ML17334B122

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses DPR-58 & DPR-74, Reflecting Replacement of Liquid Radwaste Effluent Line Monitor.Addl Info in Response to NRC 870106 Ltr Also Discussed.Proposed Tech Specs Encl.Fee Paid
ML17334B122
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 08/07/1987
From: Alexich M
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To: Murley T
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML17334B123 List:
References
AEP:NRC:0956D, AEP:NRC:956D, NUDOCS 8708130281
Download: ML17334B122 (7)


Text

FV/V~0 QGC./CT~

REGULATO Y INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 8708130281 DOC. DATE: 87/08/07 NOTARIZED: NO DOCKET FAG IL: 50-,315 Donald C. Cook Nucleal Pomer P)anti Unit ii Indiana 0 05000315 50-316 Donald AUTH. NAME C.

AUTHOR Cook Nuc lear Poeer P AFFILIATION lant'nit 2z Indiana & 05000316 ALEXICHIM. P. Indiana 5 Michigan Electric Co.

RECIP. NAME RECIPIENT AFFILIATION MURLEYi T. E. Document Control Branch (Document Control Desk)

SUBJECT:

Application for amends to Licenses DPR-58 5 DPR replacement of liquid radmaste effluent line 74'eflecting monitor. Proposed revised Tech Spec pages encl. Fee paid.

DISTRIBUTION CODE: AOO'9D COPIES RECEIVED: LTR I ENCL J SIZE:

TITLE: OR!Li c ens ing Submi tta 1: Ap p end i x I NOTES:

RECIPIENT COPIES RECIPIENT COP IES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 LA 1 0 PD3-3 PD 5 5 WIGGINGTONr D 1 1 INTERNAL: ARM/DAF/LFMB 1 0 NRR/DREP DIR 1 1 NRR/DREP/RPB 1 1 NRR/PMAS/PMSB 1 1 OGC/HDS1 1 0 REG FILE 01 1 1 RES/DE/EIB 1 1 EXTERNAL: LPDR 1 NRC PDR 1 1 NSIC 1 1 R ~~ PI50

%OR.-OI ft

'OTAL"NUMBER OF COPIES REQUIRED: LTTR 17 ENCL 14

INQI4N4 8 MICHIGAN ELECTRIC COMPANY PoO. BOX 16631 COLUMBUS, OHIO 43216 August 7, 1987 AEP'NRC:0956D Donald C. Cook Nuclear Plant Units 1 and 2 Docket Nos. 50-315 and 50-316 License Nos. DPR-58 and DPR-74 REVISED RADIOACTIVE LIQUID EFFLUENT MONITORING INSTRUMENTATION TECHNICAL SPECIFICATION CHANGE REQUEST U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Attn: T. E. Murley

Dear Dr. Murley:

This letter and its attachments constitute an application for amendment to the Technical Specifications (T/Ss) for the Donald C. Cook Nuclear Plant Units 1 and 2. Specifically, we are proposing changes to T/S 3.3.3.9, Table 3.3-12, and T/S 4.3.3.9.2, Table 4.3.8 to reflect the replacement of the liquid radwaste effluent line monitor. The reasons for the proposed changes and our analysis concerning significant hazards considerations are contained in Attachment 1 to this letter. The proposed revised Technical Specification pages are contained in Attachment 2.

In AEP:NRC:0956C, dated December 8, 1986, we submitted a T/S change request to reflect the replacement of the subject monitor. In that letter, the significant hazards considerations analysis was made on the basis that the change was purely administrative. In a letter from Mr. B. J. Youngblood to Mr. John Dolan, dated January 6, 1987, the NRC notified us that'etails were not provided on why the monitor was being changed, what enhancements were expected with the new monitor, or how the new monitor would meet the requirements at its location. This letter provides the additional information along with a revised significant hazards considerations analysis.

We are assessing potential difficulties with setpoints for the new monitor due to its increased sensitivity., Until these potential difficulties are resolved, we will continue to use the existing (R-18) instrumentation as specified in the proposed T/S changes.

4) .] (50 (pl g0$

g) ~

q EPOBf&~s~g00pgf PDR ADDCK D , 5 pDR

~ .

Dr.'. E. Murley "AEP:NRC:0956D N

We believe that the proposed changes will not result in (1) a significant change in the types of effluents or a significant increase in the amounts of any effluent that may be released offsite, or (2) a significant increase in individual or cumulative occupational radiation exposure.

These proposed changes have been reviewed by th'e Plant Nuclear Safety Review Committee (PNSRC) and will be reviewed by the Nuclear Safety and Design Review Committee (NSDRC) at their next regularly scheduled meeting.

In compliance with the requirements of 10 CFR 50.91(b)(1), copies of this letter and its attachments have been transmitted to Mr. R. C. Callen of. the Michigan Public Service Commission and Mr. G. Bruchmann of the Michigan Department of Public Health.

Pursuant to 10 CFR 170.12(c), we have enclosed an application fee of

$ 150.00 for the proposed amendments.

This document has been prepared following Corporate procedures which incorporate a reasonable set of controls to insure its accuracy and completeness prior to signature by the undersigned.

Very truly yours, M.  ; Al ich

=

Vice President cm Attachments II

c'c'."; John.E. Dolan W. G..- Smith, Jr.

