNIT NAME:

COMPLETED BY:

TELEPHONE:

DATE:

PAGE:

50-316 D.

C.

Cook Unit 2 T. R. Stephens (616) 465-5901 August 4, 1989 1 of 1 MONTHLY OPERATING ACTIVITIES JULY 1989 HIGHLIGHTS The unit entered the reporting period at 100% Rated Thermal Power.

Power was reduced to 87-o to facilitate motor replacement on 523 circ water pump.

Upon completion of 523 circ water pump motor replacement, the unit returned to 100% RTP.

The unit exited the reporting period at 100% RTP.

Gross electrical generation for the month of June was 790400 MWH.

DETAILS 7/3/89 0951 1148 7/17/89 2350 0432 7/20/89 0838 1242 Unusual Event declared due to both D/G's being inoperable.

Exited Unusual Event.

Commenced power reduction for maintenance work on 523 circulating water pump.

Reactor at 87: RTP.

Commenced power increase to 100'-o RTP.

Reactor at 100% RTP.