Docket Nos.
50-315 and 50-316 August 3, 1989 Mr. Milton P. Alexich, Vice President Indiana Michigan Power Company c/o American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43216
Dear Mr. Alexich:
SUBJECT:
ANALYSIS OF D.C.
COOK UNIT 2, CYCLE 8 RELOAD On June 12, 1989, the staff met with AEP and Westinghouse to discuss proposed Technical Specification (TS) changes related to D.C. Cook Unit 2 reload analysis for cycle 8.
A meeting summary is attached.
For cycle 8, AEP proposed to analyze only those events in the Original Final Safety Analysis Report (OFSAR).
The cycle 6 analysis, performed after AEP switched fuel vendors from Westinghouse to ANF, included four additional events not analyzed in the OFSAR and considered three other events that were bounded by OFSAR analyses.
At the conclusion of the meeting, the staff indicated that AEP would be informed of the acceptability of excluding these additional seven events from the cycle 8 reload analysis.
The staff has determined that the seven additional events analyzed for cycle 6
and currently discussed in Section 14 of the Updated Final Safety Analysis Report (UFSAR) are not part of the licensing basis and, therefore, are not required to be analyzed for cycle 8.
However, the staff expects that the license amendment application provided by AEP in support of 'the cycle 8 reload will sufficiently address why exclusion of these seven events does not involve a significant hazards consideration, by applying the standards in 10CFR 50.92.
Sincerely
Enclosure:
As stated Joseph G. Giitter, Project Manager Project Directorate III-1 Division of Reactor Project - III, IV, V, and Special Projects Office of Nuclear Reactor Regulation I
~O (9m~,
000.
OiO OO
&b7 Igloo biR
,ND (VD OA COOK
%Q Q.
DISTRIBUTION:
NRC 8 Local PDRs PDIII-1 r/f OGC EJordan ACRS (10)
PD I JG
- km 0
P 9
MVirgi1io LYandell JGiitter MHodges BGrimes 08/Lt /89 cc w/enclosure:
See next page PDIII-LYandel 08/Q /
pol
gp,R REDO
~o oN o +R **+
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 August 3, 1989 Docket Nos. 50-315 and 50-316 Mr. Milton P. Alexich, Vice President Indiana Michigan Power Company c/o American Electric Power Service Corporation 1 Riverside Plaza
- Columbus, Ohio 43216
Dear Mr. Alexich:
SUBJECT:
ANALYSIS OF D.C.
COOK UNIT 2, CYCLE 8 RELOAD F
On June 12, 1989, the staff met with AEP and Westinghouse to discuss proposed Technical Specification (TS) changes related to D.C.
Cook Unit 2 reload analysis for cycle 8.
A meetino summary is attached.
For cycle 8, AEP proposed to analyze only those events in the Original Final Safety Analysis Report (OFSAR).
The cycle 6 analysis, performed after AEP switched fuel vendors from Westinghouse to ANF, included four additional events not analyzed in the OFSAR and considered three other events that were bounded by OFSAR
. analyses.
At the conclusion of the meeting, the staff indicated that AEP would be informed of the acceptability of excluding these additional seven events from the cycle 8 reload analysis.
The staff has determined that the seven additional events analyzed for cycle 6
and currently discussed in Section 14 of the Updated Final Safety Analysis Report (UFSAR) are not part of the licensing basis and, therefore, are not required to be analyzed for cycle 8.
However, the staff expects that the license amendment application provided by AEP in support of the cycle 8 reload will sufficiently address why exclusion of these seven events does not involve a significant hazards consideration, by applying the standards in 10CFR 50.92.
Sincerely
Enclosure:
As stated Joseph G. Giitter, Project Manager Project Directorate III-1 Division of Reactor Project - III, IV, V, and Special Projects Office of Nuclear Reactor Regulation cc w/enclosure:
See next page
Mr. Milton Alexich Indiana Michigan Power Company Donald C.
Cook Nuclear Plant CC:
Regional Administrator, Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 Attorney General Department of Attorney General 525 West Ottawa Street Lansing, Michigan 48913 Township Supervisor Lake Township Ha11 Post Office Box 818 Bridgeman, Michigan 49106 W. G. Smith, Jr., Plant Manager Donald C.
Cook Nuclear Plant Post Office Box 458 Bridgman, Michigan 49106 U.S. Nuclear Regulatory Commission Resident Inspectors Office 7700 Red Arrow Highway Stevensvil le, Michigan 49127 Gerald Charnoff, Esquire Shaw, Pittman, Potts and Trowbr idge 2300 N Street, N.W.
Washington, DC 20037 Mayor, City of Bridgeman Post Office Box 366
. Bridgeman, Michigan 49106 Special Assistant to the Governor Room 1 - State Capitol Lansing, Michigan 48909 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health Department of Public Health 3500 N. Logan Street Post Office Box 30035 Lansing, Michigan 48909 Mr. S.
Brewer American Electric Power Service Corporation I Riverside Plaza
- Columbus, Ohio 43216