-'ridgman R. C. Callen G. Bruchmann G. Charnoff NRC Resident Inspector - Bridgman A. B. Davis - Region III

ATTACHHENT 1 TO AEP:NRC:0956D REASONS AND 10 CFR 50.92 ANALYSIS FOR CHANCES TO THE DONALD C. COOK NUCLEAR PLANT UNIT NOS. 1 AND 2 TECHNICAL SPECIFICATIONS

Attachment to AEP:NRC:0956D Page 1 The first proposed change is to T/S Table 3.3-12, Item l.a. The current monitor, referred to as 1-R-18 in the Unit 1 T/S and 2-R-18 in the Unit 2 T/S, is being replaced by a new monitor, 12-RRS-1001.

The R-18 monitor has had a history of difficulty with background radiation masking the lower portion of its range. Actions taken to address this difficulty have been only partially successful. The first action taken involved moving the monitor from its original location, the Boric Acid Storage Tank Room, to outside the room's shield wall. This reduced the ambient background radiation; however, background interference continued to be a problem.

Subsequent investigation showed that, despite the customary flushing of the discharge line and the in-line monitor, the major source of background radiation was crud build-up on the interior surfaces of R-18's detection volume. Periodic disassembly and cleaning were found only temporarily effective 'in reducing the background; after a few batch releases, background would again increase. Due to the nature of waste liquid, build-up of background producing residue is unavoidable. This is compounded by the mechanical arrangement of R-18's detector assembly which causes it to be a natural crud trap. In addition, its connection and mounting detail make it difficult to remove for cleaning.

Several enhancements are expected with RRS-1001, which we believe will address problems encountered with R-18. RRS-1001's detector assembly uses a replaceable bowl-shaped liner provided with a low point drain. This shape discourages crud build-up and facilitates more effective flushing. If flushing in a particular, instance is unsuccessful, the sample liner is easily replaced.

The new monitor is more sensitive to gamma emitters than R-18. This is largely attributed to differences in geometry between the chambers. The greater sensitivity of the new monitor monitors'easurement enhances our ability to monitor batch releases.

R-18's detector -assembly is in-line and all the discharge flows through it. RRS-1001 requires a reduced flow, and therefore, it is connected such that about 10% of the main flow is diverted through i,ts shielded sample liner. The sample line contains a flow meter with ancillary flow switches. A loss of sample flow will automatically terminate discharge.

The new monitor uses a microprocessor-based Data Acquisition Module (DAM), which performs the interpretation of detector output and electronically records the result. Sample flow and discharge flow signals are also input into the DAM for electronic recording in its computer memory. The DAM is integrated into our Eberline system; consequently, the Haste Disposal System (WDS) discharge information along with the new monitor's status is readily available for presentation.

Attachment to AEP:NRC:0956D Page 2 Upon switching to RRS-1001 and its required support equipment,

. control room annunciation and indication will be via the Eberline System Control Terminals. The R-18 readout drawer in panel RMS and its associated Electrolarm and panel board annunciator will no longer be used.

The second proposed change is to Table 4.3-8, Instrument l.a and its associated Table Notation. Specifically, we are proposing the addition of periodic Channel Functi.onal Tests as a surveillance requirement. This additional surveillance requirement would demonstrate the operability of the sample line with regard to ensuring automatic isolation of the release pathway and ensuring control room annunciation, upon loss of sample flow.

The third proposed change is also to Table 3.3-12. While the physical installation of the new monitor is essentially complete, the monitor will not be capable of meeting T/S requirements until (1) the trip function is transferred from R-18, and (2) post-installation calibration and testing is complete. Therefore, we request that a footnote be added to allow the existing monitor (1-R-18/2-R-18) to fulfillthe T/S requirements until the new monitor is declared operable.

The fourth proposed change is also to Table 3.3-12. We have added a footnote to the table to indicate that operability of flow switch RFS-1010 is required for operability of 12-RRS-1001.

Analysis of Si nificant Hazards Per 10 CFR 50.92, a proposed amendment will involve no significant hazards considerations if the proposed amendment does not:

(1) involve a significant increase in the probability or consequences of an accident previously analyzed, (2) create the possibility of a new or different kind of accident from any accident previously analyzed or evaluated, or (3) involve a significant reduction in a margin of safety.

Our evaluation of the proposed change with respect to these criteria is provided below.

Criterion 1:

The new monitor will be able to support current T/S requirements and includes several enhancements over the old monitor. Design of the new monitor provides solutions to difficulties encountered with the old monitor. An additional T/S surveillance is proposed and is commensurate with the design of the new monitor. Thus, we are proposing a better monitor with appropriate surveillance requirements. Therefore, we believe the proposed change will not involve a significant increase in the probability or consequences of an accident previously analyzed.

I Attachment to AEP:NRC:0956D Page 3 Criterion 2:

The proposed change will not place the plant in a new or unanalyzed condition; therefore, it will not create the possibility of a new or different kind of accident from any accident previously analyzed or evaluated.

Criterion 3:

Ve believe that the proposed change will not involve a significant reduction in a margin for safety for the reasons given in Criterion 1 above.

The Commission has provided guidance concerning the determination of significant hazards by providing certain examples (48 FR 14780) "of amendments considered not likely to involve significant hazards considerations. Ve believe the proposed change is less likely than the sixth example in the above guidance to involve a significant hazards consideration. Specifically, we believe the proposed change will not result in an increase in the probability or consequences of a previously analyzed accident or reduce a safety margin, and is within all acceptable criteria with respect to the system design. Therefore, we believe this change does not involve a significant hazards consideration as defined in 10 CFR 50.92.