ML17334A619
| ML17334A619 | |
| Person / Time | |
|---|---|
| Site: | Cook |
| Issue date: | 01/13/1998 |
| From: | Grant G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Fitzpatrick E AMERICAN ELECTRIC POWER CO., INC. |
| Shared Package | |
| ML17334A620 | List: |
| References | |
| 50-315-97-18, 50-316-97-18, NUDOCS 9801210190 | |
| Download: ML17334A619 (8) | |
See also: IR 05000315/1997018
Text
gAR 4EC(g~
P0
Cy
0
p"
++*++
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION III
801 WARRENVILLEROAD
LISLE, ILLINOIS60532-4351
January 13, 1998
Mr. E. E. Fitzpatrick
Executive Vice President
Nuclear Generation Group
American Electric Power Company
500 Circle Drive
Buchanan,
MI 49107-1395
SUBJECT:
NOTICE OF VIOLATIONAND NRC INSPECTION REPORT
NO. 50-315/97018(DRP); 50-316/97018(DRP)
Dear Mr. Fitzpatrick:
On November 7, 1997, the NRC completed an inspection at your D. C. Cook 1 and 2 reactor
facilities. The enclosed report presents the results of that inspection.
During the 6-week period covered by this inspection report, the inspectors observed that the
plant was operated in a safe manner, maintenance was generally performed well, and
radiological work practices were properly followed.
Based on the results of this inspection, one violation of NRC requirements was identified. The
violation is cited in the enclosed Notice of Violation (Notice), and the circumstances
surrounding
it are described in detail in the subject inspection report. The violation is of concern because the
inspectors identified two examples of inadequate operations procedures, that were used for
cross-tying safety-related buses, containing Insufficient guidance to ensure that the activities
were properly conducted.
A third example of the violation identified a procedure that contained
incorrect set points and is of concern because the emergency operating procedure for
responding to reactor trips and safety injections contained values different than the plant set-
point document.
You are required to respond to this letter and should followthe instructions specified in the
enclosed Notice when preparing your response.
The NRC willuse your response,
in part, to
determine whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
~>) +pe 'j
lllllllllllllllllllllllllllllllllllllll
980i2iOi90 980ii3
ADQCK 050003i5
8
E. Fitzpatrick
-2-
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its
enclosures,
and your response will be placed in the NRC Public Document Room.
Sincerely,
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket No. 50-315, 50-316
Enclosures:
1.
2.
Inspection Report
No. 50 315/970018(DRP); 50-316/97018(DRP)
cc w/encls:
A. A. Blind, Site Vice President
John Sampson,
Plant Manager
Richard Whale, Michigan Public
Service Commission
Michigan Department of
Environmental Quality
lt
E. Fitzpatrick
-2-
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its
enclosures,
and your response willbe placed in the NRC Public Document Room (PDR).
Sincerely,
/s/ Narc L. Dapas
Docket No. 50-315, 50-316
Geoffrey E. Grant, Director
Division of Reactor Projects
Enclosures:
cc w/encls:
1.
2.
Inspection Report
No. 50-315/970018(DRP); 50-316/97018(DRP)
A. A. Blind, Site Vice President
John Sampson,
Plant Manager
Richard Whale, Michigan Public
Service Commission
Michigan Department of
Environmental Quality
Distribution:
Docket File w/encls
PUBLIC IE-01 w/encls
Project Manager, NRR w/encls
Rill Enf. Coordinator w/encls
CAA1 w/encls (E-mail)
TSS w/encls
DRP w/encls
A. B. Beach w/encls
Deputy RA w/encls
Rill PRR w/encls
DRS (2) w/encls
DOCDESK (E-mail)
DOCUMENT NAME: R:Insprptshpowershcookhdcc97018.drp
SEE PREVIOUS CONCURRENCES
To recehre e copy of this document, Indicete In the box
C
~ Copy without ettechment/enclosure
E
m Copy with ettechment/enclosure
N" aNoco
OFFICE
Rill
Rill
Rill
Rill
NAME
Schweibinz:dp
Burgess
Creed
Grant
DATE
01/ /98
01/ /98
01/ /98
01P'898
OFFICIALRECORD COPY
E. Fitzpatrick
-2-
In accordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of this letter, its
enclosures,
and your response willbe placed in the NRC Public Document Room (PDR).
Sincereiy,
/s/ Narc L. Dapas
Geoffrey E. Grant, Director
Division of Reactor Projects
Docket Nos. 50-315, 50-316
Enclosures:
1.
2.
Inspection Report
No. 50-315/970018(DRP); 50-316/97018(DRP)
cc w/encls:
A. A. Blind, Site Vice President
John Sampson,
Plant Manager
Richard Whale, Michigan Public
Service Commission
Michigan Department of
Environmental Quality
Distribution:
Docket File w/encls
PUBLIC IE-01 w/encls
Project Manager, NRR w/encls
Rill Enf. Coordinator w/encls
CAA1 w/encls (E-mail)
TSS w/encls
DRP w/encls
A. B. Beach w/encis
Deputy RA w/encls
Rill PRR w/encls
DRS (2) w/encls
DOCDESK (E-mail)
DOCUMENT NAME: R:hlnsprptstpowershcookhdcc97018.drp
To receive s copy of this document, Indlcste In the box
C
~ Copy without sttschmentlencloeure
E
s Copy wtth sttschment/enclosure
N
s Noes
OFFICE
NAME
.
DATE
Rill
Schweibinz:d
@
0119/98
Rill
p
I
Bur
s
01498
RIII
01
/98
RIII
Grant
01/ /98
OFFICIALRECORD COPY
0